| Location: | Utah |
|---|---|
| Posted: | Dec 16, 2025 |
| Due: | Jan 22, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 25-48 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project will involve: the installation of roughly 2,388 feet of 42-inch RCP storm drain pipe, 748 feet of 36-inch RCP storm drain pipe, 65 feet of 30-inch RCP storm drain pipe, 30 feet of 18-inch RCP storm drain pipe and 71 feet of 15-inch plastic storm drain pipe, including structures and surface restoration. A large portion of this project is located within UDOT right-of-way, and will require dewatering.

With GovernmentContracts, you can:
...Project: Santaquin Storm Drain Master Plan Update Ref. #: Santaquin-08 Department: CITIES... engineering ...
State Government of Utah
Bid Due: 10/09/2026
...roadway reconstruction and related improvements, storm drain design, utility coordination, and other...
City of Ogden
Bid Due: 10/15/2026