Cameron Park Zoo Improvements - Phase 1 Island Repairs

Location: Texas
Posted: Feb 18, 2025
Due: Mar 19, 2025
Agency: City of Waco
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Solicitation No: RFB 2025-013
Publication URL: To access bid details, please log in.
Project: Cameron Park Zoo Improvements - Phase 1 Island Repairs
Ref. #: RFB 2025-013
Department: Cameron Park Zoo
Type: RFB
Status:
Open
Open Date: Feb 18th 2025, 8:00 AM CST
Questions Due Date: Mar 11th 2025, 5:00 PM CDT
Contact Information: Christopher Hanchard, christopherh@wacotx.gov
Close Date: Mar 19th 2025, 2:00 PM CDT

Project Description: The City of Waco is seeking vendors for the Gibbon and Lemur Island erosion repair project at the Cameron Park Zoo. This involves grading, installation of gabion mattresses, and placement of grouted riprap to stabilize slopes and prevent future erosion. The project includes reshaping and grading the existing areas around both islands to create a stable foundation for the erosion control measures. Gabion mattresses will be installed on designated slopes with filter fabric underneath to prevent soil migration and ensure long-term stability. The mattresses will be constructed with stone-filled wire mesh baskets, properly anchored and aligned to withstand varying water levels while blending into the natural environment. Grouted riprap will be placed in areas requiring additional protection due to steeper slopes or high hydraulic forces, with detailed joint work to prevent water infiltration and erosion.
The contractor will implement erosion control measures throughout the construction process to protect the surrounding pond ecosystem and wildlife. This includes temporary silt fencing and sediment barriers to minimize runoff. Construction is expected to be completed within 90 calendar days from the notice to proceed. All work must comply with the specified grading, materials, and installation requirements, with regular inspections to ensure adherence to the project’s standards and environmental regulations. Gabion mattresses and riprap will be integrated seamlessly into the landscape to restore the islands and enhance long-term stability while preserving the zoo pond’s aesthetic and functional aspects.
(1) 30% Self Performance required by Contractor (2) Liquidated Daily Damages: $950.00


Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...specifications in compliance with all federal, state and local ordinances; force protection standards...

DEPT OF DEFENSE

Bid Due: 7/01/2026

...federal, state, and local ordinances; force protection standards, in compliance with Department...

DEPT OF DEFENSE

Bid Due: 6/12/2026

...specifications: in compliance with all federal, state, and local ordinances; force protection standards...

DEPT OF DEFENSE

Bid Due: 7/01/2026

...equal enforcement and protection of the law without prejudice or favor. CCSO promotes ...

Collin County

Bid Due: 6/25/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.