| Location: | Washington |
|---|---|
| Posted: | Dec 16, 2025 |
| Due: | Jan 27, 2026 |
| Agency: | Sammamish Plateau Water |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 26-2014-0011 |
| Publication URL: | To access bid details, please log in. |
Project Description: Improvements to two existing submersible pump stations, including temporary erosion control measures, traffic control as necessary, bypass pumping; demolition and partial removal of the existing pump stations; installation of new pumps, controls, piping, valves, valve vault, electrical service modifications and installation; installation of backup generator, and equipment shelter; and site improvements including reinforced concrete surfacing.

With GovernmentContracts, you can:
...System (HVAC, Lighting, Utilities, etc) Installation, Maintenance and Repair Services 928-30-Cooling..., Heating, and ...
State Government of Washington
Bid Due: 10/05/2026
...Bid Title: Shadow Mountain Water System Project (Water Main and Booster Pump Station) ...
County of Cowlitz
Bid Due: 9/28/2026
...scope would include the design and installation of a dry system. The work ...
Port of Seattle
Bid Due: 10/01/2026
...Bid Title: KNITTLE BOOSTER PUMP STATION Category: Public Works Projects Status: Open Description...: ...
City of Stanwood
Bid Due: 9/29/2026