| Location: | Utah |
|---|---|
| Posted: | Oct 4, 2026 |
| Due: | Oct 22, 2026 |
| Agency: | State Government of Utah |
| Type of Government: | State & Local |
| Category: |
|
| Solicitation No: | 2027WellDrilling |
| Publication URL: | To access bid details, please log in. |
Project Description: Drilling of an exploratory pilot hole followed by reaming for construction of a production well using the reverse-rotary drilling method. The well is to be used in the Orem City drinking water system. Well #1R is anticipated to be completed with a 20-inch diameter casing to a total depth of approximately 800 feet. Anticipated production is from multiple Pleistocene alluvium aquifers.

With GovernmentContracts, you can:
...been detected during recent sampling. The Utah Division of Drinking Water (DDW) has ...
State Government of Utah
Bid Due: 11/16/2026
...Division of Drinking Water The purpose of this RFP is to enter into ...
State Government of Utah
Bid Due: 11/13/2026
...statement of qualifications (SOQs) from qualified civil engineering firms with experience in drinking ...
City of Ogden
Bid Due: 11/10/2026
...approval through the Utah Division of Drinking Water The Consultant shall furnish all ...
State Government of Utah
Bid Due: 11/06/2026