| Location: | Florida |
|---|---|
| Posted: | Apr 20, 2026 |
| Due: | May 21, 2026 |
| Agency: | Toho Water Authority |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | IFB-26-026 |
| Publication URL: | To access bid details, please log in. |
Project Description: The Toho Water Authority Lift Station K208, located in Kissimmee, requires the replacement of its existing control panel due to advanced corrosion and deterioration.
It is critical that the new control panel be designed, manufactured, and delivered in strict accordance with the specified technical requirements to ensure operational reliability and system compatibility. Given the urgency of this control panel replacement, both cost and delivery schedule will be key factors in the evaluation and award of this solicitation

With GovernmentContracts, you can:
...Follow Twenty-One Access-Control Door Panels and Enclosures and LenelS2 Onguard System Integration..., testing, ...
DEPT OF DEFENSE
Bid Due: 11/12/2026
...Project: Lift Station - B012 & Lift Station - B013, Control Panel, Floats, ...
Toho Water Authority
Bid Due: 12/10/2026
...of the existing lift station property, relocating the existing Smith & Loveless pumps ...
City of DeLand
Bid Due: 11/18/2026
...electrical work and control panels meet code requirements. * Coordinate with the Orlando ...
Orlando Utilities Commission
Bid Due: 11/09/2026