| Location: | Connecticut |
|---|---|
| Posted: | Apr 8, 2025 |
| Due: | May 6, 2025 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 901803-3B 2024-RFQ |
| Publication URL: | To access bid details, please log in. |
The project is anticipated to take place from May 2025 through November 2027. Total estimated value of the project is approximately $109 Million. The adjacent wings of the Gant Building Facility will be occupied during the Construction of each phase. This Phase 3 package is intended to renovate roughly 92,000 SF of existing space and will perform an addition of a new 4th Floor 12,000 SF construction structure/space to the Building. Phase 3A was the package to perform demolition/abatement, establishing logistical setups, procurement of select electrical gear, and sitework. Phase 3B is the package for all other construction. This Project will be utilizing an established Project Labor Agreement (PLA). Please copy and paste the following link into a web browser to access the project through Building Connected for prequalification: https://app.buildingconnected.com/projects/679cfc1ebfa335004aea1b5c/files
Kevin Seidensticker 285 Nicoll Street, Suite 201, New Haven CT, 06511 United States Tel: 203-668-0211 kevin.seidensticker@whiting-turner.com

With GovernmentContracts, you can:
...Rental of Services and Equipment for Roadway Construction This Contract is for the ...
State Government of Connecticut
Bid Due: 8/18/2026
...Invitation to Bid for Construction Services 450 Columbus Blvd. Building/Agency Space Consolidation... Information ...
State Government of Connecticut
Bid Due: 9/02/2026
...Invitation to Bid for Construction Services DESPP Fleet Roof Replacement 47 Mill Hill ...
State Government of Connecticut
Bid Due: 8/24/2026
...Location 207536 caeab9a1-c1a3-4f22-8516-d54e4115374a 2027.0032 City Bid - Construction of Food..., Construction Manager, (203)-977-4179 ...
City of Stamford
Bid Due: 8/20/2026