| Location: | Wisconsin |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | Apr 29, 2026 |
| Agency: | City of Kenosha |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 10171278 |
| Publication URL: | To access bid details, please log in. |
| Site Address: | 625 52nd Street, Room 305 | |
| City: | Kenosha | |
| County: | Kenosha | |
| State/Province: | WI | |
| Site Directions: | 7501 2nd Avenue |
| Closing Date: | Wed, 04/29/2026 02:00 PM CDT | |
| Project Bid Received By & Opening Information: | Director of Engineering Department of Public Works 625 – 52nd Street, Room 305 Kenosha, Wisconsin 53140 | |
|
Pre-Qualification:
|
Yes
|
| Project Owner Number: | Project 26-1425 Southport Beach House Drainage Improvements | |
| Project Category Code: | Erosion Control/Slope, Bank Stabilization, Drainage, Sidewalks/Curbs/Gutters, Stormwater Improvements, Directional Drilling, Paving (Asphalt or Concrete) | |
| Description: | The project includes, but not limited to, asphalt pavement, concrete sidewalk, directional drilling, installation of 6”-8” underdrain/storm sewer, construction of biobasins, foundation coring, erosion control, restoration and incidentals. |
| Owner Name: | Kenosha WI, City of | |
| Address: |
625 52nd Street, Room 305, Kenosha, WI - 53140 |
|
| Phone: | 262-653-4150 | |
| Contact: | Kristin Brown | |
| Email: |
kbrown@kenosha.org |
| Solicitor Name: | Kenosha WI, City of | |
| Design Discipline: | Soliciting agent | |
| Address: |
625 52nd Street, Room 305,
Kenosha, WI - 53140 |
|
| Phone: | 262-653-4150 | |
| Contact: | Kristin Brown | |
| Email: |
kbrown@kenosha.org |
| Document Information: | The form provided for "Bidder's Proof of Responsibility" shall be completed and returned to the Director of Engineering not less than five (5) days before the date of bid opening. Bidders can examine and obtain this form by going to: https://www.kenosha.org/images/public-works/permits-forms-applications/PWE007-Bidder'sProofofRespo nsibility.pdf or access the link to the “Bidder's Proof of Responsibility” form under “Permits, Forms and Applications”. | |
| Quest eBidDoc™ Delivery Info: |
Download delivery fee is $22.00, file size is
4 MB . Preview Download |

With GovernmentContracts, you can:
...; Bore- Sewer/Water/Utility Construction,Manhole Rehabilitation,Paving - Concrete,Sanitary Sewer... (Gravity),Sewer and Water Construction,Sewer Force ...
City of La Crosse
Bid Due: 9/02/2026
...Installation) 91063 Public Utilities: Water, Sewer and Gas Maintenance and Repair 91082 Wiring...
State Government of Wisconsin
Bid Due: 8/13/2026
.... Work includes roadway and sidewalk construction; water main, sanitary sewer, and storm ...
Milwaukee County
Bid Due: 8/07/2026
...Public Works Operations Building 04/23/26 9780 15513 CIPP UV Lining Rehabilitation of Sewers ...
City of Madison
Bid Due: 12/17/2026