| Project Title: | IFB 2024-083Rebid Waxhaw North Sanitary Sewer Replacement & Rehabilitation |
| Description: | The Project consists of constructing approximately 4,000 linear feet total of 10-inch HDPE gravity sewer lines installed via pipe bursting, 8-inch PVC and DIP sewer line installed via traditional open-cut, repairing and replacing manholes, as needed, reconnection of sewer services, and abandonment of the existing small-diameter gravity sewer line in Waxhaw. Most of the sewer lines will replace existing small diameter gravity sewer in their existing alignments, installed via pipe bursting. The project involves both pipe bursting methods and conventional open-cut construction methods. Work also includes traffic control, bypass pumping, erosion control, testing, and surface restoration within the project limits. |
| Opening Date: | 10/14/2025 2:00 PM |
| Posted Date: | 10/9/2025 |
| Status: | Open |
| Department: | COUNTY OF UNION |
|
Solicitation Number
*
377-2024-083Rebid
|
Department
COUNTY OF UNION
|
Status Reason
Open
|
|
|
Opening Date
2025-10-14T14:00:00.0000000
|
Posted Date
*
2025-10-09T13:39:23.0000000Z
|
Commodity Code
Construction Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
Select RFP IFB RFI
|
|
|
Description
The Project consists of constructing approximately 4,000 linear feet total of 10-inch HDPE gravity sewer lines installed via pipe bursting, 8-inch PVC and DIP sewer line installed via traditional open-cut, repairing and replacing manholes, as needed, reconnection of sewer services, and abandonment of the existing small-diameter gravity sewer line in Waxhaw. Most of the sewer lines will replace existing small diameter gravity sewer in their existing alignments, installed via pipe bursting. The project involves both pipe bursting methods and conventional open-cut construction methods. Work also includes traffic control, bypass pumping, erosion control, testing, and surface restoration within the project limits.
|
|||
|
Attachments
|
|||

With GovernmentContracts, you can:
...PVC Gravity Sewer Pipe and Replacement Manhole Grizzly Court Havelock, NC 28532" Description...: ...