| Location: | Utah |
|---|---|
| Posted: | Oct 4, 2026 |
| Due: | Oct 22, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2027WellDev |
| Publication URL: | To access bid details, please log in. |
Project Description: Dual Swab Development and Test Pumping of a production well (Well #1R) using a Cable Tool Rig. The well will be swabbed and pumped simultaneously to maximize the efficiency of the well while recording parameters such as static water level, pumping water level, flow rate while pumping, and sand production. The anticipated construction of the well is a 20-inch diameter casing, with approximately 300 feet of screen, to an anticipated depth of 800 feet. Figure 1 shows the location and site plan of the well.

With GovernmentContracts, you can:
...Project: Consultant for JOC Construction Services Ref. #: SB26-12 Department: Division... into a ...
State Government of Utah
Bid Due: 11/19/2026
...Project: Construction: Taylorsville High School Addition Ref. #: DB27-011-RFP Department: SCHOOL... of this ...
State Government of Utah
Bid Due: 11/19/2026
...Project: Construction: New Building at West Kearns Elementary Site Ref. #: JF27-018-IFB Department... ...
State Government of Utah
Bid Due: 12/10/2026
...Haynes Well 8 well house construction project 2027 Advertisement for Bids General Notice ...
Magna Water District
Bid Due: 12/01/2026