| Location: | Vermont |
|---|---|
| Posted: | Dec 15, 2025 |
| Due: | Feb 12, 2026 |
| Agency: | State Government of Vermont |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
|
Bid Type: Job Contract Locations: Lamoille Keywords: Construction (Building), Construction (Non Building), Renewable Energy, Concrete, General Contractor Bid Description: The Town of Stowe Electric Department (SED), a Vermont municipal electric department, is soliciting bids for the repowering of the Smith’s Falls Hydroelectric Dam. The project consists of rehabilitating the existing concrete dam and spillway, restoring and extending the existing concrete sluiceway, construction of a new hydroelectric powerhouse structure that will contain the turbine, draft tube, generator, and hydroelectric controls, and associated site work and other project related construction. The full Request for Bids is available at: https://www.stoweelectric.com/rfps Or by emailing Michael Lazorchak at: mlazorchak@stoweelectric.com
|
||||||||||||||||||||||

With GovernmentContracts, you can:
...Naulakha Drainage Project - Construction Request Date: 6/9/2026 11:26:55 AM Open Date: 6/8/2026... ...
State Government of Vermont
Bid Due: 6/25/2026
...RFQ - Construction Manager at Risk (CMAR) Contractor Services for Burlington Main WWTF ...
State Government of Vermont
Bid Due: 7/15/2026
...Follow Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 7/06/2026
...Follow Design Bid Build (DBB) Construction Requirement for Alburg Springs Land Port of ...
GENERAL SERVICES ADMINISTRATION
Bid Due: 7/27/2026