NIWTP Biosolids Sludge Dryer Alternative Building D/B

Location: Arizona
Posted: Jul 1, 2026
Due: Jul 16, 2026
Agency: INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Type of Government: Federal
Category:
  • Y - Construction of Structures and Facilities
Solicitation No: FY264321004
Publication URL: To access bid details, please log in.
Follow
NIWTP Biosolids Sludge Dryer Alternative Building D/B
Active
Contract Opportunity
Notice ID
FY264321004
Related Notice
Department/Ind. Agency
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Sub-tier
INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO
Office
INTERNAT BOUNDARY AND WATER COMM
Looking for contract opportunity help?

APEX Accelerators are an official government contracting resource for small businesses. Find your local APEX Accelerator (opens in new window) for free government expertise related to contract opportunities.

APEX Accelerators are funded in part through a cooperative agreement with the Department of Defense.

The APEX Accelerators program was formerly known as the Procurement Technical Assistance Program (opens in new window) (PTAP).

General Information
  • Contract Opportunity Type: Presolicitation (Original)
  • Original Published Date: Jul 01, 2026 12:46 pm MDT
  • Original Response Date: Jul 16, 2026 05:00 pm MDT
  • Inactive Policy: 15 days after response date
  • Original Inactive Date: Jul 31, 2026
  • Initiative:
    • None
Classification
  • Original Set Aside: No Set aside used
  • Product Service Code: Y1PD - CONSTRUCTION OF WASTE TREATMENT AND STORAGE FACILITIES
  • NAICS Code:
    • 236210 - Industrial Building Construction
  • Place of Performance:
    Rio Rico , AZ 85648
    USA
Description

Pre-Solicitation Notice



The USIBWC intends to issue a Request for Proposal (RFP) for a design-build contract to construct a new building at the Nogales International Wastewater Treatment Plant (NIWTP) in Santa Cruz County, Arizona. The new facility will house advanced sludge dewatering and drying equipment, including polymer equipment, as part of the NIWTP’s biosolids management upgrade.



The project includes:




  • Design and construction of a new building to accommodate the sludge dryer system and associated equipment.

  • Demolition of the existing belt filter presses and related polymer system components (excluding concrete foundations, overhead structure, and electrical motor control centers).

  • Relocation of an existing three-sided metal structure.

  • All associated site work, utilities, permitting, and commissioning to deliver a fully operational, code-compliant, and ready-to-use facility.



The final product shall be a fully commissioned, turn-key building with all required utilities (water, sanitary sewer, communications, electrical, fire protection, etc.) and site improvements, ready for immediate use upon completion.



2. Project Location



Nogales International Wastewater Treatment Plant

Santa Cruz County, Arizona

(31°26'56.58"N, 110°57'49.33"W)



3. Procurement Approach




  • Type: Design-Build (DB)

  • Contract Structure: Firm Fixed Price

  • Period of Performance: 365 calendar days after Notice to Proceed (NTP)

  • Set-Aside: The Government anticipates a small business set-aside, subject to market research results.



4. Scope of Work Highlights





  • Phase 1: Design




    • Site investigation, surveying, geotechnical investigations, and design development.

    • Preparation of construction documents, technical specifications, and all required reports.

    • Coordination with stakeholders and regulatory agencies.




  • Phase 2: Construction




    • Site preparation, demolition, and relocation activities.

    • Construction of the new sludge dryer building and installation of all required systems.

    • Quality control testing, commissioning, and project closeout.




  • Compliance:




    • All work must comply with federal, state, and local codes, including NEPA, OSHA, ADA/ABAAS, and applicable environmental and safety regulations.

    • The contractor is responsible for all required permits and coordination with utility providers.





5. Submission Requirements (When Solicitation is Issued)



Interested offerors will be required to submit:




  • Qualifications and relevant experience with similar design-build projects.

  • Technical approach and project management plan.

  • Past performance information.

  • Price proposal.



6. Anticipated Timeline




  • Pre-solicitation Notice: June 2026

  • Solicitation Release: On or about July 16, 2026

  • Site Visit: To be announced in the solicitation

  • Proposal Due Date: Approximately 30 days after solicitation release



7. Additional Information




  • This notice is not a request for proposals. The solicitation, specifications, and drawings will be made available on SAM.gov.

  • All interested parties are encouraged to monitor SAM.gov for updates.

  • Questions regarding this notice may be submitted via email to the Contracting Officer listed in the forthcoming solicitation.


Attachments/Links
Contact Information
Contracting Office Address
  • 4191 N. Mesa
  • El Paso , TX 79902
  • USA
Primary Point of Contact
Secondary Point of Contact


History
  • Jul 01, 2026 12:46 pm MDTPresolicitation (Original)
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...(negotiated) for the design and construction (design-build) of the Sludge Dryer Building within ...

INTERNATIONAL BOUNDARY AND WATER COMMISSION: US-MEXICO

Bid Due: 8/14/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.