DEMOLITION OF 4243 INN SOUTH AVENUE

Location: Alabama
Posted: Feb 19, 2026
Due: Feb 26, 2026
Agency: City of Montgomery
Type of Government: State & Local
Category:
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.


Project ID:

Title: DEMOLITION OF 4243 INN SOUTH AVENUE

Addenda: 5

Release Date: 1/16/2026

Due Date: 2/26/2026

Follow
DEMOLITION OF 4243 INN SOUTH AVENUE
Last updated by Addendum #5 on Feb 20, 2026 3:06 AM See what changed
Procurement
Project ID: RAA PROJECT#25-010
Release Date: Friday, January 16, 2026
· Due Date: Thursday, February 26, 2026 2:30pm
Posted Thursday, February 19, 2026 7:51am
All dates & times in Central Time
Draft Response Events RSVP No Bid6 days, 18 hours, 52 minutes


Post Information

Posted At:Thu, Feb 19, 2026 7:51 AM
Sealed Bid Process:Yes (Bids Sealed / Pricing Sealed)
Private Bid:No
Overview


Summary

The work includes the complete demolition and removal of the existing two-story, approximately 42,000-square-foot commercial hotel building located at 4243 Inn South Avenue, Montgomery, Alabama, including all architectural, structural, mechanical, plumbing, and electrical systems. The contractor shall dismantle and properly dispose of all building components, finishes, and equipment; remove the roof, walls, windows, doors, floors, foundations, and any canopies; and extract all interior systems, including HVAC units, ductwork, piping, insulation, water heaters, plumbing fixtures, fire sprinkler systems, and electrical panels and conduits. Existing utility connections—including water, sewer, gas, and fire service lines—shall be disconnected, capped at the points indicated, and coordinated with the appropriate utility providers. Any pool on site shall be infilled and compacted to 98% density, and concrete slabs or sidewalks affected by demolition shall be removed, backfilled, and graded to facilitate mowing and positive drainage without blocking existing storm systems. The contractor shall clear all landscaping slated for removal, install and maintain erosion and sediment control measures per ALDOT specifications, and keep the site free of accumulated debris. All materials designated for salvage by the Owner shall be turned over as directed; otherwise, all demolished materials shall be legally disposed of in an EPA-approved landfill. The contractor shall secure and maintain all required permits, bonds, and clearances from applicable agencies, comply with national, state, and local building codes, and protect adjacent utilities, site elements, and remaining improvements throughout the duration of the work.



Timeline

Release Project Date:
January 16, 2026
Pre-Proposal Meeting (Mandatory):
February 12, 2026, 11:30am
The mandatory pre-pre-bid meeting will be held on February 12, 2026 at 10:45 a.m. at 25 Washington Avenue, Montgomery, AL 36104, 2ND Floor, Conference Room B. This meeting will include discussion of the project, applicable federal grant requirements, compliance obligations, and specific requirements and documentation necessary to submit a responsive bid.
Question Submission Deadline:
February 13, 2026, 10:00am
Question Response Deadline:
February 16, 2026, 10:00am
Response Submission Deadline:
February 26, 2026, 2:30pm
25 Washington Avenue, Montgomery, AL 36104, 1St Floor
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL
* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.