| Location: | Connecticut |
|---|---|
| Posted: | Mar 24, 2026 |
| Due: | Apr 21, 2026 |
| Agency: | State Government of Connecticut |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB No. 2026-015 |
| Publication URL: | To access bid details, please log in. |
Sanitary Sewer Replacement - BDL
Project includes: The replacement of an existing failing 8-inch clay sewer pipe. Work includes removal of the existing pipe and associated manholes, followed by abandonment of the old line using Controlled Low-Strength Material (CLSM). A new 8-inch sewer line-approximately 1,060 linear feet in length-will be installed along the existing airport fence line. Construction activities include trenchless installation beneath the Genesee & Wyoming Railroad, concrete-encased pipe installation beneath a future Taxiway, and the placement of three new manholes and two doghouse structures to connect to existing infrastructure. Site restoration and environmental protection measures are incorporated into the project, including erosion and sedimentation controls, trench pavement restoration, limited pavement marking, and loaming and seeding of disturbed areas. Traffic control measures will be implemented throughout the duration of the work.
Kevin Lynch Connecticut Airport Authority Windsor Locks CT, 06096 United States Tel: Fax: procurement@ctairports.org

With GovernmentContracts, you can:
...Number 8665 Title Trumpet Brook Sewer Relocation Available Date 7/9/2026 4:30 PM Clarification..., ...
City of Waterbury
Bid Due: 8/06/2026
...Sanitary Sewer Evaluation Study The City of Bristol Water and Sewer Department is ...
State Government of Connecticut
Bid Due: 8/07/2026
...Bid Title: Sewer-Storm Manhole Covers, Frames and Risers RFP Category: Town of Enfield, ...
Town of Enfield
Bid Due: 8/11/2026
...Bid/Rfp Number Description Due By Bid 27-181T Sewer Pump Station 10 Force Main ...
Town of Westport
Bid Due: 8/13/2026