| Location: | Minnesota |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 12, 2026 |
| Agency: | Metropolitan Airports Commission (MAC) |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | Solicitation160 |
| Publication URL: | To access bid details, please log in. |
Project Description: This project provides for there are twenty-nine (29) illuminated Water Closet Information Display Systems (WcIDS) throughout Terminal 1, Terminal 2 and the Silver Ramp whose digital display monitors need replacing. This involves removing the WcIDS glass signage, and recaulking it back into place once the new digital display has been installed behind the glass. Access Panels need installing into hard lid ceiling soffits as shown on Architectural drawings, painted to match existing ceiling paint. The new monitors will each utilize an Owner-provided computer that will be installed inside an adjacent plumbing chase by the General Contractor along with other various components described in the documents. Electrical & Low Voltage work includes removing and reinstalling MAC-IT provided equipment, removing CAT6 cabling & reinstalling, installing IP Controllers back to Telecommunication Rooms, and Commissioning of each monitor.

With GovernmentContracts, you can:
...cabling to be Category CAT 6A. Install quantity (QTY) (29) CAT 6A cable ...
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 6/09/2026