| Location: | Ohio |
|---|---|
| Posted: | Feb 4, 2026 |
| Due: | Feb 26, 2026 |
| Agency: | State Government of Ohio |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | SRC0000036747 |
| Publication URL: | To access bid details, please log in. |
| Solicitation ID: | SRC0000036747 |
| Solicitation Name: | MVDC Maintenance Building Roof Repair |
| Original Begin Date: | 2/4/2026 1:09:34 PM |
| Begin Date: | 2/4/2026 1:09:34 PM |
| End Date: | 2/26/2026 2:00:00 PM |
| Inquiry End Date: | 2/17/2026 2:00:00 PM |
| Commodity: | Roofing service |
| MBE Set Aside: | MBE Set Aside |
| Agency: |
DDD200000 - DEVELOPMENTAL CENTERS
DDD206000 MT. VERNON DC MVDC |
| Solicitation Status: | Open for Bidding |
| Solicitation Type: | Quick Quote |
|
In an MBE set-aside solicitation, only those bidders/suppliers with an active MBE certification at the time the solicitation closes can submit a response
|
|||
|
Solicitation ID
SRC0000036747
|
|||
|
Solicitation Name
MVDC Maintenance Building Roof Repair
|
RFx Type
Quick Quote
|
||
|
Lot #
1
|
Solicitation Status
Open for Bidding
|
||
|
Round #
1
|
MBE Set Aside
|
||
|
Begin Date
2/4/2026 1:09:34 PM (ET)
|
Amendment?
|
||
|
End Date
2/26/2026 2:00:00 PM (ET)
|
Inquiry End Date
2/17/2026 2:00:00 PM
|
||
|
Summary
This soliciation is for the Maintenance Building Roof Repair at Mount Vernon Developmental Center. |
Predecessor Contract
|
||
|
Process
A site visit has been scheduled on
February 10, 2026, at 9:00 am
in order to view the exact scope of work of Maintenance Building roof repair, at which time potential bidders may review any additional requirements.
|
|||
|
Ship To
|
|||
1 Record(s)
|
4 Record(s)
|
Purpose: This solicitation is for roof repair of the Maintenance Building located at Mount Vernon Developmental Center.
RTP# 6561
RFQ Schedule:
• RFQ Issued: February 4, 2026
• Inquiry Period Begins: February 4, 2026
• Site Visit: February 10, 2026, at 9:00 am
• Inquiry Period Ends: February 17, 2026, at 2:00 pm
• Quotes Due: February 26, 2026, at 2:00 pm
Site Information:
Mount Vernon Developmental Center
1250 Vernonview Drive
Mount Vernon, OH 43050
Site Visit:
A site visit is required to view the exact scope of work, at which time potential bidders may review the Maintenance Building roof.
The site visit will be conducted at the Mount Vernon Developmental Center
Site Visit Date: February 10, 2026
Site Visit Time: 9:00am
Potential Bidders for the site visit shall check in at the Administration Building upon arrival and ask for Don Stotts, Building Maintenance Superintendent.
Specifications:
The Maintenance Building roof is a standing-seam metal roof requiring inspection and repair. All existing leaks must be addressed, and measures taken to prevent future issues. Known leak points include roof penetrations, flashing at edges, and seals around fire-break penetrations. Rusted areas should be sealed, and all gutters cleaned and resealed. The inspection and repairs will cover the entire roof.
Specifications will be verified during the site walk-through.
Requirements:
No work on the equipment covered herein shall be done by subcontractors unless prior approval is obtained from Mount Vernon Developmental Center. Contractor must use trained and qualified personnel directly employed and supervised by him/her, preferably the same technician for each time of service. The bidder shall be regularly engaged in the business of metal roof repair.
The contractor shall maintain all necessary licenses, certifications, and registrations throughout the term of the awarded contract. Contractor shall perform all services with reasonable care, skill and diligence as would normally be provided by an experienced consultant and in accordance with industry standards.
Mount Vernon Developmental Center is a Medicaid-certified Intermediate Care Facility for Individuals with Intellectual Disabilities (ICF/IID), operated by the Ohio Department of Developmental Disabilities (DODD), serving individuals with developmental and other disabilities. All individuals to be providing services on the grounds of any DODD Developmental Center shall have not been found guilty of, or pleaded guilty to, any offense set forth in Section 5123.08(1), (2), or (3) of the Ohio Revised Code; nor employ any person to provide services under this RFP who has been found guilty of, or pleaded guilty to any offense set forth in Section 5123.081(1), (2), or (3) of the Ohio Revised Code. The person(s) providing services under this contract will be subject to a criminal background check prior to performing any services at any DODD Developmental Center.
Awarded Contractor shall certify that all its employees, while working at any DODD Developmental Center, will not purchase, transfer, use, be under the influence of, or possess illegal drugs or alcohol, or abuse prescription drugs in any way. Contractor shall comply with all applicable provisions of the Rehabilitation Act of 1973 and the Americans with Disabilities Act (ADA), both in the provision of specified services and in its employment practices.
Contractor shall not be subject to an “unresolved” finding for recovery under Section 9.24 of the Ohio Revised Code. If there is a finding for recovery, the Contractor’s submission will be rejected.
All contract work must be completed during the hours of 7:00 A.M. and 3:30 P.M., Monday through Friday, unless prior arrangements are made with the Developmental Center’s project contact person. Contractor shall complete work for each specific job/task on consecutive days, this includes installation work.
The contractor must always keep the work area safe and must provide and use OSHA-approved barricades for any work that is exposed to the public. Contractor must always secure his tools and materials. Contractor must clean his work area of all refuse and scrap materials at the end of each workday.
The contractor must provide all parts, labor and fees associated with acquiring any necessary permits and associated engineering services as required to complete this project.
Inquiries:
From the issuance date of this solicitation, until a contract is awarded to a bidder, there may not be communications concerning the RFQ between any supplier who expects to submit a quote, and any employee of DODD involved in the issuing of the RFQ. The only exception is provided through the submission of written requests for clarification/interpretation via the RFQ through the OhioBuys website during the inquiry period.
Prospective bidders may make inquiries or seek clarifications regarding this RFQ any time during the inquiry period listed in the solicitation Calendar of Events. To make an inquiry, prospective bidders must use the Inquiry tab on the solicitation in OhioBuys to submit all inquiries or seek clarification.
Prospective bidders submitting inquiries will receive an immediate acknowledgement by e-mail that their inquiry has been received. The prospective bidder who submitted the inquiry will not receive an e-mail response to the question but will need to view the response on the OhioBuys website where it will be posted for viewing by all prospective bidders.
Attachments to an inquiry are not visible to DODD, so please include all questions in the inquiry description field.
DODD will try to respond to all properly posed inquiries within 48 hours, excluding weekends and state holidays. DODD will not respond to any inquiries received after the date and time indicated on the RFQ. Prospective bidders who attempt to seek information or clarifications verbally will be directed to reduce their questions to writing in accordance with the terms of this RFQ and state purchasing policy. No other form of communication is acceptable, and use of any other form of communication or any attempt to communicate with DODD staff or any other agency of the State to discuss this RFQ may result in the bidder being deemed ineligible.
Bid Submittal: Bidders must complete the “Item Grid” and attach an electronic copy of their quote within the solicitation in Ohio Buys. The quote must include an itemized listing of all parts, labor and fees associated with repair of the roof and gutter systems to prevent future leaks.
Prevailing Wages:
When the project exceeds the prevailing wage threshold levels, the contract is subject to Ohio Prevailing Wage Laws, Chapter 4115 of the Ohio Revised Code and the Contractor shall comply with all provisions contained therein. By submitting a bid, the bidder guarantees that the prevailing wage scale to be paid to all labor employed on the contract shall be in accordance with the published schedule of the prevailing hourly wage and fringe benefits ascertained and determined by Ohio Department of Commerce, Wage and Hour Bureau for the county in which the work is being performed. The following links will provide information on prevailing wage requirements, rates, and laws.
Prevailing Wage Threshold Levels
Prevailing Wage Rates
Contractor shall be responsible for verification of current classification rates for work location(s). Prevailing wage rates may change throughout the life of the project, and it is the responsibility of the contractor to be in line with current rates.
Bidder may access the Ohio Department of Commerce, Wage & Hour Bureau at its website, https://wagehour.com.ohio.gov/w3/webwh.nsf/wrlogin/?openform, to obtain the current wage rates.
Time of Performance:
The initial awarded contract is estimated to become effective on March 6, 2026 and remain effective through June 30, 2026, or until terminated as provided in the contract.
Evaluation / Award: Bids will be evaluated, and the contract will be awarded to the lowest responsive and responsible bidder as determined by the agency.
Attachments:
The following attachments must be completed and submitted as part of the bidder’s quote in OhioBuys in order to be considered for award.
• Standard Affirmation and Disclosure Form
The Standard Affirmation and Disclosure Form attached to the RFQ must be completed, signed by an authorized official of the bidder’s organization, and submitted with any quote to be considered.
• Contractor Information Form
The Contractor Information Form attached to the RFQ must be completed and submitted with any quote to be considered.
• Contractor Certification Statement Form – Required Only If Applicable
All bids will be considered for preferences, with Bidders being able to qualify for any number of preferences (i.e., Buy American, Buy Ohio, and VBE). If an bidder is claiming preferences, the Certification Statement Form must be completed and submitted with the quote for it to be applied to quote evaluation.

With GovernmentContracts, you can:
.../2026 3:30:00 PM Commodity: Roofing service MBE Set Aside: MBE Set Aside Agency: ...
State Government of Ohio
Bid Due: 7/08/2026
...but not limited to replacement and/or upgrading of finishes, flooring, paint, lighting systems, ...
State Government of Ohio
Bid Due: 6/12/2026