| Location: | Utah |
|---|---|
| Posted: | Jul 29, 2026 |
| Due: | Aug 24, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | PROVO20250503 |
| Publication URL: | To access bid details, please log in. |
Project Description: Issuing Procurement Unit: Provo City
Conducting Procurement Unit: Parks and Recreation
Schedules 1 to 3: Demolishing the existing asphalt trail and placing approximately 4250 feet of new 14 foot wide asphalt trail, construct 2 pedestrian concrete u-shaped undercrossing under Columbia and State Streets, several new retaining walls along both sides of the trail, and one new pedestrian bridge.
Schedule 4: Replacing approximately 615 linear feet of 24-inch sewer line and 300 linear feet of 16-inch water line that both cross the Provo River using open cut excavation methods. (Only prequalified contractors are eligible to perform the Schedule 4 Work, either as the general contractor or as a subcontractor to the general contractor. Prequalified contractors to perform the Schedule 4 Work are listed in Section 00 43 36 Proposed Subcontractor Form, paragraph 2.1.A.)
Non-Mandatory Site Visit: August 11, 2026 at 9 am to 10:30 starting at 702 W Columbia Ln, Provo, UT 84604
It is anticipated that this IFB will result in a single contract award to the lowest cost responsive qualified vendor.
The methodology or formula that will be used to determine the contract award is provided in the RFB document.

With GovernmentContracts, you can: