Active Transportation Planning and Implementation Assistance

Location: Minnesota
Posted: Nov 5, 2026
Due: Nov 13, 2026
Agency: State Government of Minnesota
Type of Government: State & Local
Category:
  • C - Architect and Engineering Services - Construction
  • R - Professional, Administrative and Management Support Services
Publication URL: To access bid details, please log in.
Active Transportation Planning and Implementation Assistance

Brief Description: MnDOT’s Active Transportation Program envisions a future where all people in Minnesota have access to safe and convenient active transportation where they live, work, and play. The program will help rural and urban communities to improve places for people walking, bicycling, and rolling by providing funding support for planning, education, encouragement, engineering studies, and infrastructure investment. The non-infrastructure side of the program includes multiple ways for all communities to make walking, bicycling, and rolling safer, more convenient, and more accessible. Non-infrastructure awards from the program may be used to support planning, installation of demonstration projects, education, engagement, encouragement, and other non-infrastructure activities. This contract is necessary for the agency to fulfill non-infrastructure components of Minnesota’s statutory Active Transportation program [174.38 Subd. 6a (2)]. The successful responder will provide services and technical assistance to prepare Minnesota communities to seek infrastructure funding through the Active Transportation program or from other sources.

Date posted: 10/22/2026
Due date: 11/13/2026

Attachment Preview

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
PROJECT BACKGROUND
MnDOT's Active Transportation Program envisions a future where all people in Minnesota have access to safe and
convenient active transportation where they live, work, and play. The program will help rural and urban communities to
improve places for people walking, bicycling, and rolling by providing funding support for planning, education,
encouragement, engineering studies, and infrastructure investment. The non-infrastructure side of the program includes
multiple ways for all communities to make walking, bicycling, and rolling safer, more convenient, and more accessible.
Non-infrastructure awards from the program can be used to support planning, installation of demonstration projects,
education, engagement, encouragement, and other non-infrastructure activities.
This scope of work includes three major project tasks (planning assistance, non-infrastructure technical assistance, and
program evaluation and development), with subtasks to ensure that each task is carried out effectively. Currently
available funding for the Active Transportation Program will be administered by the end of 2029; activities and project
schedules in proposals should reflect this timeline.
Assumptions
Minnesota is one of the leading states for active transportation planning, engagement, programming, design, and
construction. MnDOT assumes that successful responders will have deep familiarity with MnDOT's Statewide Pedestrian
System Plan, statewide bicycle planning efforts, Facility Design Guide, Bicycle Facility Design Manual, Advancing
Transportation Equity Initiative, and other relevant statewide planning documents.
Based on experience with active transportation planning assistance in Minnesota, MnDOT recommends that most
activities included in Task 1 should occur within the months of March-November. Task 1 activities will occur in two
cycles, one beginning in Spring 2027 and one beginning in Spring 2028. Additionally, successful responders should
demonstrate their capacity to deliver creative and effective virtual-enabled planning activities in addition to in-person
planning activities.
Furthermore, most activities in Task 2 should take place between November and June with demonstration projects
planned for installation when the weather warms in Spring. Task 2 activities will occur in two cycles, one beginning in
Fall 2027 and one beginning in Fall 2028.
Definitions
This scope of work contains repeated terms that are important for all parties to understand to proceed. Please refer to
the definitions below:
Active Transportation: Active transportation is defined in Minnesota statute 174.38 as "bicycling, pedestrian
activities, and other forms of nonmotorized transportation." MnDOT's Office of Transit & Active Transportation also
considers the definition from the American Association of State Highway and Transportation Officials helpful: "Using
human-powered means of travel to get from one place to another, which includes walking, bicycling, and the use of
mobility assistive devices; and can also incorporate other human-scale modes like electric-powered, electric-
assisted, or micromobility devices such as e-bikes and e-scooters."
Local Planning Team: A larger group of local stakeholders who serve as a project advisory committee for
communities selected to receive planning assistance through a MnDOT solicitation.
Local Implementation Team: A group of local stakeholders who serve as a project advisory committee for
supplemental implementation assistance. This group can be the same as the Local Planning Team, a subset of it, or
include other stakeholders with relevant experience.
1

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
Supplemental Implementation Assistance: Professional services provided to communities selected to receive
planning assistance that augments the planning process. This scope of work details six types of professional services
that should, at minimum, be offered in Task 2.
Team Leaders: Typically, one to three people who serve as local project coordinators/champions for communities
selected to receive planning assistance and supplemental implementation assistance services through a MnDOT
solicitation. They are a part of the Local Planning Team and Local Implementation Team.
PROJECT TASKS AND DELIVERABLES
The Successful Responder will be responsible for completing the following tasks:
Task 1: Planning Assistance
Active Transportation Planning is a critical component of MnDOT's Active Transportation Program - helping
communities to envision how active transportation improvements can increase access to safe and
convenient active transportation where they live, work, and play. For this project, Active Transportation
plans will be completed for local units of government - the focus of these plans can be at the corridor,
higher-education campus, city, park district, or county level. Federally recognized Indian Tribes are also
eligible to receive assistance. Plans completed in this contract will have been awarded through the MnDOT
Active Transportation Program planning assistance solicitation(s). Scoring criteria for solicitations will focus
on community existing conditions, equity, and demonstrated local support among other factors. Potential
awardees can be from any part of Minnesota. It is anticipated that approximately 20 plans will be completed
in two rounds over the course of the three-year contract term.
MnDOT will work with the successful responder and selected communities to provide access to training,
education, and resources on Active Transportation planning best practices. Potential respondents are
encouraged to explore partnerships with Minnesota's Regional Development Organizations, Metropolitan
Planning Organizations, and/or local service organizations who work directly with people experiencing
transportation challenges to tap into local knowledge and expertise
Task 1.1: Determine Planning Assistance Needs for Applicants
Task 1.1.1: Work with MnDOT's Active Transportation Program staff to determine the scope of planning
assistance to be provided for each selected applicant. Some assistance will be provided to all selected
communities.
Task 1.1.2: Summarize the information gathered in the lead up to the AT planning process.
Deliverables: Review applications, work with MnDOT to clarify level of work needed in each community.
Task 1.2: Initial Contact with Project Applicant
Task 1.2.1: The successful responder will make contact with the Team Leader(s) of the community's
Active Transportation Local Planning Team to introduce the project. Introductory contact with the lead
member(s) should include:
(a) Contact information for the project manager and planner assigned to the project.
(b) An outline of the Active Transportation planning process.
(c) The table of contents for the final Active Transportation plan (plan outline can be found at the end
of this Scope of Work [SOW]).
2

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
(d) A request for a list of members of the Active Transportation Local Planning Team with name, title,
agency or contingency represented
(e) Identifying additional partners for the team who can bring valuable perspective to the planning
process, especially community-based organizations.
(f) Identifying MnDOT District staff when applicable.
(g) A one-page memo regarding expectations for members of the Active Transportation Local Planning
Team.
(h) A template table of task-level responsibilities to be completed by successful respondent and
consultant team, local Team Leader(s) and Local Planning Team, and MnDOT Active Transportation
staff. These tasks should be presented as negotiation between all parties.
(i) A meeting invitation for a kick-off event that can be shared with other members of the Active
Transportation planning team.
Task 1.2.2: Communications with Team Leader(s). There are two critical components of communication
with the Team Leader(s):
1. Team Leader(s) calls: Set up a monthly call with each community's Team Leader(s) for the duration
of the project. This is an important opportunity to keep the Team Leader(s) engaged in key
milestones and identify any issues that will impact implementation priorities.
2. Shared Project File Management: Implement a simple and easy way to access the project files,
notes, etc., where parties will be able to view all project information from anywhere with a standard
internet connection. Include specific and detailed instructions for key tasks for the Active
Transportation Local Planning Teams, such as how to complete hand tallies, community surveys, and
neighborhood assessments.
Deliverables: Shared project file management system; Monthly 30-60-minute-long calls with each of the
Active Transportation Planning Team Leaders
Task 1.3: Introduction and Kick-off Meetings
Task 1.3.1: Schedule an introductory meeting with community Team Leader(s). This meeting is an
opportunity to introduce the project managers from the successful responder, MnDOT, and local
community to each other and ground the local Team Leader(s) in the planning process. This is also an
opportunity to answer questions about a community's application; discuss planning protocol,
responsibilities, and timelines; and complete the task-level responsibilities template from Task 1.2.1.
Task 1.3.2: Schedule and co-facilitate a kick-off meeting in each community including the Active
Transportation Local Planning Team. This meeting is an opportunity to share information about the
process with those who will be most engaged in developing the plan. This meeting should also leave
attendees with a clear vision for this Active Transportation planning effort in their community. Consider
inviting key elected official representatives from the community to build awareness and cultivate buy-in.
Kick-off meetings should include the following at minimum:
(a) An introduction to the local Active Transportation Local Planning Team, including Team Leader(s).
Provide suggestions for additional members, especially representatives of Community Based
Organizations
(b) A presentation providing an overview of the Active Transportation planning effort, including the
purpose and benefits of active transportation, planning process timeline and goals, and the role of
the Active Transportation Local Planning Team
(c) A review of the Active Transportation planning assistance application, including goals identified by
the applicant
(d) A discussion focused on highlighting local issues and concerns
(e) A process and strategy document to engage local elected officials throughout the planning effort.
3

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
(f) Developing a shared vision statement to guide the planning process - a draft should be provided to
the community to generate discussion.
Deliverables: Agenda for meeting; Presentation for meeting; Attendance by at least two team members at
each; Summary of minutes for distribution to participants-distributed prior to first team call; Draft Vision
Statement for distribution to each team; Final Vision Statement to guide planning and insert into Draft Plan
Note: Tasks 1.4 and 1.5 will require the successful responder to work with the Active Transportation Local
Planning Team to identify up to 5 key destinations in the community for active transportation in addition to
under-resourced neighborhoods/areas of the community where special focus should be paid to conducting
walk audits, data collection, and engagement events.
Task 1.4: Surveys and Engagement
Task 1.4.1: During the first meeting and subsequent conversations, work closely with the Active
Transportation Local Planning Team to assess potential needs and opportunities for designing and
delivering inclusive, accessible, and target-group specific engagement formats for community
conversations about active transportation. Engagement and community-led research should center
diverse voices and should include innovative and targeted strategies that meet the community where
they are in terms of time, resources and energy available to disseminate and lead activities. In
partnership with the Local Planning Team, determine reasonable quantitative goals for community
engagement. Prepare, distribute, collect, and summarize data collection tools including, but not limited
to, the following:
(a) Community-specific web pages: to collate public-facing information about planning efforts and
digital engagement tools. This should include a location-specific interactive map platform.
Provide a survey tool that allows participants to identify and select locations on a map interface
to document issues, concerns, or benefits seen by the participant. MnDOT recommends use of
Let's Talk Transportation platform administered by MnDOT's Office of Communications & Public
Engagement in most cases.
(b) Active Transportation community assessment survey: A survey tool to assess community
readiness to advance active transportation recommendations, including those related to both
infrastructure and non-infrastructure.
(c) Community equity analysis: Host focus group conversations with community service
organizations to better understand how investments in active transportation could advance
equity in the community.
(d) Formal presentation for Active Transportation Team Leaders: Develop a presentation for the
use of Team Leader(s) during meetings, virtual open houses, or other community-led events.
Design the presentation to provide an overview of active transportation planning and the
benefits to communities.
(e) Pop-up event(s): Assist the Active Transportation Local Planning Team in preparing for existing
community event(s), such as spring carnival, Bike Rodeo, or a fall back to school festival. The
purpose is to introduce the community to active transportation at a fun event that they are
already likely to attend. Support the development of materials so that they are easy to use and
modify by Active Transportation Local Planning Team members in each community for existing
and future outreach events.
Contract with locally relevant Regional Development Organization (RDO) transportation planners to staff
pop up events and conduct additional engagement. The successful responder and RDOs should have a
mutually agreed upon scope of work for these activities.
4

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
Responders are encouraged to consider innovative engagement strategies that meet the community
where they are in terms of time, resources, and energy available to participate and result in an
engagement sample that aligns with community demographics.
Task 1.4.2: Prepare a work plan for local Team Leader(s) to promote and execute engagement efforts,
then to collect and share engagement results with contractor. Responder should assume that most
engagement should be completed by Active Transportation Local Planning Teams and contracted RDO
staff, however the successful responder can assist as necessary per the responsibilities negotiation in
Task 1.2.1.
Task 1.4.3: Prepare reports for Active Transportation Local Planning Team to document engagement
findings and share summary and trends with them.
Deliverables: Survey mechanisms hosted by selected respondent and MnDOT, deployment of
outreach/engagement tools (e.g. website, interactive map, surveys, focus group script, PowerPoint
presentation), scopes of work with RDO staff, engagement findings summary.
Task 1.5: Active Transportation Community Summit and Audit
Task 1.5.1: Prepare for and assist community in hosting an in-person action planning "summit" that
includes a minimum of one experiential engagement activity, which can be walking audit(s), bicycling
audit(s), and innovative neighborhood meeting(s), as well as a network mapping workshop. Appropriate
experiential engagement activities such as those listed will depend on the community and the
determined plan and should be negotiated between all parties but can include multiple of certain
activities or eliminating activities from the planning process. Respondent should plan to provide two
staff for summit events in-person.
The Active Transportation Local Planning Team will be responsible for identifying the date and location
for the activity, publicizing it, and recruiting and assembling participants. The Active Transportation
Local Planning Team and consultant will work together to identify key routes or locations that should be
included in the activity. This should include critical community destinations or corridors that people can
use to access critical destinations. The successful responder and Active Transportation Planning Team
should reference the Minnesota Department of Health's Inclusive Walk Audit in planning the event(s).
Task 1.5.2: Prepare an aerial map of the experiential engagement activity area with streets and other
landmarks labeled.
Task 1.5.3: At the event, meet with the Active Transportation Local Planning Team and community to
provide an overview of the activity and volunteer training with examples of walking and biking
impediments to include.
Task 1.5.4: Distribute and collect feedback tools from participants.
Task 1.5.5: Document summit and engagement activities using a combination of photography,
videography, and/or audio recording for use in Action Plan document(s) and presentation materials.
Task 1.5.6: Summarize the information gathered in the existing conditions section of the Action Plan.
5

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
Deliverables: Presentation to orient participants; Map of community area for use during activity; feedback
tools for participants; Summary of key findings from the activity and map-based survey including annotated
Aerial Photo of the community for inclusion in the Existing Conditions Memorandum development in Task
1.6.
Task 1.6: Assessment of Issues and Barriers
Task 1.6.1: Work with the Active Transportation Planning Team to collect, review, and summarize all
relevant existing materials, documents, and reports that apply to active transportation planning,
including:
(a) Existing policies, studies, and programs.
(b) Determined projects.
(c) Walking and bicycling infrastructure.
(d) Community land uses and zoning.
(e) Road and street network with identified road jurisdictions.
(f) Transit service.
(g) Connectivity and convenience to key destinations.
Task 1.6.2: Obtain crash data for the community, existing traffic count data, and speed limit data for use
in planning recommendations.
Deliverables: Completed assessment of relevant materials; an existing conditions memo, including an
annotated typical section or photograph relevant to the Action Plan, for insertion into the Draft Plan; an
existing conditions maps for insertion into the Draft Plan, including (as available): crash data, speed limits,
transit availability, existing walking and bicycling infrastructure.
Task 1.7: Develop Draft Strategies and Action Steps
Task 1.7.1: Based on the results of the assessments, surveys, and neighborhood meeting, identify
strategies to increase the number of people who have access to safe and convenient active
transportation through projects, policies, professional practices, and programs.
Task 1.7.2: For each strategy, develop a list of draft action steps, including both short-term and long-
term steps that cover equity, engineering, education, encouragement, engagement, and evaluation as
appropriate.
Deliverables: A Draft Recommendations Memo/map, outlining draft strategies and action steps, delivered
electronically to the Team Leader(s) within a reasonable time prior to the Action Plan Meeting (Task 1.8).
Task 1.8: Action Plan Meeting
Task 1.8.1: Attend virtual Active Transportation Action Plan Meeting to obtain input on the determined
strategies and action steps. The Active Transportation Local Planning Team will come prepared to
discuss and prioritize the recommendations.
Task 1.8.2: Update the Draft Recommendations Memo based on feedback from the Active
Transportation Local Planning Team, including prioritization action steps based on cost, difficulty, and
timeline.
6

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
Deliverables: Agenda for meeting; Presentation materials for meeting; Attendance by at least two team
members at each of the meetings scheduled for a community; Summary of meeting including changes to
recommendations and priorities discussed. An Updated Recommendations Memo, for insertion into the
Draft Plan.
Task 1.9: Draft Active Transportation Action Plan
Task 1.9.1: Assemble a Draft Plan, consistent with best practices in Active Transportation planning that
reflects input gathered throughout the planning process and the needs of the local community.
Task 1.9.2: Update elements of the plan created through the process to reflect feedback from the Active
Transportation Local Planning Team and compiled and consolidated into a single Draft Active
Transportation Plan.
Deliverables: Electronic Version of the complete Draft Plan, delivered to the Team Leader(s); Prepare and
distribute specific directions for draft review, including spreadsheet for comments. These instructions will be
emailed to the team, sent directly to the Team Leader(s).
Task 1.10: Draft Plan Review Meeting
Task 1.10.1: Offer opportunity to review the plan by key stakeholders, including all roadway authorities
with facilities in the planning area (township, city, county, federally recognized Indian tribe, and state),
regional development organizations, metropolitan planning organizations (if applicable), local public
health practitioners, and other stakeholders as desired. If Team Leader(s) wish to hold a public comment
period, determine timeline to host Draft Plan on planning effort website and collate public comments
before Task 1.10.2.
Task 1.10.2: Attend Draft Plan Review Meeting with the Active Transportation Local Planning Team for
discussion and finalization of the Active Transportation Action Plan. The Active Transportation Local
Planning Team will come prepared to give feedback on the Draft Active Transportation Action Plan.
Task 1.10.3: Assemble comments to the Draft Plan and solicit feedback in writing from Active
Transportation Local Planning Team members within one week of Draft Plan Review Meeting.
Deliverables: Prepare and distribute specific directions for draft review, including spreadsheet for
comments. These instructions will be emailed to the team, sent directly to the Team Leader(s), and posted
on the website; Attendance at a Draft Review Meeting; A Written Summary of Comments on the Draft Plan,
including notes on specific issues discussed during the Draft Review meeting
Task 1.11: Finalize the Active Transportation Action Plan Document
Task 1.11.1: Finalize the Active Transportation Action Plan based on feedback from the Active
Transportation Local Planning Team.
Task 1.11.2: Coordinate an opportunity with the Team Leader(s) to present the plan to the city and/or
county elected officials during a regular meeting.
Task 1.11.3: Provide the Active Transportation Local Planning Team with one editable file and one copy-
ready Portable Document Format (PDF) file of the plan and related documents.
Task 1.11.4: Include the survey results and the assessment results in the appendices and any digital
survey files to use as a baseline for future survey efforts.
7

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
Task 1.11.5: Provide the MnDOT Active Transportation Coordinator with one editable file and electronic
copy-ready PDF version of the Active Transportation Action Plan.
Task 1.11.6: Provide the MnDOT Active Transportation Coordinator with electronic copies of all
photographic, video, and audio documentation from summit, engagement, and other planning activities
as described in Task 1.5.7.
Task 1.11.7: Follow all Minnesota plain language requirements and Americans with Disabilities Act (ADA)
requirements outlined by MnDOT communications. As of posting, MnDOT expects all documents to be
created up to the Web Content Accessibility Guidelines (WCAG) 2.1 at the AA level.
Deliverables: A Hard Copy, Editable Copy and Copy-Ready PDF file of the Final Active Transportation Action
Plan and Related Documents, delivered to the Team Leader(s); An Electronic Copy-Ready PDF Version of the
Active Transportation Action Plan, delivered to MnDOT's Active Transportation Coordinator; A download of
all relevant Active Transportation planning process files, including photographic, video, and audio
documentation, delivered to MnDOT's Active Transportation Coordinator.
Plan Outline
1. One page, poster size visual Executive Summary.
2. An Executive Summary: summary of the key points in the Active Transportation plan.
3. An Introduction: what is Active Transportation? Why is it important? background on community,
Active Transportation Planning Team, status of state and federal support for Active
Transportation.
4. Vision: the vision and goals identified by the Active Transportation Planning team.
5. Existing Conditions: survey results, walk and bike audit results, annotated typical section(s) of
relevant current transportation corridors in community (not to exceed 3 sections), assessment
results.
6. Issue Identification: key issues emerging from surveys, audits, and assessment results.
7. An Action Plan: list of identified strategies with prioritized short- and long-term action steps.
8. Implementation Steps: identify timeline and lead agencies or individuals to implement action
plan.
9. An Evaluation Plan: detailed plan to evaluate progress over time.
10. Appendices: maps, survey results, assessment data, Active Transportation funding resources.
Task 2: Demonstration-, Program-, Design- and Engineering-Based Supplemental Implementation Assistance
Delivery
Communities that are chosen to participate in Active Transportation Planning Assistance through a MnDOT
solicitation will also receive supplemental implementation assistance to implement a demonstration, design,
programmatic, or engineering-based project that augments the Action Plan. There are many steps between
transportation planning and community transformation. To help maintain the momentum generated during
the action planning process, the successful responder will work with planning communities to provide a
supplemental implementation assistance product that builds on previous work to further develop a
recommendation from the Draft Plan or Final Action Plan.
8

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
MnDOT assumes that most communities will choose a demonstration project as their supplemental
implementation assistance. Demonstration projects are short-term, low-cost, temporary changes that are
made to roadway facilities to advance safety and connectivity for people walking and bicycling. The
successful responder for this project will be required to convene planning meetings; develop a Manual on
Uniform Traffic Control Devices (MUTCD)-compliant engineering layouts; purchase materials; assist with
permit application(s); and lead installation of demonstration projects around Minnesota over the three-year
contract term.
Examples of alternative supplemental implementation assistance that selected communities could choose
from should at a minimum include:
(a) Basic cost-scoping estimates and/or preliminary engineering design layout.
(b) Photo morphology and visioning graphics.
(c) Active transportation program and policy implementation roadmaps.
(d) Targeted supplemental engagement activities.
(e) Strategic communications development.
(f) A combination of the above.
MnDOT cannot predict the proportion of services that will be requested by communities during planning
assistance. Responders should seek to demonstrate capacity to deliver all these types of supplemental
implementation assistance. Additionally, responders should assume that delivery of all services should plan
for a comparable outlay/budget.
MnDOT will work with the successful responder and communities selected through the planning assistance
solicitation process to provide access to training, education, and resources on best practices for
implementing or using the chosen supplemental implementation assistance.
Task 2.1: Initial Supplemental Implementation Assistance Development
Task 2.1.1: Work with selected planning assistance communities and MnDOT during Task 1 activities to
identify demonstration project locations and concepts, or other supplemental implementation
assistance project(s), to augment the Action Plan.
Task 2.1.2: Each project partner will have an identified Local Implementation Team, as well as Team
Leader(s). Work with MnDOT to schedule and lead 30-minute calls with each project Team Leader to
confirm members of the Local Implementation Team attend the supplemental implementation
assistance development workshop, identify any requirements in coordination with the road authority or
other stakeholders, and identify any existing planning documents that will be reviewed.
Task 2.1.3: Coordinate one virtual supplemental implementation assistance development workshop per
community. Provide at least two successful responder staff to attend each workshop, including a
Professional Engineer from the contracting team for engineering-based technical assistance. Relevant
members of the Local Implementation Team will attend the workshop, including city and/or county
traffic engineer, city planner, MnDOT district staff, police and fire department staff, and any other
stakeholders who can assist with identifying requirements to develop and implement the supplemental
implementation assistance project.
9

MnDOT Contract Number: 1064027
Exhibit A: Specifications, Duties, and Scope of Work
Task 2.1.4: Work with MnDOT during the first part of the supplemental implementation assistance
development workshop as an opportunity for Local Implementation Team partners to learn more about
the purpose of supplemental implementation assistance projects, review any existing planning
documents, generate ideas for potential supplemental implementation assistance projects and types of
active transportation to improve, and identify goals and potential outcomes (including community
engagement ideas and potential evaluation metrics).
For demonstration projects, include the following in each community:
1. A minimum of one intersection, up to six block lengths, or a combination thereof in each
community.
2. Typical project components such as marked crosswalks, stop lines, curb extensions, median safety
islands, bike facilities, vehicle lane repurposing, or mini traffic circles.
Task 2.1.5: Work with MnDOT during the second portion of the workshop as an opportunity to review
potential project scopes and ultimately select one project for supplemental implementation assistance.
Work with the group to identify initial opportunities and constraints with the selected project. Work
with participants to then draft initial concepts for the supplemental implementation assistance project
as appropriate and share with the rest of the workshop participants. Based on the project selected, work
with the participants to brainstorm potential community and/or business partners to support the
supplemental implementation assistance.
Task 2.1.6: Work with workshop participants to leave with a consensus on the supplemental
implementation assistance project scope and an initial concept. Summarize the results from the
workshops to create the foundation for further planning and design development in subsequent tasks.
Task 2.1.7: Create a scope of work document (including budget and expenses) for the chosen
supplemental implementation assistance project and share with Local Implementation Team and
MnDOT. Allow for one round of revision before finalization.
Deliverables: Coordinate and lead kick-off meetings with up to 20 communities; Prepare presentation
material for the workshops (the same introductory material is generally used for each community, with
some customization based on local context); Coordinate, prepare for, and facilitate up to 20 community
workshops; Scope of work documents for each supplemental implementation assistance project; Summary
notes and action item list from each workshop.
Task 2.2: Develop Initial Supplemental Implementation Assistance Project Concept
Task 2.2.1: Building on the initial discussion and approved scope of work document developed during the
supplemental implementation assistance development workshop, refine a supplemental implementation
assistance project concept.
Task 2.2.2: For each concept, examine the unique set of design, operational, policy, or programmatic issues
related to the project's circumstances to develop initial supplemental implementation assistance project
concepts. To develop the concept, consider the following in coordination with the Local Implementation
Team:
1. For demonstration projects, consider duration (including potential installation and removal dates, and
methods for installing and removing materials), design standards and constraints (including the design
vehicle), maintenance and project stewardship, acceptable materials, permitting, evaluation process and
documentation).
10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Project: IMACS Master Systems Integrator RFR Ref. #: Solicitation221 Department: Purchasing Type: RFP

Metropolitan Airports Commission (MAC)

Bid Due: 11/16/2026

DATE NOTICE Oct. 22, 2026 Request for proposals (PDF, 356KB) 2027 Social services

St. Louis Park city

Bid Due: 11/16/2026

Follow FMC Rochester- Install Above Ground Tanks Active Contract Opportunity Notice ID 15B41227Q00000001

JUSTICE, DEPARTMENT OF

Bid Due: 11/19/2026

division number title/general description issue date due date type Transit 26P031 NEW Green

Metropolitan Council

Bid Due: 11/24/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.