| Location: | Texas |
|---|---|
| Posted: | Aug 11, 2025 |
| Due: | Nov 12, 2025 |
| Agency: | State Government of Texas |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFB2025-059 |
| Publication URL: | To access bid details, please log in. |
RFB2025-059
Posted
Melanie Wade
(254) 750-8098
melaniew@wacotx.gov
11/12/2025
2:00 PM
M1612
21+ Days for Solicitation Notice
8/11/2025
8/11/2025 2:07 am
91356-Construction, Utility/Underground Projects;
91359-Construction And Upgrades, Wastewater Treatment Plant;
91360-Construction, Water System/Plants, Main And Service Line;
91389-Maintenance And Repair, Utility/Underground Projects;
91391-Maintenance And Repair, Wastewater Treatment Plant;
91392-Maintenance And Repair, Water System, Main And Service Line;
The project generally consists of the expansion of the existing Bull Hide Wastewater Treatment Facility to 4.0 mgd ADF and 16.0 mgd P2HF, including construction of a new Influent Pump Station, Headworks to screen and degrit, Flow Distribution Structure, Process Trains C and D, Mixed Liquor Splitter Box, Secondary Clarifiers C and D, Disk Filter, UV Disinfection Equipment (replace existing outdated equipment), Solids Storage and Thickening Facilities, Odor Control Systems, Alum Feed Facility, Electrical and Blower Buildings/Enclosures, and site civil piping, grading and drainage improvements.

With GovernmentContracts, you can:
...in the plans must be followed. All existing conditions, including the presence of ...
Granbury city
Bid Due: 6/10/2026