| Location: | Colorado |
|---|---|
| Posted: | Aug 12, 2025 |
| Due: | Sep 3, 2025 |
| Agency: | City of pueblo |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-084 (HUAN01) |
| Publication URL: | To access bid details, please log in. |
Project ID: 25-084 (HUAN01)
Title: Concrete Improvements - 3500 Block Dillon Drive
Addenda: 0
Release Date: 8/12/2025
Due Date: 9/3/2025
In general this project will consist of the removal and replacement of concrete sidewalk, curb ramps, curb and gutter, crosspans, and asphalt patching along the 3500 block of Dillon Drive, in the City of Pueblo, Colorado.

With GovernmentContracts, you can:
...National Grassland including crack sealing, pavement patching, seal coating and re-striping. NAICS...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/23/2026
...patching, seal coating and re-striping. NAICS code 237310 - Highway, Street, and bridge...
AGRICULTURE, DEPARTMENT OF
Bid Due: 11/23/2026
...by 2 railing. Repair damaged concrete stair walls, including patching and restoration as ...
City of Trinidad
Bid Due: 11/13/2026