| Location: | North Carolina |
|---|---|
| Posted: | Mar 27, 2025 |
| Due: | Apr 24, 2025 |
| Agency: | DEPT OF DEFENSE |
| Type of Government: | Federal |
| Category: |
|
| Solicitation No: | N4008525R2523 |
| Publication URL: | To access bid details, please log in. |
APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.
APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.
The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).
***Only the Design-Build (DB)/Design-Bid-Build (DBB), Indefinite Delivery/Indefinite Quantity (IDIQ), Multiple Award Construction Contract (MACC) for Large General Construction Projects in in Marine Corps Facilities, Primarily Camp Lejeune and Cherry Point, North Carolina, for contract numbers N4008520D0032/0033/0034/0035/0036 can provide a proposal in response to this project.***This project will design and construct a Parachute Maintenance Facility with a Paraloft, and a Supply Warehouse for the 2nd Radio Battalion at Camp Lejeune, North Carolina. Construction includes low-rise steel frames facilities with reinforced concrete masonry unit with reinforced masonry walls, brick veneer, reinforced concrete floors and standing seam metal roof. The Supply Warehouse includes administrative and support space, storage bays, secured storage, and shipping/receiving area. The Parachute Maintenance Facility includes a parachute washing area with drying tower, administrative and support space, training area, sewing and fabrication room, and parachute packing and storage areas. Building Architecture should be Georgian or Colonial revival in classification as defined by the BEAP (Base Exterior Architecture Plan) for Hadnot Point commensurate with facility importance. Special construction features include premium for compliance with Base Exterior Architectural Plan. This project will provide Anti-Terrorism/Force Protection (ATFP) features and comply with ATFP regulations, physical security mitigation in accordance with DOD Minimum Anti-Terrorism Standards for Buildings. Information systems will include basic telephone, computer network, fiber optic, security and fire alarm systems and infrastructure. Mechanical systems include heating, ventilation and air conditioning, water lines, plumbing and plumbing fixtures, fire protection systems and supply lines, sanitary sewer system, oil/water separators, and storm drainage piping and culverts. Built-in equipment includes storage racks, parachute-rigging system, parachute drying system, antenna support mast at roof, and fire pumps.

With GovernmentContracts, you can:
Title Main Commodity/Service Category Solicitation # Buyer Phone Submission Deadline Computer Services Computer
Lumberton Housing Authority
Bid Due: 6/02/2026
Citywide Sidewalk and Multimodal Projects - Phase 1 Closing date June 09, 2026,
City of Fayetteville
Bid Due: 6/09/2026
RFP #26-058 Library Book Courier Services RFP #26-058 Library Book Courier Services Due
Wake County
Bid Due: 6/02/2026
Solicitation Number: 274-WS-2017-14 Project Title: Pullen to Bain Reinforcing Main Description: 15300 LF
State Government of North Carolina
Bid Due: 6/11/2026