4001-091626 - High Point Transit System Sewer Line CIPP Rehab

Location: North Carolina
Posted: Aug 21, 2026
Due: Sep 16, 2026
Agency: City of High Point
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Title: 4001-091626 - High Point Transit System Sewer Line CIPP Rehab
Category: Bid Opportunities
Status: Open
Bid Recipient: greg.parret@highpointnc.gov
Description:

The City of High Point is seeking to furnish all labor, materials, equipment, and supervision necessary to rehabilitate approximately 220 linear feet of existing sanitary sewer line at the High Point Transit System facility using trenchless Cured-In-Place Pipe (CIPP) technology, including pipe cleaning, CCTV inspections, service reinstatement, quality control documentation, and all related work necessary for a complete installation.


Publication Date/Time:
8/20/2026 1:50 PM
Closing Date/Time:
9/16/2026 2:00 PM
Bid Opening Information:
Non-Public Opening
Contact Person:
Greg Parret
greg.parret@highpointnc.gov
336-883-4795
Download Available:
See Attachment
Plan & Spec Available:
See Attachment
Plan Holders List:
greg.parret@highpointnc.gov
Related Documents:

Attachment Preview

FINANCIAL SERVICES
Purchasing Division
REQUEST FOR BIDS
High Point Transit System Sewer Line CIPP Rehabilitation
August 20, 2026
Bid Due Date: Wednesday, September 16,
and time: 2026 2:00 PM
Bid Number: 4001-091626
Contract Number:
Mailing Address: PO Box 230
High Point NC 27261
Delivery Address: Warehouse/Purchasing 816 E
Green Drive
High Point, NC 27260
Greg Parret
Purchasing Contact:
greg.parret@highpointnc.gov
E-mail:
Phone: 336-883-4795
IF YOU NEED ANY REASONABLE ACCOMMODATION FOR ANY TYPE OF DISABILITY IN ORDER TO PARTICIPATE IN
THE PROCUREMENT, PLEASE CONTACT PURCHASING AS SOON AS POSSIBLE.
Vendor Name:
Vendor Address:
City of High Point | P.O. BOX 230, High Point, NC 27261 | 336.883.3219
1

Bidder Information Form
All pages bound within this Bid Document are necessary parts thereof and Shall Not be
detached, taken apart and/or altered, or bid shall be considered non-responsive.
--PLEASE TYPE OR PRINT LEGIBLY IN BLUE OR BLACK INK--
Vendor Name (include d.b.a. information if applicable)
Entity Formation (check applicable): Corporation Limited Liability Company Partnership Sole Proprietorship
Limited Company Limited Partnership
Principal Office Address (Per Secretary of State)
City, State & Zip Email Address Telephone Number
Federal Tax ID #/Social Security # General Contractor License # (if applicable)
Print Name & Title of Person Signing on Behalf of Vendor Vendor's Authorized Signature
*By signing above the vendor acknowledges that terms and conditions and instructions associated with
this bid have been read and accepted.
* Failure to execute/sign this bid properly prior to submittal shall render the bid invalid and it
WILL BE REJECTED.
Late bids will NOT be accepted.
Offer valid for 60 days from date of bid opening. After this time, any withdrawal of offer shall be made in
writing, effective upon receipt by the agency issuing this Invitation to Bid.
* Pursuant to General Statutes of North Carolina, Section 143-129, as amended, bids and proposals are
subject to the conditions and specifications herein, are invited for materials and equipment as
described herein.
* Prices or any other entry made hereon by the bidders shall be considered firm and not subject to
change or withdrawal.
* Bidders certify under penalty of perjury that this bid has not been arrived at collusively and that
no Federal or North Carolina antitrust laws have been violated.
* State and County sales taxes shall not be included in the bid prices. Sales tax shall be added to vendors
invoice and will be paid to vendor at time of invoice payment.
* Bidders shall sign this form along with this entire bound bid document on or before the above date
and time, to the City of High Point Purchasing Division, P O Box 230 (27261), 816 E Green Drive, High
Point, NC 27260
2

NOTICE TO BIDDERS
Sealed proposals will be received by the Purchasing Division of the City of High Point, North
Carolina, until 2:00 PM on Wednesday, September 16, 2026, located in the Municipal
Operations Center, Warehouse Building at 816 East Green Drive, High Point, NC, (Come
through the guard gate, go to the stop sign and make a left. The Warehouse is the last door
on the right, look for the dock and yellow chain and the Purchasing/Warehouse sign. Parking
will be on your left), This will not be a Public Bid Opening:
Bid 4001-091626
High Point Transit System Sewer Line CIPP Rehabilitation
The City of High Point is seeking to furnish all labor, materials, equipment, and supervision
necessary to rehabilitate approximately 220 linear feet of existing sanitary sewer line at the High Point
Transit System facility using trenchless Cured-In-Place Pipe (CIPP) technology, including pipe
cleaning, CCTV inspections, service reinstatement, quality control documentation, and all related
work necessary for a complete installation.
Bids are invited for work as follows as well as all related miscellaneous work:
All miscellaneous work related to the above. Quantities and major work items are more
thoroughly described herein.
General contractors are notified that "An Act to regulate the Practice of General Contractors",
Section 87-1 through 15, ratified by the General Assembly of North Carolina, on March 10, 1925,
and as subsequently amended will be observed in receiving and awarding general contracts.
Copies of the Contract Documents and Plans may be obtained from the City of High Point.
The City reserves the right to reject any and all bids, as may in the judgment of the City, serve its
best interest and the City further reserves the right to waive irregularities and informalities in any
bid submitted.
In accordance with the Federal "Americans with Disabilities Act" (the Act), the City of High
Point will not discriminate against individuals and will not do business with vendors who
discriminate against such individuals in violation of the Act.
Greg Parret
Buyer
3

INSTRUCTIONS TO BIDDERS
1. Receipt and Opening of bids:
A. The City of High Point invites Bids on the form attached hereto, all blanks of which
must be appropriately filled in. (Do Not Complete Construction Agreement Section)
B. The City of High Point will receive Bids by the Purchasing Division at the Municipal
Operations Center, Warehouse Building at 816 East Green Drive, High Point, NC
27261 until Time: 2:00 PM, Day: Wednesday, Date: September 16, 2026. This is not
a public opening.
2. Question and Response Period:
Questions concerning this bid are due in writing via email by: September 2, 2026 by
12:00 PM to the attention of Greg Parret at greg.parret@highpointnc.gov
An addendum to address questions will be issued on or before September 4, 2026.
3. Bidding Requirements and Conditions:
A. The entire bound bid document shall be submitted and placed in a sealed
envelope and addressed to the Buyer for the City of High Point. The envelope
shall show the name and address of the Bidder, the name of the contract for
which the bid is being submitted, the bid number, the contract number, and the
time and date of the bid opening in order to guard against premature opening.
B. All hand-carried bids may be delivered prior to the bid due date to the City of High
Point Purchasing Office located in the City Municipal Operations Center,
Warehouse Building at 816 E Green Drive, High Point, North Carolina prior to the
date and time scheduled for the bid opening as so advertised.
C. Bidders who mail their Proposal shall address them as follows.
Bid 4001-091626
High Point Transit System Sewer
Line CIPP Rehabilitation
City of High Point Purchasing
Division
816 East Green Drive High Point,
North Carolina 27260
A mailed bid will be considered only if received prior to the date and time
scheduled for the bid opening as so advertised.
D. All pages bound within this Bid Document are necessary parts
thereof and shall not be detached, taken apart or altered.
4

E. The attachment of any additional terms and conditions by any
vendor or bidder is expressly rejected here and shall not be
incorporated into the bid. Attachment of any additional terms
and conditions may be grounds for rejection of the bid by the
City.
F. The City of High Point may consider any Bid not prepared and
submitted in accordance with the provisions herein
nonresponsive.
4. Preparation of Bids:
A. Bids shall meet the following requirements:
1) The itemized proposal provided by the City (Yellow Pages) shall be used and
not taken apart or altered. The bid shall be submitted on the same
proposal forms that have been furnished to the bidder by the City.
2) All entries including signatures shall be written in black ink.
3) The Bidder shall submit a unit or lump sum price for each item listed in the
itemized proposal forms.
4) In case of lump sum items, the price shall be written in figures in the Amount
Bid column in the itemized proposal.
5) The total amount bid shall be written in figures in the proper place in the
itemized proposal. The total amount bid shall be determined by adding the
amounts bid for each item.
6) Changes in any entry shall be made by marking a single line through the
incorrect entry in black ink and making the correct entry adjacent thereto in
black ink. A representative of the Bidder shall initial the change in black ink.
7) The following forms shall be filled out and executed within the bound
bid document when the bid is submitted.
a. Bidder Information Form
b. Proposal/Bid Form (Tab-C, Yellow)
c. Addendum(s) must be acknowledged
d. Other: All Items in Tab-D and Tab-E
5. Power of Attorney:
The Attorney-in-fact who signs Bid Bonds or Contract Bonds must file with each Bond a
certified and effectively dated copy of their Power of Attorney.
5

6. Withdrawal of Bids:
No bid may be withdrawn for a period of sixty (60) days from the actual date of the bid
opening.
7. Award and Execution of Contract:
The contract will be awarded to the lowest responsible, responsive bidder meeting
specifications unless otherwise specified in the Project Special Provision section.
8. Rejection of Bids:
The City reserves the right to reject any and all Bids, as may in the judgment of the City,
serve its best interest, and the City further reserves the right to waive irregularities and
informalities in any Bid submitted.
9. Sales Tax:
State and County sales taxes shall NOT be included in the Bid prices on any materials to
be used in this contract. The Contractor will be reimbursed for sales taxes in addition to
the prices bid upon submission of a certified statement showing the materials
purchased, invoice number, name of vendor, dates of purchases, copy of invoices, and
amount of tax paid. The certified statement must be signed by a corporate officer and
notarized. Forms for applying for sales tax reimbursement will be provided to the
Contractor by the City of High Point.
Sales tax will be reimbursed only on items that are annexed to, affixed to, or in some
manner have become a part of the building or structure being erected, altered or
repaired. (Any products purchased internationally shall include sales tax since those
taxes will not be recoverable by the City.)
10. Accessibility:
The meeting facilities of the City of High Point are accessible to individuals with
disabilities. If special accommodations are required, call (336) 883-3298, TDD (336)
883-8517, or the North Carolina Relay System (TDD 1 (800) 735-2962).
11. Bid Results:
Bid Tabulations will be posted at https://www.highpointnc.gov/Bids.aspx.
Verbal requests for unofficial, apparent low Bidder results of open market Bid
information will be available once the award has been made for this bid. Bid results will
be posted on the City of High Point website at https://www.highpointnc.gov/Bids.aspx
6

CONSTRUCTION AGREEMENT
City of High Point Bid Number 4001-091626
High Point Transit System Sewer Line CIPP Rehabilitation
THIS AGREEMENT ("Agreement") is entered into as of the day of ,
, by and between the CITY OF HIGH POINT, a North Carolina municipal corporation with
a principal place of business of 211 South Hamilton Street, High Point, North Carolina 27260
("City"), and , a corporation with a principal
place of bSusiness of ("Contractor").
A
The CitMy and the Contractor, for the consideration stated herein, mutually agree as follows:
P
1. THLE PROJECT. The Project is City of High Point Bid Number 4001-091626.
E
The Project is generally described as the High Point Transit System Sewer Line CIPP
Rehabilitation C
O
2. THE CONTRANCT DOCUMENTS. The Contract Documents are:
a. This AgreemTent.
b. Addendum NoRs. through (if applicable)
A
c. The Project's Drawings/Plans. (Tab - A)
C
d. The Project Special Provisions. (Tab - A)
T
e. The Construction Documents Project Manual. (Tab - A)
f. Modified EJCDC(R) C-700 -Standard General Conditions of the Construction
D
Contract (the "EJCDC General Conditions"). (Tab - B)
O
g. The Contractor's Itemized Proposal Form. (Tab - C)
h. The Contractor's executed PaymenNt Bond.
i. The Contractor's executed PerformancOe Bond.
j. City of High Point Construction Project DTispute Resolution Process.
k. Bid Documents executed by the Contractor . E(Tab - D)
l. The Contractor's Acknowledgement of FTA ClaXuses, Requirements (Tab - E)
E
C
U
3. THE WORK. The Work is defined in the Contract DocumentTs. The Work also
E
includes all additional services reasonably implied or inferred from the Contract Documents or
customarily provided in the performance of work similar to that called for by the Contract
Documents.
4. CONTRACTOR'S PERFORMANCE OF THE WORK. The Contractor shall
perform the Work in a timely fashion in accordance with the requirements of the Contract
Documents. The Contractor shall be solely responsible for providing all labor and materials
necessary to perform the Work in a timely fashion.
5. CONTRACTOR'S COMPENSATION. The City will pay the Contractor the
lump sum of $ for final completion of the Work (the "Contract Price"). If a portion
of the Contract Price will be based upon unit prices for aspects of the Work performed by the
7

Contractor, the City will pay the Contractor at the unit prices for these aspects of the Work set
forth in the Contractor's Itemized Proposal Form. When applicable, the unit prices set forth in the
Contractor's Itemized Proposal Form will govern the amounts paid to or deducted from the
Contractor for revisions in the Work.
6. PAYMENT BOND AND PERFORMANCE BOND. Prior to or at the time of
the execution of the Agreement, the Contractor will provide a payment bond and a performance
bond consistent with the statutory forms set forth in Chapter 44A of the North Carolina General
Statutes (see N.C. Gen. Stat. 44A-33) and the forms set forth in the Contract Documents. The
payment bond and the performance bond are required to ensure the Contractor's full and proper
performance of the Work and the Contractor's full and prompt payment of all subcontractors and
suppliers providing labor or materials relating to the Work. The surety on the payment bond and
the performance bond, by providing these bonds, agrees to be bound by the terms of the Agreement,
S
and agrees to perform any action and make any payment required under the Agreement that the
A
Contractor fails to perform or make.
M
P
7. REVISION OF QUANTITIES.
L
E
a. Ci ty's Revision of Quantities. If the Contractor is to be compensated under
C
the AgOreement for any portion of the Work on a per unit basis for the total
quantities of items listed in the Contractor's Itemized Proposal Form fully
N
completed bTy the Contractor, the City, by providing written notice to the
Contractor, mRay increase or decrease quantities of items to be provided by
the Contractor unAder the Agreement by as much as fifty percent (50%) of
the total Contract PCrice. The quantities may be revised by the City by an
additional fifty percenTt (50%) with the Contractor's approval.
-
b. Compensation for Revised DQuantities. The Contractor's compensation for
any revisions of contract quantOities pursuant to this Paragraph will be at the
unit prices in the Contractor's Item Nized Proposal Form.
O
c. Effect of Revised Quantities Upon CTontract Completion Date. Any
extension of the Contract Completion Date (see Paragraph 9) relating to a
E
revision of quantities pursuant to this Paragraph will be agreed upon in
X
writing by the City and the Contractor. If no agEreement is reached in this
regard between the City and the Contractor, the CoCntract Completion Date
will be revised on a proportional basis consistent witUh the revision to the
overall Contract Price arising from the revision in quantitTies.
E
8. ADDITIONAL CHANGES TO THE WORK.
a. Changes to the Work by the City. In addition to the potential revision of
contract quantities (see Paragraph 7), the City, by providing written notice
to the Contractor, may require other changes to the Work within the general
scope of the Work. The effect of such changes on the Contract Price and on
the Contract Completion Date shall be agreed upon by the parties or
equitably adjusted.
b. Changes to the Work Requested by the Contractor. The Contractor, by
providing written notice to the City, may request changes to the Work
8

within the general scope of the Work, provided that such requested changes
do not negatively affect the quality or quantity of the Work. If the City
agrees to implement a change requested by the Contractor, the effect of the
change on the Contract Price or the Contract Completion Date will be agreed
upon by the parties and/or equitably adjusted.
9. THE CONTRACT COMPLETION DATE.
a. Time of the Essence. Time is of the essence in the full completion of the
Work and the final completion of the Work.
b. Days to Complete the Work. Projects must be completed by 30 calendar
days of notice to proceed (if applicable).
S
A
c. The Contract Completion Date. The date by which the Contractor must
M
achieve final completion of the Work is "the Contract Completion Date."
P
L
d. EFull Completion of the Work. The phrase "full completion of the Work"
me ans the point at which the City receives full beneficial use and occupancy
C
of the OWork as reasonably determined by the Architect/Engineer.
N
e. Final CompTletion of the Work. The phrase "final completion of the Work"
means the poRint at which all aspects of the Work have been finally
completed. A
C
10. LIQUIDATED DAMAGES.T
-
a. Basis for and Amount of LiqDuidated Damages. A delay by the Contractor
O
in achieving final completion of the Work by the Contract Completion Date
will result in damages to the Cit yN, including, but not limited to, public
inconvenience, obstruction in trafficO, interference with business, lost
revenue, and increased design professionTal, inspection, and administration
costs. In light of the difficulty of making a precise determination of such
E
damages, the City and the Contractor agree that the sum of Five Hundred
X
($500) per calendar day will be charged against tEhe Contractor, not as a
penalty, but as liquidated damages, for each calendaCr day between the
Contract Completion Date and the date upon which CoUntractor achieves
final completion of the Work. This sum represents a reasoTnable estimate of
E
the amount of damages to potentially be suffered by the City each day if
final completion of the Work is not achieved by the Contract Completion
Date.
b. Accrual of Liquidated Damages. Liquidated damages will continue to
accrue until final completion of the Work is achieved, even if it becomes
necessary for the City without the Contractor's involvement to take actions
necessary to achieve final completion of the Work.
c. Reasonableness of Liquidated Damages. Contractor acknowledges that the
amount of liquidated damages set forth in this Paragraph is a reasonable
9

projection of the damages to be suffered by the City in the event that final
completion of the Work is not achieved by the Contract Completion Date.
d. Contractor's Knowledge of Liquidated Damages Provision before Bid
Submission. Contractor further acknowledges that Contractor was aware of
and considered this liquidated damages provision and the need to achieve
final completion of the Work by the Contract Completion Date in preparing
and submitting its bid for the Work and in entering into the Agreement to
perform the Work.
11. EXTENSIONS OF THE CONTRACT COMPLETION DATE.
a. Basis for Extension Request. The Contractor may request extensions of the
S
Contract Completion Date based upon delays to the critical path of the Work
A
caused by events that could not have reasonably been anticipated by the
M
Contractor and which are totally beyond the Contractor's control.
P
L
Ei. The occurrence of a number of adverse weather days on a monthly
basis equal to the average number of adverse weather days for the
C
Omonth at issue in the vicinity of the Work (based on no greater an
area than zip code) during the previous five (5) years as shown by
N
dataT accumulated by a nationally recognized weather monitoring
and reRcordkeeping service shall be reasonably anticipated by the
ContractoAr.
C
ii. Any adverse wTeather days claimed by the Contractor must be
beyond the numb-er of reasonably anticipated weather days as set
forth above and musDt actually delay the critical path of the Work.
O
iii. The need to order materia lNs, retain subcontractors, and take other
actions sufficiently in advanceO of when materials or subcontractors
are required to perform the WorkT in a timely fashion and to achieve
final completion of the Work by the Contract Completion Date shall
E
be reasonably anticipated by the Contractor.
X
E
b. Timing of Extension Request for Non-Weather-ReClated Reasons. Except
for weather-related requests, the Contractor must subUmit a request for an
extension of the Contract Completion Date in Twriting to the
Architect/Engineer within five (5) calendar days of the ocEcurrence of the
event upon which the request for an extension is based.
c. Content of Extension Request for Non-Weather- Related Reasons. A written
notice from the Contractor seeking an extension of the Contract Completion
Date for a non-weather-related event must:
i. Identify the event at issue.
ii. Set forth the length of the extension of the Contract Completion
Date sought by the Contractor.
10

This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...Transit TNC Supplemental Services Event: 12484-0 Type: OTHER SERVICES Open Date: 08/31/2026 Close ...

City of Greensboro

Bid Due: 9/18/2026

...Bid Number: RFQ2738 Bid Title: Design-Build for Transit Facility Upfit Projects Category: Formal... ...

City of Winston-Salem

Bid Due: 10/07/2026

...Solicitation Number: 281-RFQ2738 Project Title: Design-Build for Transit Facility Upfit Projects... Description: Introduce ...

State Government of North Carolina

Bid Due: 10/07/2026

...Bid Number: RFQ2770 Bid Title: RFQ for Progressive Design-Build Services for the WSTA ...

City of Winston-Salem

Bid Due: 10/13/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.