Wire & Cable

Location: Florida
Posted: Mar 25, 2026
Due: Apr 3, 2026
Agency: Orlando Utilities Commission
Type of Government: State & Local
Category:
  • 17 - Aircraft Launching, Landing, and Ground Handling Equipment
Solicitation No: PR9071
Publication URL: To access bid details, please log in.
Main

Agency
Orlando Utilities Commission
Status
Active
Fiscal Year
2026
Primary Contact
Maria Cabreja
Title
Wire & Cable
Secondary Contact

Number
PR9071
Tertiary Contact

Type
Request for Proposal
Department
Purchasing
Online Submissions
Yes
Project Estimate
Piggyback Solicitation
No
Insurance Required
Yes
Bid Bond Required
No
Bid Bond Amount

Performance Bond Required
No
Performance Bond Amount

Construction Bond Required
No
Construction Bond Amount

Scope of Services
Orlando Utilities Commission (OUC) and Kissimmee Utility Authority (KUA) are looking for a qualified and authorized Supplier(s) to provide competitive proposal for the furnishing of wire and cable.
Dates(All times are listed as EST )

Broadcast Date
2/11/2026 4:00 PM EST
Question End Date
3/6/2026 5:00 PM EST
Sample Due Date
Due Date
4/3/2026 2:00 PM EST
Bid Opening Date

Question End Date Reminder Notification
2 Day(s)
Sample Due Date Reminder Notification
0 Day(s)
Due Date Reminder Notification
2 Day(s)
Pre-Bid Meetings

Total: 0 (All times are listed as EST )
Date Time Mandatory Location
Shortlist Meeting

Total: 0 (All times are listed as EST )
Date Time Location
Documents

Total: 12
Type Name Description File Type
Request for Proposal RFP PR9071 - Wire & Cable.pdf RFP PR9071 Wire & Cable PDF
Attachment B: Price Schedule Attachment B Price Schedule RFP PR9071 - Wire & Cable.xlsx PR9071 Attachment B: Price Schedule Excel
Request for Proposal PR9071 Attachment C OUC Specs.pdf Attachment C: OUC Specs PDF
Request for Proposal Attachment D KUA Wire and Cable - Wire Tables and Technical Specs.pdf Attachment D: KUA Specs PDF
Addendum Addendum No.1 RFP PR 9071 Wire & Cable.pdf Addendum No.1 RFP PR 9071 Wire & Cable PDF
Addendum Ack addenda form.pdf Ack Addenda Form PDF
Addendum Revised OUCcablespec01855100R 3-9-26.pdf Revised OUCcablespec01855100R 3-9-26 PDF
Addendum Addendum No. 2 RFP PR9071 Wire & Cable.pdf Addendum No. 2 RFP PR9071 Wire & Cable PDF
Addendum Revised OUC Primary UG Cables - App. Mfg List 002.pdf Revised OUC Primary UG Cables - App. Mfg List PDF
Addendum Addendum No. 3 RFP PR9071 Wire & Cable.pdf Addendum No. 3 RFP PR9071 Wire & Cable PDF
Addendum Addendum No. 4 RFP PR9071 Wire & Cable.pdf Addendum No. 4 RFP PR9071 Wire & Cable PDF
Addendum Addendum No. 5 RFP PR9071 Wire & Cable.pdf Addendum No. 5 RFP PR9071 Wire & Cable PDF
Quote/Bid


Zones
Total: 0
Zone

Groups
Total: 0
Group
Quote/Bid Items

Total: 0
# Required Group Make Model Description Quantity Unit of Measure Price/ Percent Type

Additional Quote/Bid Items Fields
Display Options Spreadsheet Section
No Display Image and Specifications Hyperlink Fields
No
Display Build Sheet File Upload Field
No Display Options File Upload Field
No
Require Build Sheet File to be Uploaded
No Require Options File to be Uploaded
No
Display Lead Time Field
No Display Standard Packaging Field
No
Delivery Date
None
Required Files to be Uploaded by the Vendor
Proposal
Bid

Shipping
FOB Destination
Terms and Conditions
See OUC`s Terms and Conditions
Include Shipping in Price of Items
Yes
Display Bid Tabulation to Vendors
No
Display Vendor Submissions to Vendors
No
View Vendor Submissions while Bid Solicitation is Active
No
Allow Options File to be Updated after Due Date
No
Allow Post Due Date Submission
No
Questions & Answers

Total: 7
Question Date Asked Answer Date Answered
2/26/2026 6:56:27 PM
Attachment A (2.3) Indicate what indexes and time period the price movements will be tied to.

Is there a preferred set of indexes that the end user utilities would prefer to be used in the bid submittal?
2/27/2026 12:58:51 PM Copper (Primary Conductor Material)
COMEX Copper Futures
•        Source: CME Group
•        Basis: Monthly average settlement price
•        Usage: Most common index for copper conductor adjustment

Aluminum (Overhead T&D Conductors)
•        London Metal Exchange Aluminum

Insulation & Polymer Indices (Underground/Covered Conductors)
•        Producer Price Index (PPI) for Plastic Materials and Resins
o        PPI Resin specific weighting [e.g.,XLPE, PVC, HDPE] (WPU063201)
o        PPI for general insulation adjustments (WPU063)
Steel Component Indices (ACSR, Guy Wire)
Producer Price Index for Steel Wire (WPU101706)
3/5/2026 7:33:56 AM
Can OUC provide the metals base that they would like pricing to be calculated from? 3/3/2026 3:54:55 PM Copper (Primary Conductor Material)
COMEX Copper Futures
•        Source: CME Group
•        Basis: Monthly average settlement price
•        Usage: Most common index for copper conductor adjustment

Aluminum (Overhead T&D Conductors)
•        London Metal Exchange Aluminum

Insulation & Polymer Indices (Underground/Covered Conductors)
•        Producer Price Index (PPI) for Plastic Materials and Resins
o        PPI Resin specific weighting [e.g.,XLPE, PVC, HDPE] (WPU063201)
o        PPI for general insulation adjustments (WPU063)
Steel Component Indices (ACSR, Guy Wire)
Producer Price Index for Steel Wire (WPU101706)
3/5/2026 7:34:50 AM
Questions Regarding KUA Specs:

1.        For Item numbers “WIREPRIMARY2”, “WIREPRIMAR10”, and “WIREPRIMAR40”, Neutral configuration not provided in BOM or in specs provided. Please provide either the wire configuration or the CN fraction necessary.

2.        In the spec, it is not mentioned whether Red-Stripes are required or not for the cable. Please clarify if red stripes are optional, mandatory, or shall not be included in the cables.

3.        According to construction specifications, the cable should be a filled conductor per ICEA T-31-610 guidelines. Under codes and standards for compliance, ICEA T-34-664 is referenced. But no mention of the moisture block requirement underneath between the shield and the jacket specified.
Please clarify whether all cables should be made per ICEA T-31-610 and ICEA T-34-664.

4.        For the specs with 15KV EPR cables, shield resistance is a test requirement referenced to be tested and reported in CTRs. Please clarify if this is in reference to Volume resistivity test requirements under ICEA S-94-649.
In addition, please clarify if this is not required on the TRXLPE cable specs.

5.        Reel tolerances: On the cable specs, a ± 5% tolerance is specified. But some of the item descriptions have their own tolerance specified as well, e.g.: “WIRECU500MCM” tolerance of (0-10%), “WIRECU750MCM” tolerance of +5% only.
Please clarify which cable tolerance should be followed.

6.        Certain specific item descriptions have “with Pulling eyes” specified, even though it’s not mentioned under packaging. Please clarify if this has to be done by the cable manufacturer and whether if it’s required only on specified items.

3/3/2026 4:14:53 PM 1.        For all KUA medium-voltage cable including WIREPRIMARY2, WIREPRIMAR10, WIREPRIMAR40, the concentric neutral shall be 1/3 neutral.
2.        Red stripes are not required by the KUA cable specifications. If provided by the manufacturer, they are optional.
3.        All KUA medium-voltage cable shall comply with ICEA T-31-610 and ICEA T-34-664. The cable shall include water-blocking components, including filled conductor interstices and other water-blocking materials necessary to meet ICEA water migration performance requirements.
4.        For all KUA 15 kV primary (EPR & TR-XLPE), the metallic shield (concentric neutral) resistance shall be measured end-to-end on the completed cable length and reported on the CTRs. Semiconducting shield materials shall meet volume resistivity requirements per ICEA S-94-649.
5.        The standard cable length tolerance for KUA cable is 0% to +5% (no underrun permitted).
6.        Factory-installed pulling eyes are not required for KUA cable. KUA will install its own pulling eyes as required for construction operations.
3/11/2026 1:44:18 PM
Questions Regarding OUC Specs: 1.        In the spec, some of the items require a water blocked test to be conducted under ICEA T-31-610, while some of the requires ICEA T-34-664. Please clarify if that shall be followed per case by case specified per items, or one uniform test for overall testing of stock items.

2.        In the spec, some of the items require three red stripes, while some of the items do not specify. Please clarify if Red striping should be conducted for selected items in the spec or considered as an overall uniform requirement.

3.        ANSI C119.4 Connection Test Report: LS Cable is unable to provide the requested report at this time prior to two weeks before bid opening. Because cable splice fittings have various manufacturers with various fitting types related to cable splicing accessories. Due to these variants, the performance will be different on the splicing accessories. Will cable compatible with any splice kit manufacturer and kit type that is made per industry-recognized standards and listings suffice?
3/3/2026 4:17:13 PM Questions Regarding OUC Specs: 1. In the spec, some of the items require a water blocked test to be conducted under ICEA T-31-610, while some of the requires ICEA T-34-664. Please clarify if that shall be followed per case by case specified per items, or one uniform test for overall testing of stock items. ICEA T-31-610 will be used for all cables.
2. In the spec, some of the items require three red stripes, while some of the items do not specify. Please clarify if Red striping should be conducted for selected items in the spec or considered as an overall uniform requirement. Three red stripes are required for all cables.
3. ANSI C119.4 Connection Test Report: LS Cable is unable to provide the requested report at this time prior to two weeks before bid opening. Because cable splice fittings have various manufacturers with various fitting types related to cable splicing accessories. Due to these variants, the performance will be different on the splicing accessories. Will cable compatible with any splice kit manufacturer and kit type that is made per industry-recognized standards and listings suffice? Yes
3/4/2026 2:44:03 PM
Attachment A (2.3) says to indicate the time period that the price movement is tied to. Should that time period be set so that everyone is on the same level? 3/4/2026 5:28:19 PM Per Attachment A (2.1) The preferred frequency of price adjustment is monthly. 3/5/2026 7:48:20 AM
OUC SPEC SHEET #018-55100
-        The 11-#14 CU Concentric Neutral called out for stock number 018-55100 is not equivalent to a 1/3 neutral for a 1000KCM AL conductor. Does this cable construction require an 11-#14 neutral configuration or a 1/3 (20-#10) neutral configuration?
3/6/2026 11:21:35 AM A revised OUC SPEC SHEET #018-55100 was attached with the concentric neutral requirement (18-#10 strands of AWG uncoated copper wire). 3/11/2026 1:46:01 PM
Commodity Codes

Total: 4
Code Description
[280-58] High Voltage Cables and Wires (601-15,000V), Solid and Stranded, Single and Multiconductor
[280-80] Underground Cables and Wires, Solid and Stranded, Single and Multiconductor, Aluminum and Copper: Types UF, URD, USE, XLP, etc.
[280-90] Weatherproof Cables and Wires, Solid and Stranded, Single and Multiconductor, Aluminum and Copper: Types RR, WP, etc.
[280-95] Wire and Cable (Not Otherwise Classified)
Publications

Total: 0
Publication Date
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Title Booth and Table Rental at Prime F. Osbourne Solicitation Type ITQ Status ...

City of Jacksonville

Bid Due: 6/08/2026

...Event is an event were vendors are stationery at a table and attendees ...

Tampa International Airport

Bid Due: 7/10/2026

...DOCUMENTS PAGE INTENTIONALLY BLANK GPU & PCA REPLACEMENT PENSACOLA INTERNATIONAL AIRPORT TABLE... OF ...

City of Pensacola

Bid Due: 6/08/2026

...Section 1 2 3 4 5 6 Table of Contents Title Introduction Proposed ...

Suwannee River Water Management District

Bid Due: 6/10/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.