| Location: | Massachusetts |
|---|---|
| Posted: | Apr 10, 2025 |
| Due: | May 8, 2025 |
| Agency: | Town of Barnstable |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | FY25-IFB-063 |
| Publication URL: | To access bid details, please log in. |
Project Description: The work to be performed under this contract includes, but is not limited to abrasive sand blasting and painting the exterior and interior of the Mary Dunn Drinking Water Storage Tank #1 (excluding the aluminum roof), pit filling, exterior caulking, removing and replacing the overflow screen, replacing the existing vent, security modifications to the existing pressure relief vent, installing a safety climb cable system for the existing ladder, coordination with Hyannis Water System and Veolia to empty water storage tank for rehabilitation activities, disinfection of the rehabilitated water storage tank, and conducting water sampling prior to the tank's return to service.

With GovernmentContracts, you can:
...Resilient Flooring $1,230,000 Interior Painting $700,200 Fire Protection $190,750 Plumbing $3,500,000... comprised of ...
City of Boston
Bid Due: 9/30/2026
...Interior Painting $700,200 Fire Protection $190,750 Plumbing $2,401,020 HVAC $6,725,100 Electrical... and brick/block ...
City of Boston
Bid Due: 9/30/2026
...Interior Painting $700,200 Fire Protection $190,750 Plumbing $2,401,020 HVAC $6,725,100 Electrical... and brick/block ...
City of Boston
Bid Due: 9/30/2026