Project Description: Improvements to two existing submersible pump stations, including temporary erosion control measures, traffic control as necessary, bypass pumping; demolition and partial removal of the existing pump stations; installation of new pumps, controls, piping, valves, valve vault, electrical service modifications and installation; installation of backup generator, and equipment shelter; and site improvements including reinforced concrete surfacing.

With GovernmentContracts, you can:
...to) are: Marine Mammal Monitoring Pier Removal Concrete Debris Removal Reimbursement for Protected ...
Sammamish Plateau Water
Bid Due: 7/14/2026
...Requires constructing an eastbound acceleration lane consisting of removal and excavation of existing... ...
State Government of Washington
Bid Due: 7/15/2026
...Project ID: Title: Design Consultant - Chambers Creek Dam Removal and Estuary Bank ...
Pierce County
Bid Due: 6/24/2026
...Mammal Monitoring 2. Pier Removal 3. Concrete Debris Removal 4. Reimbursement for Protected ...
State Government of Washington
Bid Due: 7/14/2026