| Location: | California |
|---|---|
| Posted: | Jul 3, 2026 |
| Due: | Jul 23, 2026 |
| Agency: | County of San Mateo |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
ATTENTION:
COUNTY RECOMMENDS THE CONTRACTORS TO BE PLACED ON A PLAN HOLDERS LIST FOR BIDDING.
To obtain the technical Specifications and the plans:
Please review the Notice to Contractors document below and follow the instructions found under paragraph (1) a. All Contractors are required to register with the OpenGov website for accessing the project’s electronic documents. Once you have registered with OpenGov, the bidding document will be accessible through: https://procurement.opengov.com/portal/smcgov/projects/267320
Project’s OpenGov Reference:
Entrada Way Culvert Slip-Out Bank Stabilization Project (Project ID: E5103)
Bid Opening has been scheduled for Thursday, July 23, 2026 at 2:00 P.M.
RFI Deadline has been scheduled for Friday, July 16, 2026 at 5:00 P.M.
COUNTY PROJECT NO. 13311; PROJECT FILE NO. E5103
NC. E5103
COUNTY OF SAN MATEO
STATE OF CALIFORNIA
NOTICE TO CONTRACTORS
NOTICE IS HEREBY GIVEN, that
Sealed bids will be received either by mail to the office of the County Executive's
Office, or hand-delivered prior to the bid opening to the County of San Mateo at 500
County Center, 5th Floor, Redwood City, California, 94063 until the hour of
2:00 p.m., Thursday, July 23, 2026
where the bids will be publicly opened and read aloud for the following project in
accordance with the specifications therefore and to which special reference is made as
follows:
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
TOTAL PROJECT APPROXIMATELY 600 FEET IN LENGTH
WITH APPURTENANT WORK THERETO
IN SAN MATEO COUNTY
COUNTY PROJECT NO. 13311
PROJECT FILE NO. E5103
FEDERAL-AID PROJECT NO. FEMA-4683-DR-CA
CAL OES NO. 081-00000
Bids are required for the entire work described herein.
Bidders are advised of the following:
1. Contractor should be placed on a Plan Holders List for bidding. To be
placed on the Plan Holders List, the Contractor shall either:
a. Bidder shall register and create an account on the OpenGov website
to download all bidding documents, including forms of proposal and
contract, directly from
https://procurement.opengov.com/portal/smcgov/projects/267320
Project's OpenGov Reference:
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
Project ID: E5103
1
| Plan Holder's Affidavit |
|---|
| ENTRADA WAY CULVERT SLIP-OUT BANK Project Title STABILIZATION PROJECT Project Project No. 13311 Engineer: Michael Clement Project Manager: Wency Ng Bid Open Date and Time: 2:00 p.m., Thursday, July 23, 2026 Company Name: Mailing Address: Fax Phone Number: Number: E-mail Address: |
| (Name and Title of Authorized Representative of Bidder) |
| (Signature of Authorized Representative of Bidder) |
NC. E5103
b. If bidding documents are obtained through a source other than those
outlined in 1a above, complete and sign the following Plan Holder's
Affidavit and return to the County by PDF either via email to
mclement@smcgov.org, and wng@smcgov.org or by fax at (650)
361-8220. The Contractor is advised that the table should be
received by the County no later than three (3) working days prior to
the bid opening date.
Plan Holder's Affidavit
ENTRADA WAY CULVERT SLIP-OUT BANK
Project Title STABILIZATION PROJECT
Project
Project No. 13311 Engineer: Michael Clement
Project
Manager: Wency Ng
Bid Open Date and
Time: 2:00 p.m., Thursday, July 23, 2026
Company
Name:
Mailing
Address:
Fax
Phone Number: Number:
E-mail
Address:
(Name and Title of Authorized Representative of Bidder)
(Signature of Authorized Representative of Bidder)
2. The Plan Holders List will be posted to the County of San Mateo's Public
Works website two (2) working days prior to the bid open date.
3. Questions regarding the Contract Documents concerning items such as
discrepancies, conflicts, omissions, doubts as to meanings, or regarding
scope of bid items shall be referred to the Engineer. Inquiries must be
received in writing via email, to mclement@smcgov.org and
2
NC. E5103
wng@smcgov.org, by 5 PM on July 16, 2026. Inquiries will be answered in
writing via email response if written clarification is warranted, in the
opinion of the Engineer, then inquiries and responses will be posted to the
Project's page on the County of San Mateo's Public Works website. It will
be the Contractor's sole responsibility to ensure that they receive
responses, if any. The County will not be responsible for oral clarifications.
4. It will be the Contractor's sole responsibility to ensure that they have
received addendums, if any, which will be posted to the County of San
Mateo's Public Works website on the same day issued. Said addendums
will also be sent to all current plan holders and made available during
purchase of Plans and Specifications.
5. Proposals in which the prices obviously are unbalanced may be rejected.
6. The Contractor's attention is directed to the importance of complying with
the provisions of Section 7-0.10, "Federal Forms, Posters and Data
Required of Contractor During Construction," and Appendix G, "Pre-
Construction Handout Packet for Federal-Aid Contracts," of these Special
Provisions.
7. Bids which are not received in a sealed envelope by bid opening will be
rejected. This includes all envelopes which are secured by metal clasp,
twist tie, string or those which do not otherwise preclude unauthorized
access. Bidders who deliver their bids in an envelope which is not sealed
may be allowed to correct this deficiency provided they do so before
time/date specified for opening of bids.
The Department of Public Works website will be updated as needed and can be
accessed under the Department's tab found on the County of San Mateo website
(http://publicworks.smcgov.org/publicworks).
3
| Item No. | Section No. | Estimated Quantity | Unit of Measure | Item Description |
|---|---|---|---|---|
| GENERAL CONSTRUCTION | ||||
| 1 | 10 | 1 | LS | Develop and Apply Water |
| 2 | 11 | 1 | LS | Mobilization |
| 3 | 12 | 1 | LS | Maintaining Traffic |
| 4 | 13 | 1 | LS | Water Pollution Control Plan |
| 5 | 13 | 1 | LS | Water Pollution Control |
| 6 | 13-12 | 1 | LS | Temporary Creek Diversion Systems |
| 7 | 14 | 1 | LS | Construction Waste Management |
| 8 | 14-11 | 1 | LS | Treated Wood Waste |
| 9 | 15-1 | 1 | LS | Remove Drainage Facilities |
| 10 | 15-2 | 2 | EA | Adjust Water Valve Box to Grade |
| 11 | 15-3 | 5 | EA | Pothole and Protect Existing Utilities |
NC. E5103
ENGINEER'S ESTIMATE
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
TOTAL PROJECT APPROXIMATELY 600 FEET IN LENGTH
WITH APPURTENANT WORK THERETO
IN SAN MATEO COUNTY
COUNTY PROJECT NO. 13311
PROJECT FILE NO. E5103
FEDERAL-AID PROJECT NO. FEMA-4683-DR-CA
CAL OES NO. 081-00000
Item Section Estimated Unit of Item
No. No. Quantity Measure Description
GENERAL CONSTRUCTION
1 10 1 LS Develop and Apply Water
2 11 1 LS Mobilization
3 12 1 LS Maintaining Traffic
4 13 1 LS Water Pollution Control Plan
5 13 1 LS Water Pollution Control
6 13-12 1 LS Temporary Creek Diversion Systems
7 14 1 LS Construction Waste Management
8 14-11 1 LS Treated Wood Waste
9 15-1 1 LS Remove Drainage Facilities
10 15-2 2 EA Adjust Water Valve Box to Grade
11 15-3 5 EA Pothole and Protect Existing Utilities
4
| Item No. | Section No. | Estimated Quantity | Unit of Measure | Item Description |
|---|---|---|---|---|
| EARTHWORK AND LANDSCAPE | ||||
| 12 | 17-1 | 1 | LS | Clearing and Grubbing |
| 13 | 17-1 | 1 | LS | Tree Removal |
| 14 | 17-1 | 10 | EA | Additional Tree Removal |
| 15 | 19-1.01 | 81 | CY | Roadway Excavation |
| 16 | 19-1.02 | 2.3 | CY | Roadway Backfill |
| 17 | 19-2 | 1 | LS | Pipe Outfall Construction |
| 18 | 19-2 | 381 | CY | Channel Excavation |
| 19 | 19-2 | 183 | TON | Streambed Sediment |
| 20 | 19-3 | 40 | CY | Imported Topsoil |
| 21 | 19-3 | 1,404 | CY | Structure Excavation (ELS) |
| 22 | 19-3 | 122 | CY | Structure Excavation (Soldier Pile Wall) |
| 23 | 19-3 | 102 | CY | Structure Backfill (Soldier Pile Wall) |
| 24 | 19-3 | 15 | CY | Concrete Backfill (Soldier Pile) |
| 25 | 19-3 | 9 | CY | Lean Concrete Backfill (Soldier Pile) |
| 26 | 19-3 | 100 | TON | Import Structure Backfill (ELS) |
| 27 | 19-11 | 480 | SQ.YD. | Vegetated Soil Lifts |
| 28 | 20-3 | 0.3 | AC | Planting |
| 29 | 20-4 | 1 | LS | Weed and Pest Control |
NC. E5103
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
Engineer's Estimate - Continued from Previous Page
Item Section Estimated Unit of Item
No. No. Quantity Measure Description
EARTHWORK AND LANDSCAPE
12 17-1 1 LS Clearing and Grubbing
13 17-1 1 LS Tree Removal
14 17-1 10 EA Additional Tree Removal
15 19-1.01 81 CY Roadway Excavation
16 19-1.02 2.3 CY Roadway Backfill
17 19-2 1 LS Pipe Outfall Construction
18 19-2 381 CY Channel Excavation
19 19-2 183 TON Streambed Sediment
20 19-3 40 CY Imported Topsoil
21 19-3 1,404 CY Structure Excavation (ELS)
22 19-3 122 CY Structure Excavation (Soldier Pile Wall)
23 19-3 102 CY Structure Backfill (Soldier Pile Wall)
24 19-3 15 CY Concrete Backfill (Soldier Pile)
25 19-3 9 CY Lean Concrete Backfill (Soldier Pile)
26 19-3 100 TON Import Structure Backfill (ELS)
27 19-11 480 SQ.YD. Vegetated Soil Lifts
28 20-3 0.3 AC Planting
29 20-4 1 LS Weed and Pest Control
5
| Item No. | Section No. | Estimated Quantity | Unit of Measure | Item Description |
|---|---|---|---|---|
| EARTHWORK AND LANDSCAPE | ||||
| 30 | 20-5 | 100 | CY | Wood Mulch |
| 31 | 21 | 700 | LF | Wildlife Exclusion Fence |
| 32 | 21 | 800 | LF | High Visibility Silt Fence (with Wildlife Exclusion) |
| 33 | 21 | 1 | LS | Hydroseed |
| SUBBASES AND BASES | ||||
| 34 | 26 | 59 | TON | Aggregate Base (Class 2) |
| SURFACINGS AND PAVEMENTS | ||||
| 35 | 39-1 | 36 | TON | Asphalt Concrete (Type A HMA) |
| 36 | 39-5 | 30 | LF | Place Asphalt Concrete Dike |
| STRUCTURES | ||||
| 37 | 46 | 4 | EA | Ground Anchor (Subhorizontal) |
| 38 | 49-4 | 193 | LF | Steel Soldier Piling (W12x72) |
| 39 | 49-4 | 194 | LF | 24" Drilled Hole |
| 40 | 49-7 | 48 | LF | Drilled Hole and Drive Timber Pile (ELS) |
| 41 | 49-7 | 16 | LF | Additional Drilling and Driving Timber Pile (ELS) |
| 42 | 51-1 | 1 | EA | Type GO Inlet |
| 43 | 51-1 | 1 | EA | 3'x2' Drop Inlet |
NC. E5103
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
Engineer's Estimate - Continued from Previous Page
Item Section Estimated Unit of Item
No. No. Quantity Measure Description
EARTHWORK AND LANDSCAPE
30 20-5 100 CY Wood Mulch
31 21 700 LF Wildlife Exclusion Fence
High Visibility Silt Fence (with Wildlife
32 21 800 LF
Exclusion)
33 21 1 LS Hydroseed
SUBBASES AND BASES
34 26 59 TON Aggregate Base (Class 2)
SURFACINGS AND PAVEMENTS
35 39-1 36 TON Asphalt Concrete (Type A HMA)
36 39-5 30 LF Place Asphalt Concrete Dike
STRUCTURES
37 46 4 EA Ground Anchor (Subhorizontal)
38 49-4 193 LF Steel Soldier Piling (W12x72)
39 49-4 194 LF 24" Drilled Hole
40 49-7 48 LF Drilled Hole and Drive Timber Pile (ELS)
41 49-7 16 LF Additional Drilling and Driving Timber Pile
(ELS)
42 51-1 1 EA Type GO Inlet
43 51-1 1 EA 3'x2' Drop Inlet
6
| Item No. | Section No. | Estimated Quantity | Unit of Measure | Item Description |
|---|---|---|---|---|
| 44 | 51-1 | 1 | EA | 3'x4' Drain Inlet |
| 45 | 51-2 | 2.0 | CY | Class 3 Concrete |
| 46 | 53 (F) | 19 | CY | Structural Shotcrete (Retaining Wall- Shotcrete Facing) |
| 47 | 57 (F) | 2 | MFBM | Timber Lagging |
| 48 | 57 | 1 | EA | Engineered Log Structure (ELS) - Type A |
| 49 | 57 | 1 | EA | Engineered Log Structure (ELS) - Type B |
| 50 | 57 | 1 | EA | Engineered Log Structure (ELS) - Type C |
| Drainage Facilities | ||||
| 51 | 64 | 17 | LF | 12" SDR 17 HDPE Storm Drain Pipe (within roadway) |
| 52 | 64 | 38 | LF | 24" SDR 9 HPDE Storm Drain Pipe (within roadway) |
| 53 | 64 | 22 | LF | 24" SDR 9 HPDE Storm Drain Pipe (outside roadway) |
| Miscellaneous Construction | ||||
| 54 | 72 | 6 | CY | Road Embankment RSP |
| 55 | 72-2 | 255 | TON | Scour Protection Rock |
| Traffic Control Devices | ||||
| 56 | 83 | 122 | LF | Metal Beam Guard Railing |
| 57 | 83-2 (F) | 80 | LF | Cable Railing |
NC. E5103
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
Engineer's Estimate - Continued from Previous Page
Item Section Estimated Unit of Item
No. No. Quantity Measure Description
44 51-1 1 EA 3'x4' Drain Inlet
45 51-2 2.0 CY Class 3 Concrete
Structural Shotcrete (Retaining Wall-
46 53 (F) 19 CY
Shotcrete Facing)
47 57 (F) 2 MFBM Timber Lagging
48 57 1 EA Engineered Log Structure (ELS) - Type A
49 57 1 EA Engineered Log Structure (ELS) - Type B
50 57 1 EA Engineered Log Structure (ELS) - Type C
Drainage Facilities
12" SDR 17 HDPE Storm Drain Pipe
51 64 17 LF
(within roadway)
24" SDR 9 HPDE Storm Drain Pipe (within
52 64 38 LF
roadway)
24" SDR 9 HPDE Storm Drain Pipe
53 64 22 LF
(outside roadway)
Miscellaneous Construction
54 72 6 CY Road Embankment RSP
55 72-2 255 TON Scour Protection Rock
Traffic Control Devices
56 83 122 LF Metal Beam Guard Railing
57 83-2 (F) 80 LF Cable Railing
7
| Item No. | Section No. | Estimated Quantity | Unit of Measure | Item Description |
|---|---|---|---|---|
| Materials | ||||
| 58 | 86 | 1.5 | CY | Road Embankment Gravel Filter Aggregate |
| 59 | 98 | 8 | EA | Timber Piling |
| 60 | 98 | 16 | EA | Type R Key Logs |
| 61 | 98 | 17 | EA | Type L Key Logs |
| 62 | 98 | 36 | EA | Racking Logs |
| 63 | 98 | 1 | LS | Slash Material |
| County Miscellaneous | ||||
| 64 | 100 | 1 | LS | Construction Staking and Survey |
| 65 | 110 | 1 | EA | Connector Pipe Screen |
NC. E5103
ENTRADA WAY CULVERT SLIP-OUT BANK STABILIZATION PROJECT
Engineer's Estimate - Continued from Previous Page
Item Section Estimated Unit of Item
No. No. Quantity Measure Description
Materials
58 86 1.5 CY Road Embankment Gravel Filter Aggregate
59 98 8 EA Timber Piling
60 98 16 EA Type R Key Logs
61 98 17 EA Type L Key Logs
62 98 36 EA Racking Logs
63 98 1 LS Slash Material
County Miscellaneous
64 100 1 LS Construction Staking and Survey
65 110 1 EA Connector Pipe Screen
Engineer's Estimate of Costs: $ 2,249,400
(F) Final Pay Quantities - See Section 9-1.02C, "Final Pay Item Quantities," of the
Standard Specifications.
(Note: Gaps in section numbering, above, indicate the Section is blank or does not
apply.)
The foregoing quantities are approximate only, being given as a basis for the
comparison of bids, and the County of San Mateo does not, expressly or by implication,
agree that the actual amount of work will correspond herewith, but reserves the right to
increase or decrease the amount of any class or portion of the work, or to omit any
portion of the work, as may be deemed necessary or expedient by the Engineer.
Payment to the Contractor for materials furnished and work completed shall be
8
NC. E5103
made by the County in accordance with Section 9 of the "Special Provisions" portion of
these Contract Documents. Pursuant to Section 22300 of the Public Contract Code,
Contractor may, upon his request and at Contractor's expense, substitute equivalent
securities for any moneys retained from such payment for the fulfillment of the Contract.
Pursuant to Section 1773 of the California Labor Code, prevailing wage
rates in the County have been established by the California Department of
Industrial Relations, and copies are available in the office of the Director of Public
Works. Said prevailing wage rates shall be made available to any interested party
on request, and the successful Bidder shall post a copy of the wage rates at the
job site. The Contractor's attention is directed to Section 7-1.02K(2), "Wages," of
the Standard Specifications and the Federal Requirements section of these
Special Provisions. More specifically, reference is made to section FR-2, "Federal
Wage Rates (North County)".
Additionally:
a. When applicable, both Contractor and Subcontractor hereby agree to
pay not less than prevailing rates of wages and be responsible for
compliance with all the provisions of the California Labor Code, Article 2-
Wages, Chapter 1, Part 7, Division 2, Section 1770 et seq and Section 1810
et seq. A copy of the prevailing wage scale established by the Department
of Industrial Relations is on file in the office of the Director of Public Works,
and available at www.dir.ca.gov/DLSR or by phone at 415-703-4774.
California Labor Code Section 1776(a) requires each contractor and
subcontractor keep accurate payroll records of trades workers on all public
works projects and to submit copies of certified payroll records upon
request.
b. Pursuant to State Senate Bill SB 854 (Stat. 2014, chapter 28),
effective January 1, 2015:
i. No contractor or subcontractor may be listed on a bid proposal for a
public works project unless registered with the Department of
Industrial Relations pursuant to Labor Code section 1725.5 [with
limited exceptions from this requirement for bid purposes only under
Labor Code section 1771.1(a)].
9
NC. E5103
ii. No contractor or subcontractor may be awarded a contract for public
work on a public works project unless registered with the
Department of Industrial Relations pursuant to Labor Code section
1725.5.
iii. This project is subject to compliance monitoring and enforcement by
the Department of Industrial Relations.
Attention is directed to the Federal minimum wage rate requirements in the
Contract documents for this Project. If there is a difference between the minimum wage
rates predetermined by the Secretary of Labor and the general prevailing wage rates
determined by the Director of the California Department of Industrial Relations for
similar classifications of labor, the Contractor and subcontractors shall pay not less than
the higher wage rate. The Department will not accept lower State wage rates not
specifically included in the Federal minimum wage determinations. This includes
"helper" (or other classifications based on hours of experience) or any other
classification not appearing in the Federal wage determinations. Where Federal wage
determinations do not contain the State wage rate determination otherwise available for
use by the Contractor and subcontractors, the Contractor and subcontractors shall pay
not less than the Federal minimum wage rate, which most closely approximates the
duties of the employees in question.
Anyone with knowledge of possible bid rigging, bidder collusion, or other
fraudulent activities should use the hotline provided below to report these activities.
Reference is made to Section 2-1.50, Bid Rigging," of the Standard Specifications,
which states: "The U.S. Department of Transportation (DOT) provides a toll-free hotline
service to report bid rigging activities. Use the hotline to report bid rigging, bidder
collusion, or other fraudulent activities. The hotline number is (800)-424-9071. The
service is available 24 hours 7 days a week and is confidential and anonymous. The
hotline is part of the DOT's effort to identify and investigate highway construction
contract fraud and abuse and is operated under the direction of the DOT Inspector
General."
Wage rates for overtime shall be paid at not less than one and one-half (1-1/2)
times the above rates. Wage rates for Sundays and holidays shall be paid at not less
than two (2) times the above rates.
The holidays upon which such rates shall be paid shall be all holidays recognized
10

With GovernmentContracts, you can:
Monrovia Library Story Room Expansion Department: Public Works RFP Number: A-1002 Start Date:
City of Monrovia
Bid Due: 8/19/2026
RFB 25-26-30 Annual Contract for Custom Branding Services for Recreation Division Apparel and
City of Visalia
Bid Due: 9/03/2026
0820 - 0820 ON-CALL ELEC. SERVS. FOR EV/PV INSTALLS, AND INSIDE WIREMAN WORK
City of Los Angeles
Bid Due: 8/11/2026
RFx Name: BPM013316 RFx Begin Date (UTC+0): RFQ - AS-NEEDED MEDICAL WASTE REMOVAL
County of San Diego
Bid Due: 8/07/2026