Lakelands Park Synthetic Turf Replacement
| Location: |
Maryland |
| Posted: |
Apr 8, 2025 |
| Due: |
May 7, 2025 |
| Agency: |
State Government of Maryland |
| Type of Government: |
State & Local |
| Category: |
- S - Utilities and Training Services
- Z - Maintenance, Repair or Alteration of Real Property
|
| Solicitation No: |
BPM050568 |
| Publication URL: |
To access bid details, please log in. |
|
ID:
|
BPM050568
|
|
Title:
|
Lakelands Park Synthetic Turf Replacement
|
|
Status:
|
Open
|
|
Due / Close Date:
|
5/7/2025
|
|
Publish Date:
|
4/8/2025 4:59:00 PM
|
|
Main Category:
|
Structures and Building and Construction and Manufacturing Components and Supplies
|
|
Solicitation Type:
|
Public Notice
|
|
Issuing Agency:
|
City of Gaithersburg
|
Title
Lakelands Park Synthetic Turf Replacement
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Main Category
Structures and Building and Construction and Manufacturing Components and Supplies
|
|
|
|
|
|
|
|
|
|
|
|
|
Procurement Officer / Buyer
|
Email
procurement@gaithersburgmd.gov
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Solicitation Summary
The City of Gaithersburg is accepting formal proposals in support of this Design and Build project. This is for the demolition, removal, and recycling of the existing synthetic turf, design, manufacture, and installation of a new synthetic turf field system at Lakelands Park located at 1368 Main Street, Gaithersburg, Maryland 20878.
Lakelands Park has an existing synthetic turf field that was installed in 2014. The existing turf field is past its useful lifespan and needs to be replaced. The existing system utilizes an organic infill but does not have a shockpad. The new system shall incorporate a shockpad under the synthetic turf.
This project shall be a Design and Build project. The Contractor shall be responsible for all aspects of demolition, removing, and recycling the existing turf field, design, manufacture, inspection and correction of the existing base, and installation of the synthetic turf field system. The Contractor shall supply all labor, materials and supplies, and equipment necessary for successful completion of the project.
The turf field is used by both the City and the elementary school next to the site. The Contractor must be prepared to work with City staff immediately after a contract is signed to create the shop drawings, obtain approval for the shop drawings, and order all materials in a timely manner.
|
|
|
|
|
|
Project Cost Class
|
|
Pre-Bid Conference Information
Pre-Bid Conference Date (EST)
|
Pre-Bid Conference Details
An optional Pre-Submission Meeting at the location shown below on the date and at the time specified in the Solicitation Schedule. Attendance of the Pre-Submission Meeting is not mandatory but is strongly encouraged. Offerors are expected to bring a copy of all the Solicitation Documents to the Pre-Submission Meeting; the City will not provide copies. City of Gaithersburg Lakelands Park 1368 Main Street Gaithersburg, MD 20878
|
|
|
|
|
|
|
|
|
|
Small Business Reserve Designation
|
|
|
|
|
Procurement Program Participation Goals
|
|
VSBE Participation (%)
|
|
MBE Participation (%)
|
|
African American MBE Participation (%)
|
|
Asian American MBE Participation (%)
|
|
Hispanic American MBE Participation (%)
|
|
Women-Owned MBE Participation (%)
|
|
DBE Participation (%)
|
|
SBE Participation (%)
|
|
|
|
|
|
|
|
Socio Economic Participation Criteria
|
Daily notification on new contract opportunities
With GovernmentContracts, you can:
- Find more opportunities and win more business
- Receive daily alerts for all new bid opportunities
- Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.