| Location: | Washington |
|---|---|
| Posted: | Dec 16, 2025 |
| Due: | Jan 27, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-2014-0011 |
| Publication URL: | To access bid details, please log in. |
Project Description: Improvements to two existing submersible pump stations, including temporary erosion control measures, traffic control as necessary, bypass pumping; demolition and partial removal of the existing pump stations; installation of new pumps, controls, piping, valves, valve vault, electrical service modifications and installation; installation of backup generator, and equipment shelter; and site improvements including reinforced concrete surfacing.

With GovernmentContracts, you can:
...Contract I-90, EB 3 Miles E of North Bend - Emergency Seeding and ...
State Government of Washington
Bid Due: 8/12/2026
...restoration, erosion control, water management and traffic control. Public Works Publication Date...
State Government of Washington
Bid Due: 7/07/2027
..., channel reconstruction, streambed restoration, roadside restoration, erosion control, water management... and traffic ...
State Government of Washington
Bid Due: 12/23/2026
...systems, sewer forcemain, and electrical. The upland utility work includes temporary erosion... and ...
Sammamish Plateau Water
Bid Due: 7/29/2026