| Location: | Pennsylvania |
|---|---|
| Posted: | Feb 4, 2026 |
| Due: | Mar 5, 2026 |
| Agency: | Montgomery County |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-04 |
| Publication URL: | To access bid details, please log in. |
Project Description: The County, on behalf of the Department of Assets & Infrastructure, Division of Roads & Bridges, is seeking a qualified engineering firm to perform the required engineering, environmental permitting and construction consultation for the replacement of County Bridge No. 83, Butler Pike over Wissahickon Creek in Upper Dublin Township. The existing bridge, built in 1926, is a three-span concrete T-beam bridge. The bridge has a span of 198 feet with a curb-to-curb width of 34 feet.

With GovernmentContracts, you can:
...Description: Sealed bids for the construction of a 75' long steel beam and ...
PennBid
Bid Due: 6/29/2026
...bids for underpinning, concrete repairs, steel beam replacement, rock placement, and stormwater pipe...
PennBid
Bid Due: 6/11/2026