| Location: | Ohio |
|---|---|
| Posted: | Nov 5, 2026 |
| Due: | Nov 11, 2026 |
| Agency: | City of Columbus |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | RFQ034030 |
| Publication URL: | To access bid details, please log in. |
| Basic Information | |
| Solicitation # | RFQ034030 |
| Solicitation Type | INF |
| Document Title | 6009 HCWP 2026 HIGH SERVICE #12 PUMP MOTOR REBUILD |
| Expiry Date Time (ET) | 11/11/2026, 1:00:00 PM |
| Delivery Date | 12/4/2026 |
| Delivery Name | City of Columbus, Division of Water |
| Delivery Address |
4250 Morse Road
Columbus, OH 43230 USA |
| Attachment | Yes |
PLEASE SEE ATTACHED DOCUMENT FOR SERVICE SPECIFICATIONS AND DETAILS.
| Bidding Guidance | ||
| Item | Description | Required |
| General liability insurance | General liability insurance | Yes |
| Workers compensation | Workers compensation | Yes |
| RFQ Lines | |||||||
| Line Number | Line Type | Procurement Category | Item Number | Product Name | Quantity | Purch Unit | Currency |
| 1 | Category | Machine installation and maintenance and repair services | IDEAL 1000 HP PUMP MOTOR REBUILD | 1 | EA | USD | |
REBUILD #12 HIGH SERVICE PUMP MOTOR
Motor Data:
IDEAL 1000 HP Pump Motor
4000 Volt, 3Ph, 60 Hz, 889 RPM, Frame V11124, Type: AT
Serial # 267622, Full Load Amps 126
Services Requested:
I. Pick up and transport to repair facility.
Perform the following electrical tests, both As Received and Upon Completion:
D.C. high-pot of the windings. Polarization Index.
Balance check all three phases. Measure winding resistance.
Record data and furnish with returned unit.
Check all terminations on terminal strip and assure each wire is numbered, if not renumber all wires as necessary.
Make sure that numbers are intact on existing terminal strips, repair as needed.
Completely disassemble motor for inspection. Set-up and allow for a one day inspection of internals and the sampling of any contaminants by City of Columbus representatives and hired specialists.
Thoroughly inspect internal parts for overall condition and any signs of contaminants, identify and provide report.
Measure and record the following mechanical items: Shaft journal dimensions and fits.
Bearing housing fits.
Rotor total indicated run-outs.
Thoroughly inspect stator for condition of ties, wedges, coils, leads, bracing system, etc. Check rotor bar continuity.
Thoroughly clean, inspect, and repair all components. Including bearing housings and shaft journals, as needed.
Steam clean windings and bake.
Assure that each motor winding has two functional thermal overload sensors, one for Immediate use and one spare.
Varnish treat windings and bake.
Balance rotor before reassembling.
Reassemble motor, provide and install all new bearings.
Assure bearing temperature probes are functional.
Check final balance after reassembly .5 mil maximum.
Run motor until bearing temperatures are stable.
Paint motor to match existing color.

With GovernmentContracts, you can: