Woodhaven Driveway Replacement and Asphalt Paving Addendum 1 - Questions |
May 13, 2026 : |
June 25, 2026 1:45 PM |
| No. | QUESTION | RESPONSE | ||
|---|---|---|---|---|
| 1 | The curb is poured monolithic on Folkstone Dr, | Remove driveway and curb and replace both. | ||
| is it the city's preference to remove driveway | ||||
| and curb or pour driveway and saw cut, leavin | ||||
| original curb? | ||||
| 2 | There is no line item for asphalt patching, can one be added in case it is needed? | Asphalt patching will be added. | ||
| one be added in case it is needed? | ||||
| 3 | For the milling, is the 1.5" off of the existing or | e | 1.5" off the existing. | |
| below the gutter line? Some of the streets hav | ||||
| been overlayed and asphalt is above the curb. | ||||
| 4 | Home owners have poured concrete in the | We expect careful effort be made to not disturb the concrete in the gutter in front of driveways, but they are not the contractor's responsibility to fix because Duluth does not allow these. | ||
| are milling and paving if those come loose o | ||||
| break, are we required to pour those back? | ||||
| 5 | Will payment be based on field measurements or the exact quantities on the line items? | Payment will be based on field measurements. | ||
| or the exact quantities on the line items? | ||||
| 6 | Asphalt Patching | Asphalt patching will be added. | ||
| The plans reference patching as part of the mil | ||||
| and inlay detail; however, the bid form does | ||||
| not appear to include a separate patching item | ||||
| Should asphalt patching be considered | ||||
| incidental to the milling/asphalt items, or will it | ||||
| be paid separately if required? | ||||
| 7 | Unsuitable Soils | Yes, it should include the items you mentioned. 57 Stone. | ||
| For the unsuitable soils item, please confirm | ||||
| whether the unit price should include | ||||
| excavation, haul-off, disposal, replacement | ||||
| material, placement, and compaction. Also, | ||||
| please clarify what replacement material shoul | ||||
| be assumed. | ||||
| 8 | Resident Parking / Driveway Access | The City will coordinate with residents on temporary parking during construction. There is on-street parking to be utilized. | ||
| Will the City or HOA provide temporary parking | ||||
| areas for residents during concrete removal, | ||||
| replacement, and curing, or will the contractor | ||||
| be responsible for coordinating and maintainin | ||||
| resident parking/access? |
ADDENDUM NO. 1
TO
CONTRACT DOCUMENTS
WOODEHAVEN DRIVEWAY REPLACEMENT AND ASPHALT PAVING
DULUTH, GEORGIA
BIDS DUE JUNE 25, 2026
No. QUESTION RESPONSE
1 The curb is poured monolithic on Folkstone Dr, Remove driveway and curb and replace both.
is it the city's preference to remove driveway
and curb or pour driveway and saw cut, leaving
original curb?
2 There is no line item for asphalt patching, can Asphalt patching will be added.
one be added in case it is needed?
3 For the milling, is the 1.5" off of the existing or 1.5" off the existing.
below the gutter line? Some of the streets have
been overlayed and asphalt is above the curb.
4 Home owners have poured concrete in the We expect careful effort be made to not disturb
gutter line in front of the driveways. When we the concrete in the gutter in front of driveways,
are milling and paving if those come loose or but they are not the contractor's responsibility
break, are we required to pour those back? to fix because Duluth does not allow these.
5 Will payment be based on field measurements Payment will be based on field measurements.
or the exact quantities on the line items?
6 Asphalt Patching Asphalt patching will be added.
The plans reference patching as part of the mill
and inlay detail; however, the bid form does
not appear to include a separate patching item.
Should asphalt patching be considered
incidental to the milling/asphalt items, or will it
be paid separately if required?
7 Unsuitable Soils Yes, it should include the items you mentioned.
For the unsuitable soils item, please confirm 57 Stone.
whether the unit price should include
excavation, haul-off, disposal, replacement
material, placement, and compaction. Also,
please clarify what replacement material should
be assumed.
8 Resident Parking / Driveway Access The City will coordinate with residents on
Will the City or HOA provide temporary parking temporary parking during construction. There
areas for residents during concrete removal, is on-street parking to be utilized.
replacement, and curing, or will the contractor
be responsible for coordinating and maintaining
resident parking/access?
Addendum Prepared By
KECK & WOOD, INC.
June 12, 2026

With GovernmentContracts, you can:
INVITATION TO BID VEHICLE: HEAVY DUTY BID REF. #04-079 #04-079 Part 2 March
City of Albany
Bid Due: 2/03/2031
BL081-24 INV Purchase of a Swift Water Rescue Boat Buyer Contact : casey.beauston@gwinnettcounty.com
Gwinnett County
Bid Due: 12/31/2029
Bid Title: GENERAL CONTRACTORS TO CONSTRUCT AND/OR PERFORM REPAIRS AND REHABILITATION ON RESIDENTIAL
City of Newnan
Bid Due: 9/30/2031
Follow TS Zeta Multiple Trail Bridges Replacement Active Contract Opportunity Notice ID 12445525B0014
AGRICULTURE, DEPARTMENT OF
Bid Due: 8/22/2026