Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations

Location: Florida
Posted: Jul 29, 2026
Due: Aug 27, 2026
Agency: Volusia County
Type of Government: State & Local
Category:
  • 99 - Miscellaneous
  • S - Utilities and Training Services
Solicitation No: 26-B-109JD
Publication URL: To access bid details, please log in.


Project ID: 26-B-109JD

Title: Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations

Addenda: 0

Release Date: 7/24/2026

Due Date: 8/27/2026

Follow
Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations
Invitation For Bid
Engineering & Construction
91200 , 91219 , 91300 , 91356 , 91389
Project ID: 26-B-109JD
Release Date: Friday, July 24, 2026
· Due Date: Thursday, August 27, 2026 3:01pm
Posted Friday, July 24, 2026 4:03pm
All dates & times in Eastern Time
Draft Response No Bid28 days, 17 hours, 44 minutes


Post Information

Posted At:Fri, Jul 24, 2026 4:03 PM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

Veterans Memorial Parkway Extension - Clearing & Grubbing for Advance Utility Removal/Relocations

The purpose of this project is for the clearing and grubbing of the existing and proposed right-of-way for the Volusia County Veterans Memorial Parkway Extension (VMP) project followed by advanced utility removal/relocations work. Not all areas within the project limits require clearing and grubbing as a part of this construction contract.

The Clearing and Grubbing part of this contract contains instructions for the following activities occurring in the VMP Extension project:

  1. The clearing and grubbing of all areas within the new right-of-way of VMP, as well as within the temporary construction easements (TCE) adjacent to the new right-of-way with the exception of areas that are not depicted as such in the plans.
  2. The clearing and grubbing of all areas within the new right-of-way of Kentucky Avenue as well as the TCE adjacent to the new right-of-way with the exception of areas that are not depicted as such in the plans.
  3. The clearing and grubbing of a portion of east side of existing Kentucky Avenue where the new roadway will tie in.
  4. The clearing and grubbing of Pond Parcel #100 from the limits of the new VMP/Kentucky Avenue right-of-way to the existing tree line on the west side of existing Kentucky Avenue.
  5. The clearing and grubbing of the western roadside of existing Kentucky Avenue to the western limits of the existing or proposed VMP/Kentucky Avenue right-of-way, whichever is further west, with the exception of the area that is not depicted as such in the plans.
  6. The clearing and grubbing of the eastern roadside of existing Kentucky Avenue only where depicted as such in the plans.
  7. The Contractor is to follow standard clearing and grubbing Best Management Practices (BMP) at all times, as dictated in the State of Florida Erosion and Sediment Control Design and Reviewer Manual.
  8. The Contractor shall abide by all the terms, conditions, requirements and limitations set forth in all permits. A Gopher Tortoise Survey shall be conducted by an Authorized Gopher Tortoise Agent within 90 days prior to start of construction work. A Gopher Tortoise Relocation Permit with FWC may be required depending upon the number of burrows located. The Contractor shall be responsible for all costs associated with the survey, excavation and relocation of gopher tortoises to an Authorized Gopher Tortoise Recipient Site.

The Utility Removal/Relocations part of this contract will involve advance removal and/or relocation of existing underground or above ground utilities within the existing and proposed right-of-way for the successful future construction of Volusia County’s Veterans Memorial Parkway Extension (VMP) project. The VMP Extension plans are solely to assist the Contractor in assessing the nature and extent of the existing conditions and convey the intent of the construction plans. The Contractor is responsible for any and all utility protection, preservation of service, utility adjustments, and coordination of all relocations required for the successful future construction of the VMP Extension project, including utilities which may not be shown on the VMP Extension plans. There will be no additional cost to the County for any impacts to the Contractor’s work activities or work schedules as a result of utility protection, preservation, adjustments, or removals.

The Contractor is responsible to investigate the existing site conditions including all surface and subsurface conditions, existing features and infrastructures, all available reports and records the work required, and all other conditions that may affect the successful completion of the Clearing and Grubbing and Advance Utility Removals/Relocations work prior to submitting a construction bid and again prior to commencement of these construction activities.



Background

The purpose of this project is for the clearing and grubbing of the existing and proposed right-of-way for the Volusia County Veterans Memorial Parkway Extension (VMP) project followed by advanced utility removal/relocations work. Not all areas within the project limits require clearing and grubbing as a part of this construction project and subsequent contract.



Timeline

Advertisement/Release Project Date:
July 24, 2026
Question Submission Deadline:
August 13, 2026, 11:59pm
Bid Opening:
August 27, 2026, 3:01pm
Microsoft Teams meeting
Join on your computer, mobile app or room device
https://www.microsoft.com/en-us/microsoft-teams/join-a-meeting
Meeting ID: 213 233 692 064
Passcode: gPYNoU
Or call in (audio only)
+1 386-456-3387,,628672925# United States, Daytona Beach
Phone Conference ID: 628 672 925#
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...The Department of Juvenile Justice is requesting RFSQ/RFQ for Continuing Construction Management... Codes ...

State Government of Florida

Bid Due: 10/06/2026

...Ryan Title CONSTRUCTION MANAGEMENT AT RISK MANATEE ELEMENTARY CAMPUS WIDE HVAC RENOVATION, SDMC ...

Manatee County School District

Bid Due: 10/01/2026

...to provide Construction Management services for the North Cape Government Complex - Fleet ...

Florida Department of State

Bid Due: 9/10/2026

...Description: PROFESSIONAL EMERGENCY MANAGEMENT CONSULTING SERVICES Department: Facilities Dev &... for Prequalifications (RPQ) ...

Palm Beach County

Bid Due: 3/30/2029

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.