| Location: | Washington |
|---|---|
| Posted: | Dec 16, 2025 |
| Due: | Jan 27, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-2014-0011 |
| Publication URL: | To access bid details, please log in. |
Project Description: Improvements to two existing submersible pump stations, including temporary erosion control measures, traffic control as necessary, bypass pumping; demolition and partial removal of the existing pump stations; installation of new pumps, controls, piping, valves, valve vault, electrical service modifications and installation; installation of backup generator, and equipment shelter; and site improvements including reinforced concrete surfacing.

With GovernmentContracts, you can:
...curbs and gutters, drainage pond and ditches, erosion control, illumination system, permanent signing..., ...
State Government of Washington
Bid Due: 10/21/2026
..., ESC lead, erosion control and water pollution prevention, bark or wood chip ...
State Government of Washington
Bid Due: 9/23/2026
..., ESC lead, erosion control and water pollution prevention, bark or wood chip ...
State Government of Washington
Bid Due: 9/30/2026
...and restoration of a portion of Clear Creek, as well as a temporary ...
State Government of Washington
Bid Due: 11/04/2026