| Location: | South Carolina |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | May 7, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
The proposed project includes the rehabilitation and maintenance of sewer collection system including installation of 7,594 linear feet of cured-in-place pipe liner, 2,971 linear feet of sewer pipe bursting from 6-inch pipe to 8-inch pipe diameter, sewer service reconnection, point repairs, rehabilitation of 49 manholes, and all incidental work and related restoration.

With GovernmentContracts, you can:
...Bid Document: Sewer Collection Right-of-Way Maintenance (RFP) Bids accepted until: 09/01/2026 Pre...-Bid Meeting: ...
Spartanburg Water
Bid Due: 9/01/2026
...Bid Number: 27-04 Bid Title: Services for Sanitary Sewer System Hydraulic Modeling and ...
City of Lexington
Bid Due: 10/20/2026
...Bid Number: 27-04 Bid Title: Services for Sanitary Sewer System Hydraulic Modeling and ...
Town of Lexington
Bid Due: 10/20/2026