| Location: | Florida |
|---|---|
| Posted: | Mar 20, 2026 |
| Due: | Apr 21, 2026 |
| Agency: | JEA |
| Type of Government: | State & Local |
| Category: |
|
| Publication URL: | To access bid details, please log in. |
JEA is seeking a qualified contractor to remove silt and organic material from Northside Generating Station’s discharge flume with clamshell dredging. The flume is a concrete structure, approximately 650 ft long, 45 ft wide and 30 ft deep. Over the last decade material from the river has been accumulating in the discharge basin, settling in the structure from the river water used for cooling. A hydrographic survey completed in December of 2024 estimates 10,264 cubic yards of material within the basin. JEA would like the level of material brought to the invert of the discharge pipe at elevation -28 ft to prevent damage to the support pilings. Removed material can disposed of in the gaps between the discharge basin and inlet flume.
USE THIS LINK TO ACCESS THIS SOLICITATION ON ZYCUS: https://zsn.zycus.com/guest/genericRegister/JEA074/iSource/1034811/
Pre-Bid Meeting and MANDATORY Site Visit: March 31, 2026, at 10:00 AM
Response Due Date: April 21, 2026

With GovernmentContracts, you can:
...Specifications 1412134647 Appendix A - 2015 Discharge Flume Hydrographic Survey 1412134647 Appendix B ...
JEA
Bid Due: 6/16/2026