| Location: | South Carolina |
|---|---|
| Posted: | Mar 25, 2026 |
| Due: | May 5, 2026 |
| Agency: | State of South Carolina - State Fiscal Accountability Authority(SFAA) |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Construction of a new 7.5 million-gallon (MG) prestressed concrete finished water storage reservoir. The reservoir shall include a reservoir manufacturer designed AWWA D110 Type II prestressed concrete water tank; 30-inch ductile iron influent and effluent piping; 10-inch ductile iron drain piping; 24-inch ductile iron overflow structure and piping; foundation drain system; reservoir effluent flow meter vault; coatings; electrical; I&C; sitework; and reservoir accessories.

With GovernmentContracts, you can:
...sidewalks, concrete monument foundation, picnic tables, benches, trash receptacles and other...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/11/2026
...dated: 6/26/2026. Foundation Type: Concrete Slab. Residence Type: Stick Built (Composite Sided) Work...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026
...Jahnke Email: mjahnke@scetv.org Telephone: (803) 737-3486 Description: Steel and Concrete Foundation...: (450 character ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 8/07/2026
...of existing Building M300-R to contain IT Department, HR Department, Security, the Foundation ...
State of South Carolina - State Fiscal Accountability Authority(SFAA)
Bid Due: 7/30/2026