| Location: | Delaware |
|---|---|
| Posted: | Apr 9, 2025 |
| Due: | Apr 18, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | FA449725R0012 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
4/9/2025 - Q&A was added to the list of attachemnts.
The project consists of providing all labor, materials and equipment IAW SOW dated 3 Aug 2024 necessary to:
A. Crack seal 30,000 LF of asphalt pavement
B. Provide and install 4146 LF preformed elastomeric joint seal
C. Repair defective manhole structures/covers
D. Excavate, as necessary, to support other repair tasks.
E. Repair 1000 SF-IN of concrete spalls
F. Pave with 2 inches of FAA Mix using up to 5 Tons FAA Mix (PG 76-22 binder).
G. Reseed areas disturbed by earthwork excavation.
Disclosure of magnitude: Between $250,000 and $500,000
| Mar 20, 2025 | [Solicitation (Original)] FY 25 Airfield Preventative Maintenance |
| Mar 21, 2025 | [Solicitation (Updated)] FY 25 Airfield Preventative Maintenance |
| Apr 17, 2025 | [Solicitation (Updated)] FY 25 Airfield Preventative Maintenance |
| Apr 18, 2025 | [Solicitation (Updated)] FY 25 Airfield Preventative Maintenance |

With GovernmentContracts, you can:
...construction, earthwork and grading, stormwater management and drainage systems, airfield lighting... necessary for ...
Sussex County
Bid Due: 6/15/2026
...construction, earthwork and grading, stormwater management and drainage systems, airfield lighting... necessary for ...
Sussex County
Bid Due: 6/16/2026