| Location: | North Carolina |
|---|---|
| Posted: | Oct 9, 2025 |
| Due: | Oct 14, 2025 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 377-2024-083Rebid |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 377-2024-083Rebid |
| Project Title: | IFB 2024-083Rebid Waxhaw North Sanitary Sewer Replacement & Rehabilitation |
| Description: | The Project consists of constructing approximately 4,000 linear feet total of 10-inch HDPE gravity sewer lines installed via pipe bursting, 8-inch PVC and DIP sewer line installed via traditional open-cut, repairing and replacing manholes, as needed, reconnection of sewer services, and abandonment of the existing small-diameter gravity sewer line in Waxhaw. Most of the sewer lines will replace existing small diameter gravity sewer in their existing alignments, installed via pipe bursting. The project involves both pipe bursting methods and conventional open-cut construction methods. Work also includes traffic control, bypass pumping, erosion control, testing, and surface restoration within the project limits. |
| Opening Date: | 10/14/2025 2:00 PM |
| Posted Date: | 10/9/2025 |
| Status: | Open |
| Department: | COUNTY OF UNION |
|
Solicitation Number
*
377-2024-083Rebid
|
Department
COUNTY OF UNION
|
Status Reason
Open
|
|
|
Opening Date
2025-10-14T14:00:00.0000000
|
Posted Date
*
2025-10-09T13:39:23.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Description
The Project consists of constructing approximately 4,000 linear feet total of 10-inch HDPE gravity sewer lines installed via pipe bursting, 8-inch PVC and DIP sewer line installed via traditional open-cut, repairing and replacing manholes, as needed, reconnection of sewer services, and abandonment of the existing small-diameter gravity sewer line in Waxhaw. Most of the sewer lines will replace existing small diameter gravity sewer in their existing alignments, installed via pipe bursting. The project involves both pipe bursting methods and conventional open-cut construction methods. Work also includes traffic control, bypass pumping, erosion control, testing, and surface restoration within the project limits.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...humps. * Earthwork, erosion control, and seeding and mulching as specified in the ...
State Government of North Carolina
Bid Due: 6/18/2026
...is requesting bids for clearing, tree cutting and erosion control type work in ...
Division of Highways
Bid Due: 6/09/2026
...and erosion control. Opening Date: 6/11/2026 2:00 PM Posted Date: 5/26/2026 Status: Open ...
State Government of North Carolina
Bid Due: 6/11/2026
...control, curb, gutter and sidewalk removal, paving and striping, erosion control and soil ...
State Government of North Carolina
Bid Due: 7/08/2026