| Location: | South Carolina |
|---|---|
| Posted: | Dec 31, 2024 |
| Due: | Feb 4, 2025 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SCIIP #A-23-C211 |
| Publication URL: | To access bid details, please log in. |
Elko Street Well replacement of vertical turbine motor, well pump eval,variable frequency drive and control panel,chemical system upgrades,generator,building rehabilitation,conditioning electrical room,fascia and vented soffit carpentry,and appurt.State Street Well replacement of vertical turbine motor,well eval,water testing,variable frequency drive and control panel,conditioning well house,control valves,meter,filtration system,canopy,concrete,piping,site grading,generator,and appurt.

With GovernmentContracts, you can:
...Project Name: Roadway, Water, and Wastewater Improvements to Chase Street Agency/Owner: Orangeburg...@orangeburgcounty.org Telephone: ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/03/2026
...Project Name: Hidden Valley, Essex Drive, and Springdale Drive Wastewater Improvements Agency... of ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/08/2026
...of various inventory materials utilized by CWS in support of its water and ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/08/2026
...will consist of the refurbishment of two (2) wastewater pumping stations. The work ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 12/15/2026