| Location: | Florida |
|---|---|
| Posted: | Jul 28, 2025 |
| Due: | Aug 5, 2025 |
| Agency: | City of St. Petersburg |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
Project ID:
Title: Shore Acres Water Main Replacement – Phase 3 (Project No. 24127-130)
Addenda: 2
Release Date: 7/1/2025
Due Date: 8/5/2025
The City of St. Petersburg is seeking responses from qualified Contractors for the replacement of approximately 1,800 Linear Feet (LF) of 8-inch Water Main (WM) and 430 LF of 2-inch WM. The project also includes the appropriate testing and disinfection of the proposed WM, connection to the existing WMs at each end of the project and to existing services, associated valves, fittings, fire hydrant assemblies and appurtenances required to replace the existing 8” and 2” water mains, surface and roadway restoration, including milling and repaving as shown in the plans. The WM is to be installed using a combination of Horizontal Directional Drilling (HDD) and Open Cut (OC) methods as shown in the plans and specified herein.

With GovernmentContracts, you can:
...Advertisement Detail Department of Transportation Agency Decisions Purchase of a Milling Machine...
State Government of Florida
Bid Due: 10/11/2090
..., sewer line adjustments, milling and resurfacing, signing and pavement markings, demolition, sediment...
City of Tallahassee
Bid Due: 7/09/2026
...* temporary traffic control * lane closures * milling and resurfacing of existing ...
State Government of Florida
Bid Due: 6/19/2026
...Airport (FLL). This rehabilitation will include milling of the existing full-strength pavement...
Broward County
Bid Due: 6/11/2026