RFQ-Construction Manager at Risk Services-BOSC Pump Station & Forcemain (View Legal Notice)

Location: Ohio
Posted: Mar 5, 2026
Due: Apr 15, 2026
Agency: Allen County
Type of Government: State & Local
Category:
  • 43 - Pumps and Compressors
Publication URL: To access bid details, please log in.
  • RFQ-Construction Manager at Risk Services-BOSC Pump Station & Forcemain (View Legal Notice)
  • Attachment Preview

    Allen County Sanitary Engineering Department
    Request for Qualifications (RFQ)
    Construction Manager at Risk (CMAR) Services
    BOSC Pump Station & Forcemain
    February 26, 2026
    A. Project Information
    1. Project Name: Sanitary Engineering Department BOSC Pump Station & Forcemain
    2. Owner: Allen County Sanitary Engineer
    3. Address: NE quadrant of Bluelick Road and Cole Street
    4. Engineer: ms Consultants
    5. Estimated Construction Cost: $29,834,256.00
    6. Scope: This project includes construction of the new BOSC Pump Station and Forcemain
    on the northeast quadrant of the Bluelick Road and Cole Street intersection in Allen
    County, Ohio. The pump station is to be a suction lift pump station with a firm capacity of
    2.5 million gallons per day (MGD) at full build out. The project will also include design of
    dual forcemains. The first forcemain will begin as a 10-inch forcemain at the BOSC pump
    station (PS) and continue to the American Bath Plant where a portion of flow will split off,
    the forcemain will then continue as an 8-inch to the American II plant with its remaining
    flow. The second forcemain will be a 16-inch forcemain to convey flows from the Bosc PS
    to the existing 78” gravity sewer at the intersection of Woodward Avenue and Grand
    Avenue within the City of Lima, Ohio. The two forcemains will be approximately 20,100
    linear feet (LF) and 17,900 LF of forcemain, respectively.
    7. Schedule:
    RFQ Phase
    RFQ Advertised
    02/27/26
    SOQs Due
    03/13/26
    Short-listed Firms Notified
    03/18/26
    RFP Phase
    RFP Issued
    03/20/26
    Proposals Due
    04/15/26
    Interviews
    Week of 04/20/26
    CMAR Selection Announced
    04/27/26
    Construction Phase
    Estimated Construction Start Date
    Q4 2026
    Substantial Completion Date
    01/2028
    Final Completion Date
    06/2028
    8. Delivery Method
    BOSC PS & Forcemain
    Request for Qualifications
    1 of 9
    a. Allen County Sanitary Engineer (Owner) intends to contract for Construction
    Manager at Risk (CMAR) services as defined in Section 9.33 of the Ohio Revised Code
    (ORC) for the BOSC Pump Station and Forcemain Project.
    9. Procurement Process
    a. The Owner requests statements of qualifications (SOQ) from experienced CMAR
    firms to provide CMAR services associated with the Project. Using the evaluation
    criteria included in this RFQ, the Owner will review the responsive SOQs from CMAR
    firms (Respondents) to develop a list of Respondents qualified to receive the future
    request for proposal (RFP). The Owner will qualify no more than (3) Respondents to
    receive the RFP unless the Owner determines fewer than (3) Respondents are
    qualified.
    b. The RFP will include a technical and a pricing component. The Owner will evaluate
    the responsive proposals from Respondents and, considering technical and pricing
    information, will select the Respondent determined to provide the Owner the best
    value for the Project.
    B. CMAR Scope of Services
    1. General:
    a. CMAR Services
    i. CMAR services for the Project will include Preconstruction Services, Construction
    Services, and Postconstruction Services identified in this RFQ.
    b. Agreement
    i. The form of the agreement, general conditions, and other contract documents
    necessary for qualified Respondents to prepare responsive proposals will be
    included in the RFP.
    ii. The agreement and associated contract documents will include the contractual
    CMAR scope of services.
    2. Preconstruction Services:
    a. Participate in scheduled design meetings with the Owner and the Engineer to
    provide input on topics affecting the Project’s construction including materials of
    construction, construction costs, constructability, construction phasing, and
    construction sequencing.
    b. Participate in coordination meetings with the Owner, the Engineer, regulatory
    agencies, and utility companies as needed for securing approvals and permits
    necessary for the Project.
    c. Provide construction phasing and sequencing input to develop a design which can be
    constructed within the contracted duration.
    BOSC PS & Forcemain
    Request for Qualifications
    2 of 9
    d. Identify long lead time items and provide details to the Owner and the Engineer to
    begin procurement process, if applicable.
    e. Provide review comments at each design phase for design documents provided by
    the Engineer (30%, 60%, 90%, and 100%).
    f. Provide constructability and value engineering comments at each design phase for
    design documents provided by the Engineer (30%, 60%, 90%, and 100%).
    g. Provide construction cost estimates at each design phase for design documents
    provided by the Engineer (30%, 60%, and 90%).
    h. Develop bid packages including potential Subcontractor/Suppliers for each package.
    Develop prequalification criteria and prequalify Subcontractors, as applicable in
    accordance with Ohio laws and regulations.
    i. Establish a Guaranteed Maximum Price (GMP) using open book pricing based on
    construction cost estimates provided at each design phase.
    j. The CMAR firm should be prepared to provide a GMP at the 60% - 90% design level.
    3. Construction Services:
    a. Complete Final Bidding and award Subcontracts to successful bidders with the
    Owner’s input as allowed per ORC.
    b. Maintain a safe job site in accordance with all laws and regulations.
    c. Provide continuous coordination with the Owner, the Engineer, permitting and
    regulatory agencies, and additional parties.
    d. Hold and manage all construction-related contracts.
    e. Provide necessary bonds and insurance coverage per ORC and the contract
    documents.
    f. Provide wage rate documentation and reports per ORC and the contract documents.
    g. Provide supervision of and quality control over all construction-related activities in
    addition to and in coordination with inspections required by the contract
    documents.
    h. Procure or arrange procurement of all construction-related materials and
    equipment.
    i. Acquire and maintain all construction-related permits and address all construction-
    related permitting requirements.
    j. Schedule and manage all construction-related activities in coordination with the
    Owner’s operations and document construction progress in the form of project
    schedule.
    k. Attend monthly progress meetings, quality control meetings, and other meetings as
    needed.
    l. Provide temporary facilities and controls as required per the contract documents.
    m. Provide required training to Owner’s staff.
    BOSC PS & Forcemain
    Request for Qualifications
    3 of 9
    n. Provide start-up and commissioning.
    o. Provide closeout including record documents, approved shop drawings and
    submittals, special bonds, special guarantees, service agreements, final payment
    documentation, releases or waivers of liens and claims, releases from agreements,
    spare parts, and final cleaning.
    4. Post-Construction Services
    a. Provide warranty service and close-out in accordance with the contract documents
    and the executed warranties.
    b. Transfer all material and equipment vendor warranties and guarantees to the
    Owner.
    C. Communication during RFQ Process
    1. Communications with Owner
    a. Except during scheduled site visits, Respondents should not discuss any information
    directly relating to this procurement process with any Owner personnel or staff.
    2. Site Visits
    a. Respondents may schedule visits to the project site by contacting:
    i. Brad Niemeyer, P.E.
    Allen County Sanitary Engineer
    419-996-4670
    bniemeyer@allencountyohio.com
    3. Communication with Engineer
    a. Respondents should direct all questions in writing to:
    i. Joshua Martin, P.E.
    Project Manager
    ms Consultants
    614-898-7100
    jmartin@msconsultants.com
    4. Addenda
    a. If necessary, the Engineer will provide interpretations, supplemental instructions,
    clarifications, or modifications to the RFQ documents in the form of written addenda
    which will become part of the RFQ documents. The Engineer will issue addenda to
    all Respondents who obtained the RFQ from the Engineer no later than (5) days prior
    to the SOQ due date.
    b. Respondents are required to acknowledge the receipt of each addendum in its
    transmittal or cover letter which is to be included with the Respondent’s SOQ.
    Failure of any Respondent to receive any addendum does not relieve such
    Respondent from any obligation under its SOQ as submitted.
    BOSC PS & Forcemain
    Request for Qualifications
    4 of 9
    D. SOQ Submittal Instructions
    1. Submittal Deadline
    a. 2:00 p.m. local time on 03/13/2026.
    2. Delivery Format
    a. Respondents shall submit the required quantity of submittals in a sealed box. The
    outside of the box shall include the Respondent’s name, the respondent’s address,
    the project name, and the note “STATEMENT OF QUALIFICATIONS ENCLOSED.”
    b. Statement of Qualifications shall be delivered to the following address:
    i. Allen County Sanitary Engineer
    ATTN: Brad Niemeyer, P.E.
    3230 N. Cole Street
    Lima, Ohio 45801
    c. Quantity and Format of Submittals
    i. (4) hard copies
    ii. (1) copy in .pdf format on a USB key
    E. SOQ Required Content
    1. Respondent’s Qualifications
    a. Identify the proposed delivery Team’s key personnel and their credentials, technical
    training, education, and previous CMAR experience.
    b. Provide an organizational chart for the key personnel for both the Preconstruction
    and Construction Phases of the Project.
    c. If Respondent’s CMAR Team includes Consultants and/or Subcontractors, identify the
    Respondent’s experience with each consultant on previous projects.
    d. Provide resumes for proposed staff.
    i. Limit resumes to (1) page per staff member.
    2. Capability to Provide CMAR Services
    a. Workload and Availability:
    i. Provide a table listing all projects ongoing at the time of submitting the SOQ to
    determine the Respondent’s availability to provide CMAR services.
    ii. The information provided should generally include project name, Client’s name,
    contract value, anticipated completion date, and the names of key personnel
    assigned to the project.
    b. Respondent’s Experience:
    i. Provide a table listing all treatment plant and pump station projects contracted in
    the last (10) years.
    BOSC PS & Forcemain
    Request for Qualifications
    5 of 9
    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...-260004 Project Manager Carrie Hyde Contracting Authority The Ohio State University Prevailing Wages... ...

    Ohio Facility Construction Commission

    Bid Due: 6/11/2026

    ...Mitigation & Plaza CMAR RFP REQUEST FOR PROPOSAL Construction Manager at Risk for ...

    City of Gahanna

    Bid Due: 6/12/2026

    ...Facilities Construction Commission Project Name HBH DDC And AHU Replacement Project Location... Contracting ...

    Ohio Facility Construction Commission

    Bid Due: 6/18/2026

    ..., and construction materials used in this project must be produced in the ...

    City of Sanduskey

    Bid Due: 6/18/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.