| Location: | Washington |
|---|---|
| Posted: | Sep 17, 2026 |
| Due: | Sep 24, 2026 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | H9242126QE047 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
All questions must be submitted in writing to the Contracting Officer by September 21, 2026 at 5:00p.m (EDT).
A site visit will be conducted on September 18, 2026 at 1:30p.m (PDT). Personnel attending the site visit will meet at 9190 Cramer Ave, Joint Base Lewis-McChord, WA 98433. An escort is required for the site visit and will be provided by the Government. Point of contact for the site visit is CPT Megan Colpo (925) 917-0784. Contact the POC for assistance with directions and notify her of arrival due to the escort requirement. Personnel that do not have access to JBLM must go through the Visitor Center at Liberty Gate to receive a visitor's pass. Requirements for the visitor's pass includes REAL ID (passport and social security card for those that do not have a REAL ID), valid driver's license, and vehicle insurance information.
Desription of Work
This non-personal services contract requires the contractor to provide all necessary personnel, equipment, materials, and labor to remove and replace 16 nonfunctional ductless heat pump A/C systems with new, cooling-only split A/C systems. The work will take place across multiple First Special Forces Group (Airborne) headquarters and augmentation facilities (Buildings 9160/9162, 9190, 9934, and 9983) to establish optimal operational temperatures for critical computer and communication systems. The contractor operates independently under its own supervision, remaining fully accountable to the Government for meeting all performance standards.
The scope of work includes disconnecting and reconnecting power and refrigerant lines, removing and disposing of the nonworking units, and installing and testing the new cooling-only units. Additionally, the contractor must add external condensation pumps, purge and test existing drain lines, and replace them as needed. The designated period of performance for this mission-critical climate control upgrade is scheduled from September 28, 2026, to November 12, 2026.
| Sep 14, 2026 | [Combined Synopsis/Solicitation (Updated)] Split-Unit HVAC Replacement |
| Sep 23, 2026 | [Combined Synopsis/Solicitation (Updated)] Split-Unit HVAC Replacement |

With GovernmentContracts, you can:
Project ID: Title: Communication Services for Inmates at Pierce County Jail and Juvenile
Pierce County
Bid Due: 10/02/2026
SEP Program: Solicitation Name: ADVANCE NOTICE: Rail Modernization Program SEP %: Solicitation ID:
Washington Metropolitan Area Transit Authority
Bid Due: 9/30/2027
Follow Silver Reutilization and Account Maintenance Service Active Contract Opportunity Notice ID N0025327Q0001
DEPT OF DEFENSE
Bid Due: 10/01/2026
Solicitation Information Title Water and Wastewater Treatment Reference Number WSP-RFQQ-WWT3 Solicitation Close Date
State Government of Washington
Bid Due: 9/28/2026