| Location: | Vermont |
|---|---|
| Posted: | Feb 3, 2026 |
| Due: | Mar 6, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Bennington Keywords: Construction (Non Building), Bridge Repair and Construction, Paving Contractor, Road Construction Bid Description: Ninja Path – Phase 2 Stage 2– Bennington STP BP(15) 2 & Bennington TAP TA22(9): CONSTRUCTION OF A SHARED-USE PATHWAY STARTING FROM THE EXISTING NINJA PATHWAY AT THE NORTHWEST CORNER OF HANNAFORD SQUARE AND CONTINUING TO A CONNECTION POINT AT THE EXISTING NINJA PATH AT THE VERMONT 279 OVERPASS. All bidders shall be on the current VTRANS Contract Administration pre-qualified list “Contractors List of Bike and/or Pedestrian Path, Bridge Construction Category” VT Agency of Transportation 2018 Standard Specifications for Construction shall apply to this contract. Owner: Town of Bennington Bennington Town Office 205 South Street Bennington, VT 05201 02/03/2026
|
||||||||||||||||||||

With GovernmentContracts, you can:
...Bridge #9 Structural Repairs Request Date: 5/14/2026 5:48:20 PM Open Date: Closing Date: ...
State Government of Vermont
Bid Due: 6/19/2026
...Keywords: Construction (Non Building), Bridge Repair and Construction, Culvert Replacement, Paving...
State Government of Vermont
Bid Due: 6/29/2026
...TO BE PERFORMED UNDER THIS PROJECT INCLUDES SURFACE PREPARATION INVOLVING PATCHING, POT HOLE ...
State of Vermont - Agency of Transportation
Bid Due: 6/19/2026