CITY OF ROELAND PARK, KANSAS
NOTICE
REQUEST FOR BIDS
The City of Roeland Park seeks bids for the
installation of an irrigation system for the R Park
Soccer Fields
R Park Irrigation Install
Sealed bids Must Be Received No Later Than:
March 10, 2026
3:00 p.m.
Please mark bid on the outside envelope "R Park Irrigation Install" and submit to:
City Clerk
City of Roeland Park
“R Park Irrigation Install”
4600 W 51st St # 200
Roeland Park, KS 66205
1
1. Purpose
The City of Roeland Park is seeking bids for the installation of a permanent irrigation
system at the R Park Soccer Fields to provide efficient, automated irrigation in accordance
with the project specifications.
Estimated Timeline for Selection and Implementation
Tuesday, February 10, 2026
Notice to Bidders published
Tuesday, March 10, 2026
Bids due to City Clerk’s and Bid Opening
Monday, March 16, 2026
City Council Awards Contract
On or About Friday, March 20, 2026
City Issues Notice to Bidder
2. Scope of Work
The City of Roeland Park is seeking bids from qualified contractors for the installation of a
permanent, automated irrigation system at the R Park Soccer Fields located at 5535
Juniper Drive, Roeland Park, Kansas.
The work shall include all labor, materials, equipment, and services necessary to
furnish and install a complete and operational irrigation system in accordance with the
specifications described herein and all applicable codes and regulations.
1. Soccer Field Irrigation (Base Bid)
The contractor shall:
a. Provide full irrigation coverage for the soccer field area as shown on the
attached map.
b. Locate all irrigation heads outside of active play areas and configure the
system to avoid tripping hazards.
c. Design and install a zoned irrigation system suitable for heavy turf and high-
use athletic field conditions.
d. Provide a system capable of supporting up to approximately seventeen (17)
irrigation zones.
e. Furnish and install all required piping, irrigation heads, valves, wiring,
controllers, and related components necessary for a complete system.
f. Verify all code-required backflow prevention requirements and include any
required backflow prevention devices in the base bid.
g. Connect the irrigation system to the existing water service line serving the
park restroom facility, as shown on the attached map.
h. Install the irrigation controller within the restroom maintenance room.
i. Provide a controller capable of programmable scheduling and seasonal
adjustment.
j. Power the irrigation controller from the existing restroom electrical service
unless otherwise noted by the contractor.
k. Restore all disturbed soil and turf areas resulting from installation activities
to pre-installation condition.
l. Provide final irrigation layout and zone design suitable for the described
scope of work.
2
m. The approximate irrigation perimeter is 649 linear feet with an approximate
irrigated area of 25,095 square feet.
n. Provide the City with a written winterization SOP for the entire system.
2. Add Alternates
Add Alternate No. 1 – Flower Bed Irrigation
Provide irrigation for landscaped flower beds located near “See Red Run” as
shown on the attached map. The approximate irrigation perimeter is 185 linear feet
with an approximate irrigated area of 901 square feet.
Add Alternate No. 2 – Hose Bib / Spigot
Install one (1) hose bib on the north end of the soccer field as shown on the
attached map. The hose bib shall be frost-free, lockable, and suitable for use in a
public park setting.
3. Contractor Responsibilities
The contractor shall:
• Provide all necessary permits and inspections as required.
• Coordinate work with the Parks & Recreation Superintendent.
• Include in the bid the number of zones, type of irrigation heads, head
spacing assumptions, and a simple irrigation layout sketch.
• Comply with all applicable federal, state, and local laws, codes, and
regulations.
Locations R Park
5535 Juniper Drive
Roeland Park, KS 66205
A contract between Contractor and City detailing Scope of Work, expectations of service,
separation procedures, and other legal topics is to be reviewed and signed by Contractor
and City.
3. Bid Requirements
Bidders should inspect the location prior to submission of a bid. Bids must be
submitted on the attached Bid Form and must be enclosed in a sealed envelope
marked “R Park Irrigation Install”. Bids received will remain subject to acceptance
for sixty (60) days after the Bid date.
The City reserves the right to reject any or all bids and to determine bidder
responsibility in accordance with applicable law
The successful bidder must obtain an occupational license from the City Clerk’s office.
3
4. Insurance and Bond Requirements
The successful bidder shall procure and maintain, at their own expense, insurance coverage for the duration of the
project. Prior to commencement of work, the bidder shall submit a certificate of insurance naming the City of
Roeland Park, Kansas, its officials, officers, and employees as additional insureds. Insurance shall be written by
carriers licensed in the State of Kansas and shall include the following minimum limits:
• Commercial General Liability Insurance, including products and completed operations,
with limits of not less than $2,000,000 per occurrence and $2,000,000 aggregate (per
project).
• Workers’ Compensation Insurance in compliance with statutory requirements of the
State of Kansas.
• Automobile Liability Insurance, if applicable, covering owned, non-owned, and hired
vehicles, with limits of not less than $2,000,000 per occurrence.
• Employers’ Liability Insurance with limits of not less than $1,000,000 each accident,
$1,000,000 each employee, and $1,000,000 policy limit.
All policies shall provide for a minimum of thirty (30) days’ written notice to the City prior to
cancellation or material change in coverage. Failure to maintain the required insurance
coverage shall constitute a material breach of contract.
5. Submission Deadline
Interested contractors shall submit one (1) sealed copy of their Bid Form to: City Clerk,
City of Roeland Park, 4600 W 51st St #200, Roeland Park, KS 66205. All bids must
be marked on the outside of the envelope: “R Park Irrigation Install” Bids must
be received no later than 3:00 p.m., Tuesday, March 10, 2026.
6. Timely Delivery
It is the responsibility of contractor to ensure that their bid arrives at the City Clerk’s
office on time. Late or non-delivery due to mail or express delivery company failure
are insufficient reasons to consider late bids. Bids received after 3:00 p.m. on
Tuesday, March 10, 2026 will not be considered.
7. Uniformity
For ease, uniformity and fairness in the evaluation of bids, it is required that each bid
conforms in all respects outlined in this document.
8. Award Criteria
The contract will be awarded to the lowest responsive and responsible bidder
whose bid meets the requirements of the bid documents and is determined to be in the
best interest of the City of Roeland Park. The City reserves the right to reject any or all
bids and to waive informalities or minor irregularities in any bid. All bids shall be
irrevocable for a period of sixty (60) days from the bid deadline stated in Section 6.
4
9. Waiver
By the submission of a bid in response to this request, the bidder hereby expressly
waives the right to bring, file or enforce any and all claims or causes of action, legal or
equitable, against the City, its officers, agents or employees that pertain or relate to
the City’s bid process, to include but not limited to the notice, letting, review and award
stages, processes and procedures. This waiver shall be effective as of the bidder’s
submission of its bid form and shall be irrevocable by bidder, its successors and
assigns. If bidder takes any action in contradiction of this waiver, then the City shall be
awarded all costs associated with its defense of such actions including but not limited
to reasonable attorney fees, filing fees and other legal costs.
Contract Time
The City is looking for installation of the R Park Irrigation system to be completed by
April 17, 2026, weather permitting.
10. Rights Reserved by the City
The City of Roeland Park reserves the right to reject any or all bids, to waive
informalities or minor irregularities in any bid, and to award the contract in the best
interest of the City.
11. Prebid Meeting
There is no pre-bid meeting. Please Contact Nathan Brungardt at 913-742-7006 or
nbrungardt@roelandpark.org to schedule a site visit.
Location: R Park, 5535 Juniper Dr, Roeland Park, KS 66205
12. Payment Schedule
Funds will be released to the contractor following the installation and sign off or the
finished project from the City.
13. City Points of Contact
Questions concerning this request are to be directed to: Nathan Brungardt, Parks and
Recreation Superintendent (913-742-7006), nbrungardt@roelandpark.org
All persons/organizations awarded and/or who enter into contracts with the City of Roeland
Park shall be subject to and required to comply with all applicable City, State and Federal
provisions pertaining to nondiscrimination, equal employment opportunity and affirmative
action on public contracts.
Attachments
• Bid Form
• R Park Soccer Field Map
5