Woodhaven Driveway Replacement and Asphalt Paving

Location: Georgia
Posted: Jun 11, 2026
Due: Jun 25, 2026
Agency: City of Duluth
Type of Government: State & Local
Category:
  • Y - Construction of Structures and Facilities
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Description Opening Date/Time Closing Date/Time


Woodhaven Driveway Replacement and Asphalt Paving


Addendum 1 - Questions



May 13, 2026
:


June 25, 2026
1:45
PM

Attachment Preview

ADDENDUM NO. 1
TO
CONTRACT DOCUMENTS
WOODEHAVEN DRIVEWAY REPLACEMENT AND ASPHALT PAVING
DULUTH, GEORGIA
BIDS DUE JUNE 25, 2026
No. QUESTION
RESPONSE
1 The curb is poured monolithic on Folkstone Dr, Remove driveway and curb and replace both.
is it the city’s preference to remove driveway
and curb or pour driveway and saw cut, leaving
original curb?
2 There is no line item for asphalt patching, can Asphalt patching will be added.
one be added in case it is needed?
3 For the milling, is the 1.5” off of the existing or 1.5” off the existing.
below the gutter line? Some of the streets have
been overlayed and asphalt is above the curb.
4 Home owners have poured concrete in the
We expect careful effort be made to not disturb
gutter line in front of the driveways. When we the concrete in the gutter in front of driveways,
are milling and paving if those come loose or
but they are not the contractor’s responsibility
break, are we required to pour those back?
to fix because Duluth does not allow these.
5 Will payment be based on field measurements Payment will be based on field measurements.
or the exact quantities on the line items?
6 Asphalt Patching
Asphalt patching will be added.
The plans reference patching as part of the mill
and inlay detail; however, the bid form does
not appear to include a separate patching item.
Should asphalt patching be considered
incidental to the milling/asphalt items, or will it
be paid separately if required?
7 Unsuitable Soils
Yes, it should include the items you mentioned.
For the unsuitable soils item, please confirm
57 Stone.
whether the unit price should include
excavation, haul-off, disposal, replacement
material, placement, and compaction. Also,
please clarify what replacement material should
be assumed.
8 Resident Parking / Driveway Access
The City will coordinate with residents on
Will the City or HOA provide temporary parking temporary parking during construction. There
areas for residents during concrete removal,
is on-street parking to be utilized.
replacement, and curing, or will the contractor
be responsible for coordinating and maintaining
resident parking/access?
Addendum Prepared By
KECK & WOOD, INC.
June 12, 2026
This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-61100-NONST-2027-000000129

State Government of Georgia

Bid Due: 8/06/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-64400-NONST-2026-000000244

State Government of Georgia

Bid Due: 7/29/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-92800-RFQC-2027-000000014

State Government of Georgia

Bid Due: 7/24/2026

Event ID Event Title Government Entity Start Date (ET) End Date (ET) PE-66114-NONST-2027-000000036

State Government of Georgia

Bid Due: 8/27/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.