| Location: | North Carolina |
|---|---|
| Posted: | Aug 21, 2026 |
| Due: | Oct 9, 2026 |
| Agency: | State Government of North Carolina |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 600RFLOI 2055 MTP AND CMP UPDATE |
| Publication URL: | To access bid details, please log in. |
| Solicitation Number: | 600RFLOI 2055 MTP AND CMP UPDATE |
| Project Title: | RFLOI FAMPO 2055 MTP AND CMP UPDATE |
| Description: | FAMPO is accepting proposals for the services of a firm/team to complete the 2055 Metropolitan Transportation Plan (MTP) and Congestion Management Process (CMP). Interested firms should respond by 10/09/2026. The complete RFLOI, along with the detailed scope of work, is attached. |
| Opening Date: | 10/9/2026 5:00 PM |
| Posted Date: | 8/21/2026 |
| Status: | Open |
| Department: | COUNTY OF CUMBERLAND |
|
Solicitation Number
*
600RFLOI 2055 MTP AND CMP UPDATE
|
Department
COUNTY OF CUMBERLAND
|
Status Reason
Open
|
|
|
Opening Date
2026-10-09T17:00:00.0000000
|
Posted Date
*
2026-08-21T14:43:36.0000000Z
|
Primary Commodity Code
Design Services
|
|
|
Mandatory Conference/Site Visit
—
—
|
Special Instructions
—
|
Solicitation Type
*
RFP
|
|
|
Owner
Jessica Hullender
|
|||
|
Description
FAMPO is accepting proposals for the services of a firm/team to complete the 2055 Metropolitan Transportation Plan (MTP) and Congestion Management Process (CMP). Interested firms should respond by 10/09/2026. The complete RFLOI, along with the detailed scope of work, is attached.
|
|||
Version: 2023.10.26 MTM
Advertised: 08/21/2026
Cumberland County, Fayetteville Area MPO (FAMPO)
REQUEST for LETTERS of INTEREST (RFLOI)
Fayetteville Area Metropolitan Planning Organization (FAMPO)
2055 Metropolitan Transportation Plan (MTP)
And
Congestion Management Process (CMP) Updates
TITLE: FAMPO 2055 MTP and CMP Update
ISSUE DATE: 8/21/2026
SUBMITTAL DEADLINE: 10/09/2026
ISSUING AGENCY: Cumberland County / FAMPO
SYNOPSIS
SUBCONSULTANTS ARE PERMITTED UNDER THIS CONTRACT.
This contract shall be partially reimbursed with Federal-aid funding through the North Carolina
Department of Transportation (hereinafter referred to as the Department). The solicitation, selection,
and negotiation of a contract shall be conducted in accordance with all Department requirements and
guidelines.
The primary and/or subconsultant firm(s) shall be pre-qualified by the Department to perform ANY
COMBINATION of NCDOT Discipline Codes listed below to accomplish the attached scope of work for
Cumberland County / FAMPO.
Transportation Planning (Any combination of Discipline Codes)
* 00141 - Multimodal Transportation Planning
* 00171 - Public Involvement
* 00261 - Long Range Transportation Planning
* 00315 - Municipal & Regional Planning Studies
* 00363 - Travel Demand Model Application
WORK CODES for each primary and/or subconsultant firm(s) (if Subconsultants are allowed under this
RFLOI) SHALL be listed on the respective RS-2 FORMS (see section 'SUBMISSION ORGANIZATION AND
INFORMATION REQUIREMENTS').
This RFLOI is to solicit responses (LETTERS of INTEREST, or LOIs) from qualified firms to provide professional
consulting services to:
Complete an update of the FAMPO 2055 Metropolitan Transportation Plan (MTP) and Congestion
Management Process (CMP).
Electronic LOIs should be submitted in .pdf format
LOIs SHALL be received ELECTRONICALLY no later than 5:00PM, 10/09/2026.
The address for electronic deliveries is: hgraham@cumberlandcountync.gov
LOIs received after this deadline will not be considered.
1
Version: 2023.10.26 MTM
Except as provided below any firm wishing to be considered must be properly registered with the Office of the
Secretary of State and with the North Carolina Board of Examiners for Engineers and Surveyors. Any firm
proposing to use corporate subsidiaries or subcontractors must include a statement that these companies are
properly registered with the North Carolina Board of Examiners for Engineers and Surveyors and/or the NC
Board for Licensing of Geologists. The Engineers performing the work and in responsible charge of the work
must be registered Professional Engineers in the State of North Carolina and must have a good ethical and
professional standing. It will be the responsibility of the selected private firm to verify the registration of any
corporate subsidiary or subcontractor prior to submitting a Letter of Interest. Firms which are not providing
engineering services need not be registered with the North Carolina Board of Examiners for Engineers and
Surveyors. Some of the services being solicited may not require a license. It is the responsibility of each firm to
adhere to all laws of the State of North Carolina.
The firm must have the financial ability to undertake the work and assume the liability. The selected firm(s) will
be required to furnish proof of Professional Liability insurance coverage in the minimum amount of
$1,000,000.00. The firm(s) must have an adequate accounting system to identify costs chargeable to the project.
SCOPE OF WORK
Cumberland County / FAMPO is soliciting proposals for the services of a firm/team for the following contract
scope of work:
* Complete the FAMPO 2055 Metropolitan Transportation Plan (MTP) update according to all
applicable Federal and State regulations.
* Complete the FAMPO Congestion Management Process (CMP) update according to all
applicable Federal and State regulations.
* Detailed Scope of Work is included as an attachment to this RFLOI (Attachment A).
PROPOSED CONTRACT TIME:
18 to 24 Months, with option to renew if needed, OR Until December 1, 2028.
PROPOSED CONTRACT PAYMENT TYPE:
LUMP SUM - THIS PROJECT HAS A BUDGET OF $500,000 IN THE FY27 UPWP.
SUBMITTAL REQUIREMENTS
All LOIs are limited to TWENTY FIVE (25) pages (Cover letter, resumes, and RS-2 forms are not included in
the page count), and shall be typed on 8-1/2" x 11" sheets, single-spaced, one-sided.
Fold out pages are not allowed. In order to reduce costs and to facilitate recycling; binders, dividers, tabs,
etc. are prohibited. One staple in the upper left-hand corner is preferred.
LOIs containing more than TWENTY FIVE (25) pages will not be considered.
ONE Electronic Copy of the LOI should be submitted.
Firms submitting LOIs are encouraged to carefully check them for conformance to the requirements
stated above. If LOIs do not meet ALL of these requirements they will be disqualified. No exception will
be granted.
2
Version: 2023.10.26 MTM
SELECTION PROCESS
The following is a general description of the selection process:
* A Cumberland County/FAMPO Selection Committee will review all qualifying LOI submittals.
* For Limited Services Contracts (On-Call type contracts), the Cumberland County / FAMPO Selection
Committee MAY, at the Cumberland County's/FAMPO's discretion, choose any number of firms to
provide the services being solicited.
* For Project-Specific Contracts (non On-Call type contracts), the Selection Committee MAY, at
Cumberland County's/FAMPO's discretion, shortlist a minimum of three (3) firms to be interviewed. IF
APPLICABLE, dates of shortlisting and dates for interviews are shown in the section SUBMISSION
SCHEDULE AND KEY DATES at the end of this RFLOI.
* In order to be considered for selection, consultants must submit a complete response to this RFLOI prior
to the specified deadline. Failure to submit all information in a timely manner will result in disqualification.
TITLE VI NONDISCRIMINATION NOTIFICATION
The LGA in accordance with the provisions of Title VI of the Civil Rights Act of 1964 (78 Stat. 252, 42 US.C.
2000d to 2000d-4) and the Regulations, hereby notifies all RESPONDENTS that it will affirmatively ensure that
any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded
full and fair opportunity to submit LETTERS of INTEREST (LOIs) in response to this ADVERTISEMENT and will
not be discriminated against on the grounds of race, color, or national origin in consideration for an award.
SMALL PROFESSIONAL SERVICE FIRM (SPSF) PARTICIPATION
The Department encourages the use of Small Professional Services Firms (SPSF). Small businesses
determined to be eligible for participation in the SPSF program are those meeting size standards defined by
Small Business Administration (SBA) regulations, 13 CFR Part 121 in Sector 54 under the North American
Industrial Classification System (NAICS). The SPSF program is a race, ethnicity, and gender neutral program
designed to increase the availability of contracting opportunities for small businesses on federal, state or locally
funded contracts. SPSF participation is not contingent upon the funding source.
The Firm, at the time the Letter of Interest is submitted, shall submit a listing of all known SPSF firms that will
participate in the performance of the identified work. The participation shall be submitted on the Department's
Subconsultant Form RS-2. RS-2 forms may be accessed on the Department's website at NCDOT Connect
Guidelines & Forms.
The SPSF must be qualified with the Department to perform the work for which they are listed.
3
Version: 2023.10.26 MTM
PREQUALIFICATION
The Department maintains on file the qualifications and key personnel for each approved discipline, as well as
any required samples of work. Each year on the anniversary date of the company, the firm shall renew their
prequalified disciplines. If your firm has not renewed its application as required by your anniversary date or if
your firm is not currently prequalified, please submit an application to the Department prior to submittal of your
LOI. An application may be accessed on the Department's website at Prequalifying Private Consulting Firms -
- Learn how to become Prequalified as a Private Consulting Firm with NCDOT. Having this data on file with the
Department eliminates the need to resubmit this data with each letter of interest.
Professional Services Contracts are race and gender neutral and do not contain goals. However, the Respondent
is encouraged to give every opportunity to allow Disadvantaged, Minority-Owned and Women-Owned Business
Enterprises (DBE/MBE/WBE) subconsultant utilization on all LOIs, contracts and supplemental agreements. The
Firm, subconsultant and subfirm shall not discriminate on the basis of race, religion, color, national origin, age,
disability or sex in the performance of this contract.
DIRECTORY OF FIRMS AND DEPARTMENT ENDORSEMENT
Real-time information about firms doing business with the Department, and information regarding their
prequalifications and certifications, is available in the Directory of Transportation Firms. The Directory can be
accessed on the Department's website at Directory of Firms -- Complete listing of certified and prequalified firms.
The listing of an individual firm in the Department's directory shall not be construed as an endorsement of the
firm.
SUBMISSION ORGANIZATION AND INFORMATION REQUIREMENTS
The LOI should be addressed to Hank Graham, AICP, FAMPO Executive Director, and must include the
name, address, telephone number, and e-mail address of the prime consultant's contact person for this RFLOI.
Consultants interested in being considered must submit a Letter of Interest (LOI) electronically in PDF format,
not exceeding 25 pages (excluding the cover page and resumes). The LOI must include:
1. Cover Letter identifying the firm, primary contact, and subconsultants (if applicable).
2. Project Understanding and Approach - A concise description of the firm's understanding of the
purpose, local context, and key issues related to the scope of work.
3. Proposed Team and Key Personnel - Include a summary of relevant experience, staff availability, and
organizational chart.
4. Experience with Similar Projects - Highlight relevant projects that demonstrate experience with
Transportation Planning projects with NCDOT, MPO's, and local Governments in North Carolina
completed in the past five years.
5. Proposed Project Schedule - Indicate ability to meet the proposed timeline.
6. NCDOT Prequalification - Firms and subconsultants must be prequalified by NCDOT to perform the
required disciplines.
4
Version: 2023.10.26 MTM
SELECTION CRITERIA
All prequalified firms who submit responsive letters of interest by the posted deadline will be considered.
In selecting a firm/team, the selection committee will take into consideration qualification information including
such factors as:
1. 30% = Project Understanding and Approach
2. 30% = Relevant Experience and Past Performance
3. 20% = Key Staff Experience and Qualifications
4. 20% = Project Schedule and Availability
A Selection Committee composed of representatives from the FAMPO region and NCDOT will review and
score submissions. Top-ranked firms may be invited to participate in an interview prior to final selection.
Negotiations will be conducted with the highest-ranked firm(s). If a mutually acceptable contract cannot be
reached, FAMPO reserves the right to negotiate with the next-ranked firm(s).
After reviewing qualifications, if firms are equal on the evaluation review, then those qualified firms with proposed
SPSF participation will be given priority consideration.
5
Version: 2023.10.26 MTM
APPENDICES-
CONSULTANT CERTIFICATION Form RS-2
Completed Form RS-2 forms SHALL be submitted with the firm's letter of interest. This section
is limited to the number of pages required to provide the requested information.
Submit Form RS-2 forms for the following:
* Prime Consultant firm
Prime Consultant Form RS-2 Rev 1/14/08; and
* ANY/ALL Subconsultant firms to be, or anticipated to be, utilized by your
firm.
Subconsultant Form RS-2 Rev 1/15/08.
In the event the firm has no subconsultant, it is required that this be
indicated on the Subconsultant Form RS-2 by entering the word "None"
or the number "ZERO" and signing the form.
Complete and sign each Form RS-2 (instructions are listed on the form).
The required forms are available on the Department's website at:
https://connect.ncdot.gov/business/consultants/Pages/Guidelines-Forms.aspx
Prime Consultant Form RS-2
Subconsultant Form RS-2
All submissions, correspondence, and questions concerning this RFLOI should be directed to Hank Graham,
AICP, FAMPO Executive Director, at hgraham@cumberlandcountync.gov.
SUBMISSION SCHEDULE AND KEY DATES
RFLOI Release - 08/21/2026
Deadline for Questions - 08/28/26
Issue Final Addendum (If needed) - 09/11/2026
Deadline for LOI Submission - 10/09/2026
Shortlist Announced* - Interviews - October 2026
Firm Selection and Notification ** - November 2026
Anticipated Notice to Proceed - December 2026
Deadline for Completed MTP and CMP - 11/01/2028
* Notification will ONLY be sent to shortlisted firms.
** Notification will ONLY be sent to selected firms.
6
Scope of Work for Consultant Services
Fayetteville Area Metropolitan Planning Organization (FAMPO)
Development of a Metropolitan Transportation Plan (MTP) and
Congestion Management Process (CMP)
Contents
Metropolitan Transportation Plan (MTP) .......................................................................... 1
Introduction ..................................................................................................................... 1
Project Objectives ........................................................................................................ 2
Scope of Work ................................................................................................................. 2
Task 1: Project Administration ...................................................................................... 2
Task 2: Public and Stakeholder Engagement .............................................................. 3
Task 3: Socioeconomic Data Projections and Model Utilization ................................... 6
Task 4: Plan Development ........................................................................................... 8
Task 5: Plan Documentation and Production ............................................................. 14
Task 6: MTP Checklist ............................................................................................... 15
Congestion Management Process ................................................................................ 16
Task M1. Congestion Management Process ............................................................. 16
Appendix 1. MTP Checklist ........................................................................................... 19
Metropolitan Transportation Plan (MTP)
Introduction
The Fayetteville Area Metropolitan Planning Organization (FAMPO) seeks consultant
support to prepare the 2055 Metropolitan Transportation Plan (MTP). The MTP will serve
as the federally-required, fiscally constrained long-range transportation plan for the MPO
planning area that complies with all applicable federal regulations. This plan will guide
coordinated, long-range transportation planning consistent with federal and NCDOT
requirements. The plan will address a minimum 20-year planning horizon and incorporate
both long-range and short-range multimodal strategies to meet current and future
transportation demand.
1
Project Objectives
* Develop a long-range transportation plan that meets federal and state
requirements.
* Engage stakeholders and the public throughout the planning process.
* Integrate land use, environmental, economic, safety, and other considerations.
* Produce all required documentation, data, and mapping products.
Scope of Work
Throughout this document, Code of Federal regulations are cited and summarized for
purposes of brevity within the document. The consultant is required to conduct the
process and provide deliverables that conform to the full text of all applicable regulations.
Task 1: Project Administration
a) Kick-Off Meeting
Upon receiving the Notice to Proceed and the approved, executed contract with
Cumberland County, the consultant team should schedule a project kick-off meeting with
the MPO and other key staff (as needed) to review the scope of work, the project
management plan, schedule, and to discuss key items for initiating the study. The kickoff
meeting can be a hybrid meeting, conducted both in-person and virtually, to be decided
in coordination with the consultant team and FAMPO.
b) Project Schedule and Work Plan
The Consultant will prepare a schedule and work plan for specific work tasks, interim and
final deliverables, and quality control reviews. The schedule and work plan will be
presented for discussion at the project kick-off meeting. Based on this discussion, the
Consultant will make revisions and submit a final project schedule and work plan. The
Consultant will revise the project schedule during plan development as needed to account
for changes in milestone scheduling, engagement, or deliverables. The draft and final
schedule and work plan shall incorporate adequate time for FAMPO review of draft project
deliverables.
The draft and final work plan shall describe the approach for the Consultant to provide
project information to support public and stakeholder engagement appropriate for the
intended audience. Materials shall follow the tone, formatting, and other content guides
established cooperatively by the Consultant and FAMPO. Delivery and review schedules
for materials shall incorporate FAMPO's procedures for making meeting materials
available electronically before, during, or after meetings and to facilitate printing for in-
person meetings.
2
c) Project Updates and Presentations
The Consultant will present updates to FAMPO's committees and advisory boards. The
Consultant will provide content when requested in support of any additional briefings
provided by FAMPO staff. The Consultant team should be prepared to participate in
public outreach efforts and FAMPO Board Meetings as needed, according to progress
milestones.
d) Progress Reports and Invoicing
The Consultant will prepare progress statements organized by task that provides a
bulleted list of recent activities. The progress statement will be included with a copy of
each invoice. For the first invoice, consultant will invoice from date of NTP to the last day
of the month that the NTP was issued. From then on, consultant shall invoice on a
monthly basis.
Task 1 Deliverables:
* Meeting Notes
* Project Schedule and Work Plan
* Presentation Materials
* Progress Reports
* Invoices
Task 2: Public and Stakeholder Engagement
a) Public Engagement Strategy
The Consultant will provide assistance to conduct the public involvement activities in
support of the development of the plans in accordance with 23 CFR 450.316 and
FAMPO's Public Participation and Title VI Plans.
The Consultant will develop a public engagement strategy for developing the MTP. The
strategy will outline major public involvement tasks to support the plans, roles and
responsibilities between the Consultant and FAMPO, and an accompanying schedule that
incorporates the plan's review and adoption timelines. The public engagement strategy
should incorporate the following elements, at minimum: public outreach goals and
objectives, identification of key stakeholders (consistent with the requirements for the
Steering Committee), schedule and milestones, identification of constraints to public
engagement, a detailed description of engagement activities including in-person and
digital outreach that appropriately engages under-represented groups or interests, and
MTP marketing materials such as social media posts, flyers, and website content.
The public engagement strategy should be developed expeditiously after the Project Kick-
Off meeting by the Consultant in collaboration with FAMPO. As part of the public
3
engagement strategy, the Consultant will coordinate with FAMPO to develop a map
package that identifies and accounts for Title VI and relevant demographic data to analyze
disparate impacts of the transportation planning process (further explored in Task 4. Plan
Documentation and Production).
Consultant shall ensure that the MTP's public engagement strategy addresses each of
the following, as applicable:
Per 23 CFR 450.324(k) and 23 CFR 450.316(a)(1)(iv), the MPO shall publish or
otherwise make readily available the MTP for public review, including (to the maximum
extent practicable) in electronically accessible formats and means, such as the World
Wide Web.
Per 23 CFR450.316(a)(1)(i), the MPO shall provide adequate public notice of public
participation activities and time for public review and comment at key decision points,
including a reasonable opportunity to comment on the proposed MTP.
Per 23 CFR 450.316(a)(1)(vii), While developing the MTP, the MPO shall seek out and
consider the needs of those traditionally underserved by existing transportation systems
such as low-income and minority households.
Per 23 CFR 450.316(a)(1)(vi) & 23 CFR 450.316(a)(2), document the MPO's
demonstrated explicit consideration of and response to public input received during
development of the MTP. If significant written and oral comments were received on the
draft MTP, Consultant shall provide a summary, analysis, and report on the disposition of
the comments as part of the final MTP.
Per 23 CFR 450.316(a)(1)(viii), the MPO will provide an additional opportunity for public
comment if the final metropolitan transportation plan differs significantly from the version
that was made available for public comment by the MPO and raises new material issues
that interested parties could not reasonably have foreseen from the public involvement
efforts.
Per 23 CFR 450.316(b), the MPO shall consult with agencies and officials responsible for
other planning activities within the MPO planning area that are affected by transportation
or coordinate its planning process (to the maximum extent practicable) with such planning
activities.
Per 23 CFR 450.316(c), if the MPO planning area includes Indian Tribal lands, the MPO
shall appropriately involve the Indian Tribal government(s) in the development of the MTP.
Per 23 CFR 450.316(d), if the MPO planning area includes Federal public lands, the MPO
shall appropriately involve Federal land management agencies in the development of the
MTP.
4

With GovernmentContracts, you can:
Follow Z2DA--FY27 NRM 558-24-160, Domestic Water, Chilled Water and Steam Piping (VA-26-00066009) Active
VETERANS AFFAIRS, DEPARTMENT OF
Bid Due: 12/09/2026
Solicitation Number: 354-UT27-12 Project Title: Request for Qualifications - Master Plan & Rerating
State Government of North Carolina
Bid Due: 11/18/2026
Solicitation Number: 322-MAINT092926 Project Title: RFB FOR PARKING LOT PATCHING, SEALCOATING, AND RESTRIPING
State Government of North Carolina
Bid Due: 12/10/2026
Solicitation Number: 274-HCD-FY27-6 Project Title: FY 2027-2028 Community Enhancement Grant Description: FY 2027-2028
State Government of North Carolina
Bid Due: 11/23/2026