| Location: | Massachusetts |
|---|---|
| Posted: | Apr 10, 2025 |
| Due: | May 8, 2025 |
| Agency: | Town of Barnstable Invitation |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-IFB-063 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes, but is not limited to abrasive sand blasting and painting the exterior and interior of the Mary Dunn Drinking Water Storage Tank #1 (excluding the aluminum roof), pit filling, exterior caulking, removing and replacing the overflow screen, replacing the existing vent, security modifications to the existing pressure relief vent, installing a safety climb cable system for the existing ladder, coordination with Hyannis Water System and Veolia to empty water storage tank for rehabilitation activities, disinfection of the rehabilitated water storage tank, and conducting water sampling prior to the tank's return to service.

With GovernmentContracts, you can:
...be in full compliance with NPDES Permit requirements of the USEPA, the Safe ...
Charlton town
Bid Due: 7/07/2026
...with MassDEP's New Source Approval Process, MassDEP Drinking Water Regulations 310 CMR 22.00... ...
DEPT OF DEFENSE
Bid Due: 7/03/2026