26-99619 RFP for Engineering Services for Canal Park Drive Rehabilitation

Location: Minnesota
Posted: Aug 1, 2026
Due: Aug 25, 2026
Agency: City of Duluth
Type of Government: State & Local
Category:
  • R - Professional, Administrative and Management Support Services
Publication URL: To access bid details, please log in.
  • 26-99619 RFP for Engineering Services for Canal Park Drive Rehabilitation (due 8/25)
  • Attachment Preview

    CITY OF DULUTH, MN
    July 22, 2026
    Request for Proposals
    for
    Engineering Services for Canal Park Drive
    Rehabilitation
    RFP 26-99619
    Proposals Due: Tuesday, August 25, 2026 at 3:00 pm local time
    I:\FINANCE\PURCHASING\Bids, RFPs, Contracts & Agreements\2026\26-99619 Canal Park Drive Rehabilitation\1975 RFP - DRAFT.docx
    Page 1 of 8

    PROJECT OVERVIEW
    The City of Duluth is interested in retaining a consultant to provide professional engineering
    services to complete a design of a concrete joint repair and lighting replacement project on Canal
    Park Drive in Duluth. The project will stretch from Railroad Street to Buchanan Street.
    BACKGROUND
    Canal Park is a highlight tourist destination within the City of Duluth and the streets within
    Canal Park are surfaced with concrete pavement dating from initial paving in the 1990's. This
    pavement is degraded and joints have been repaired via various repairs through the years. Today,
    these joints require significant effort to repair. The City is looking for a consultant to review the
    current joint condition and develop construction documents to repair these joints/panels with a
    goal of restoring and lengthening the life of the current pavement.
    The proposed design would include:
    * Repair of concrete joints on Canal Park Drive, from Railroad Street to Buchanan Street.
    This project will not extend into Buchanan Street beyond the intersection.
    * Replacement of street lighting on Canal Park Drive within the project limits. While
    lighting beyond Canal Park Drive will not be replaced as part of the construction project,
    the system (service cabinet, etc.) shall be designed to handle powering the lighting
    throughout Canal Park, which will be replaced at a later date through other projects.
    The selected consultant will be tasked with initial investigation and recommendations, preparing
    the project memorandum, design plans and specifications suitable for bidding the project, and
    with providing technical support through the project bidding process. The City is not including
    construction phase services with this contract, though construction services may be requested at a
    later date.
    GENERAL PROJECT SCOPE
    Consulting engineering services are expected to include all work necessary to evaluate the
    condition of the existing pavement and recommend specific repairs, prepare construction plans
    and special provisions for the recommended repairs, and provide technical assistance to the City
    through the state aid process. This work will include preparing environmental documentation for
    the project. The City anticipates that this project, due to the rehabilitation nature of the expected
    project, will qualify as a categorical exclusion.
    These tasks will be defined in greater detail within this solicitation. All work shall be performed
    in accordance with the most recent version of the Minnesota DOT State Aid Manual, Minnesota
    DOT Standard Specifications for Construction, and City Standard Specifications and
    Engineering Guidelines.
    Page 2 of 8

    SCOPE OF SERVICES
    The Consultant shall provide the following scope of services, as described in detail below,
    following the general summary: Project Management, Project Reconnaissance, Engineering
    Design, and Project Bidding. As noted below, the Consultant shall not provide construction
    administration services at this time.
    1. Project Meetings, Management and Coordination
    Consultant shall manage their effort to complete the design effort required to produce the project.
    This shall include the overall project management effort, project meetings and coordination with
    stakeholders.
    Project Management
    The Consultant is expected to manage their project effort in an efficient manner and
    within the schedule proposed. This includes tasks such as timely invoicing, coordination
    of internal resources, scheduling of the project and required resources, and providing
    quality control of the deliverables.
    Meetings
    The consultant shall expect to attend a public meeting and multiple internal design review
    and/or coordination meetings.
    * Kickoff Meeting: Consultant shall organize and prepare a kickoff meeting to
    review project tasks and review project schedule to ensure project remains on
    track.
    * Design/Review Coordination: Meetings can be conducted via on-line tools
    (Teams, etc.). Consultant should plan effort based on these meetings occurring
    monthly through bidding.
    * Public Meeting: Consultant shall prepare materials for and attend one public
    meeting to introduce the project and the impact to the adjacent properties. City
    staff will assist in coordinating the meeting location in the Canal Park area.
    Consultant will provide all boards/presentation materials for the meeting. City
    staff may do additional outreach and/or meetings and any additional public
    meetings where the Consultant is requested to attend would be considered outside
    of scope.
    Project Stakeholder Engagement
    The City intends to handle day-to-day coordination with local stakeholders and
    businesses. The Consultant may need to reach out to specific stakeholders in regards to
    traffic control and access management specifics, as it relates to the preparation of the
    construction drawings only.
    2. Project Reconnaissance/Evaluation
    Proposer will be responsible for performing an assessment of the concrete joints on the
    project. Consultant will be responsible for performing survey sufficient to locate and
    provide for all lighting installations, joints that need to be repaired and any pedestrian
    ramp replacements required as part of this project.
    Page 3 of 8

    Consultant shall complete the project memorandum and required attachments suitable for
    submittal to the District State Aid Engineer (DSAE) for approval. Consultant shall assist
    in any responses required to the DSAE based on their review.
    The City has prepared and submitted cultural and protected species worksheets to
    MnDOT.
    Project Reconnaissance will include the delivery of a technical memorandum
    summarizing the repairs to be completed and preliminary cost estimate for review by the
    City.
    3. Engineering Design
    The consultant will be responsible for preparing full engineering design plans and project special
    provisions for this project, suitable for bidding and construction. This design will supplement
    existing City standard specifications, and applicable MnDOT standards specifications and
    standard plans. The City will provide boilerplate special provisions language for consultant use
    in preparing these documents.
    The City assumes a project deliverable for review at the following stages:
    * 50% Design Review: Preliminary layout and photometrics. Design detail is minimal, with
    standard boilerplate language and details included only. Project photometrics are
    completed. This is generally considered to be the time for any significant design changes.
    Preliminary cost estimate is prepared for comparison to available funding.
    * 90% Design Review: Final design review, draft project special provisions review. Final
    cost estimate is prepared. These plans should be considered ready to submit to DSAE for
    project review.
    A final deliverable, after all reviews are completed, will consist of the design plans (in PDF
    format) signed by the engineer of record, special provisions (PDF and Microsoft Word format)
    and a final cost estimate, with individual bid items matching the bid quantities (PDF and
    Microsoft Excel format). City staff will route the design plans for internal signatures.
    4. Project Bidding
    The City will oversee bidding the project. The consultant shall be available for answering
    clarification questions and if needed, preparing addendum responses. The proposers should
    include 16 hours of the project manager's time within their cost proposal for addressing
    questions through the bidding process.
    5. Construction Administration
    The City plans to provide construction inspection and administration of the project at this time. If
    necessary, construction phase services may be requested under separate cover. The Consultant
    should not include any time for construction administration at this time.
    PROJECT COMPLETION DATES
    July 23, 2026 RFP Issued
    August 25, 2026 Proposals Due
    Page 4 of 8

    August 28, 2026 Selection of Consultant
    September 14, 2026 Council Approval to Award Contract
    October 2026 Project Memorandum Submittal
    November 2026 50% Plan Review
    December 2026 90% Plan Review
    February/March 2027 Advertise for Bids
    March/April 2027 Receive Bids
    July 2027 Start Construction
    September 2027 Construction Completion
    November 2027 Submittal of Record Drawings
    PROPOSAL CONTENTS
    The proposal shall be submitted in the following format broken into the sections identified
    below. Proposals not following the specified format will not be reviewed. No additional sections
    or appendices are allowed. The proposal will be submitted with a Qualifications Proposal and a
    Cost Proposal in a separately sealed envelope. To be considered, hard copies of proposals must
    arrive at the City on or before the time and date specified in the RFP Calendar of Events. The
    City will not accept proposals via email or facsimile transmission. The City reserves the right to
    reject or to deduct evaluation points for late proposals.
    Qualifications Proposal Contents
    * Proposers shall include three (3) paper copies of the qualification proposal with the
    submittal.
    One (1) copy shall be unbound. The unbound copy may be secured with a binder
    o
    clip or other method that is easily removed for scanning.
    * The qualifications proposal shall be limited to twelve (12) single-sided pages.
    * Proposers may opt to include one (1) single-sided page 11" X 17" page if necessary for a
    project layout, workplan or other graphical design.
    * The separate cost proposal can be on an 11" X 17" page.
    * Proposals that exceed the page limit will not be reviewed past page 12.
    * Cover pages and or graphical dividers will not be considered as part of the page
    limitations.
    The proposal format shall be as follows:
    1. Project Understanding
    A brief restatement of the goals and objectives and the project tasks to demonstrate the
    responder's review and understanding of the project. Consultant should identify key
    project challenges and overall suggestions for how to address them.
    2. Similar Project Experience
    An outline of the responder's background and experience with similar projects, providing
    concrete repair work and lighting design on roadways in urban areas.
    Page 5 of 8

    3. Personnel
    Identify key personnel to conduct the project and detail their training and work
    experience. Identify how personnel proposed for this project were involved with the
    projects listed as experience. Identify a professional engineer registered in the State of
    Minnesota who will oversee the overall project and be responsible for certifying the plans
    and special provisions. Once the project is awarded, no change in key personnel assigned
    to the project will be permitted without approval of the City. Note and address pre-
    qualification requirements below in item 4.
    4. Knowledge of Duluth Requirements and Pre-qualification
    Include a brief description of the firm's knowledge and experience utilizing the City of
    Duluth Engineering Guidelines and Construction Standards.
    Lighting design must be performed by staff meeting prequalification 14.3 with the
    Minnesota Department of Transportation (Roadway Lighting Design). The lighting
    designer may be a subconsultant that prepares the lighting design plans and special
    provisions. Proposers that do not include a lighting designer holding prequalification 14.3
    will be disqualified for this project.
    5. Work Plan and Scope of Work
    Consultant shall include a detailed statement of the project scope of work and
    demonstrate how the Consultant plans to organize and complete the work. This must
    include a detailed work plan identifying the tasks to be accomplished and the budget
    hours planned on each task and subtask. The work plan shall be prepared in
    chart/spreadsheet format, including each proposed task and the number of hours for each
    staff person on that task. The work plan shall be generally organized to match the
    consultant's scope of work.
    The work plan is expected to be a mirror of the cost proposal, with cost of
    staff/phases/tasks removed. The work plan is used to evaluate the Consultant's
    understanding of the effort involved in the preparation of this project.
    6. Work Schedule
    An anticipated work schedule shall also be provided. The work schedule shall identify all
    key milestone dates.
    7. References
    Provide names, email addresses, and telephone numbers of at least three (3) references
    for whom the respondent has performed similar street and utility construction services.
    References shall not include City of Duluth staff.
    COST PROPOSAL CONTENTS
    Provide one (1) unbound copy of the cost proposal in a separate sealed envelope, clearly marked
    on the outside "Cost Proposal" along with the responder's official business name and address.
    Terms of the proposal as stated must be valid for the project length of time.
    Page 6 of 8

    Item Percent
    1 Firm experience 10%
    2 Personnel experience 15%
    3 Work Plan and Schedule 25%
    4 Project Understanding 25%
    5 Project costs/fees 25%

    The consultant must include a not to exceed (NTE) total project cost, as well as subtotals for
    design services, bidding, and any subconsultant fees. The cost proposal shall include all of the
    following:
    * A breakdown of the hours by task for each employee. This shall be in the same format as
    the work plan in the Qualifications Proposal with the addition of costs.
    * Hourly rates for each specific employee proposed (not general rates by category). These
    rates should be organized to include all relevant overhead costs within a single rate for
    staff.
    * Identification of anticipated direct expenses and rates for miscellaneous charges such as
    mileage and copies.
    * Identification of any assumption made while developing this cost proposal.
    * Identification of any cost information related to additional services or tasks. Include this
    in the cost proposal but identify it as additional costs and do not make it part of the total
    project cost.
    * Proposals must be signed by an authorized official. If the official signs the Proposal
    Cover Sheet attached as Appendix A, this requirement will be met.
    * The Consultant must not include any cost information within the body of the RFP
    qualification proposal response. Including cost information within the qualification
    proposal will be grounds to disqualify the Consultant for consideration.
    SELECTION
    The proposals will be reviewed by City Staff. The intent of the selection process is to review
    proposals and make an award based upon qualifications as described herein. A 100-point scale
    will be used to create the final evaluation recommendations. The factors and weighting on which
    proposals will be judged are:
    Item Percent
    1 Firm experience 10%
    2 Personnel experience 15%
    3 Work Plan and Schedule 25%
    4 Project Understanding 25%
    5 Project costs/fees 25%
    Proposals will be evaluated on a best value basis with 75% qualifications and 25% cost
    consideration. The review committee will not open the cost proposal until after the qualification
    points have been awarded. Cost proposals will only be opened for the three top ranked firms. The
    City anticipates that the evaluation and selection will be completed by August 28, 2026 and
    official award of contract to be made at the City Council meeting scheduled for September 14,
    2026.
    SUBMITTAL DATE
    Submit unbound original in an envelope marked, " 26-99619 RFP for Eng Svcs for Medical
    District Lighting Improvements" by 3:00 PM CDT, August 25, 2026 to:
    Page 7 of 8

    Patrice Stalvig, Purchasing Agent
    City of Duluth - Purchasing Department
    411 W 1st Street, Room 120 City Hall
    Duluth, MN 55802
    Digital copies of proposals may be requested of proposers after proposal due date.
    CONTACT
    All questions concerning the project shall be directed to:
    Joe Jurewicz, P.E., Senior Engineer
    City of Duluth - Engineering Division
    411 W 1st Street, Room 240 City Hall
    Duluth, Minnesota 55802
    jjurewicz@duluthmn.gov
    (218) 730-5095
    The deadline to submit questions is Tuesday, August 18, 2026.
    LIMITATIONS
    This Request for Proposal does not commit the City of Duluth to award a contract or pay costs
    incurred in the preparation of the proposal, or to procure a contract for services or supplies.
    The Proposal shall not in any way include any restrictions on the City of Duluth. The Consultant
    shall NOT provide proposed contract language.
    The City of Duluth specifically reserves the right to accept or reject any or all proposals, to
    negotiate with any qualified source, to cancel in part or in its entirety the Request for Proposal, to
    waive any requirements, to investigate the qualifications of any proposal, to obtain new
    proposals, or proceed to have the service provided in any way as necessary to serve the best
    interests of the City of Duluth.
    The selected consultant must sign the City of Duluth Standard Professional Engineering Services
    Agreement, a sample of which is available at https://duluthmn.gov/purchasing/forms/. Any
    questions concerning this agreement should be asked PRIOR to proposal submittal. These
    questions should be directed to Joe Jurewicz in the City Engineering Office.
    All materials submitted in response to this RFP will become property of the City and will
    become public record after the evaluation process is complete and an award decision made.
    Prior to entering into an agreement with the City, the Consultant shall furnish proof that it has
    met all legal requirements for transacting business in the State of Minnesota.
    By submitting a proposal, each Bidder understands, represents, and acknowledges that:
    Page 8 of 8

    a. Their proposal has been developed by the Bidder independently and has been
    submitted without collusion with and without agreement, understanding, or
    planned common course of action with any other vendor or suppliers of materials,
    supplies, equipment, or services described in the Request for Proposals, designed
    to limit independent bidding or competition, and that the contents of the proposal
    have not been communicated by the Bidder or its employees or agents to any
    person not an employee or agent of the Bidder.
    b. There is no conflict of interest. A conflict of interests exists if a Bidder has any
    interest that would actually conflict, or has the appearance of conflicting, in any
    manner or degree with the performance of work on the project. If there are
    potential conflicts, identify the municipalities, developers, and other public or
    private entities with whom your company is currently, or have been, employed
    and which may be affected.
    c. It is not currently under suspension or debarment by the State of Minesota, any
    other state, or the federal government.
    d. The company is either organized under Minnesota law or has a Certificate of
    Authority from the Minnesota Secretary of State to do business in Minnesota, in
    accordance with the requirements in M.S. 303.03
    Page 9 of 8

    City of Duluth
    Supplementary Provisions for State and/or Federally Assisted Activities
    1. Disbursements
    (a) No money under this Contract shall be disbursed by the City to any Contractor unless the
    Contractor is in compliance with the Federal Agency requirements with regard to accounting and
    fiscal matters to the extent they are applicable.
    (b) Unearned payments under this Contract may be suspended or terminated upon the Contractor's
    refusal to accept any additional conditions that may be imposed by the Federal Agency at any
    time; or if the grant, if applicable, to the City under which this Contract is made is suspended or
    terminated.
    2. Subcontracting Requirements
    (a) The Contractor shall include in any subcontract the clauses set forth in these City of Duluth
    Supplementary Provisions in their entirety and shall also include a clause requiring the
    subcontractors to include these clauses in any lower tier subcontracts which they may enter into,
    together with a clause requiring this insertion in any further subcontracts that may in turn be
    made.
    (b) The Contractor shall not subcontract any part of the work covered by this Contract or permit
    subcontracted work to be further subcontracted without the City's prior written approval of the
    subcontractors. The City will not approve any subcontractor for work covered by this Contract
    who is at the time ineligible under the provisions of any applicable regulations issued by a Federal
    Agency or the Secretary of Labor, United States Department of Labor, to receive an award of such
    subcontract.
    3. Termination
    For Cause: If the Contractor is in breach of the Contract, the City, by written notice to the Contractor,
    may terminate the Contractor's right to proceed with the Work. Upon such termination, the City may take
    over the Work and prosecute the same to completion, by contract or otherwise, and the Contractor and
    its sureties shall be liable to the City for any additional cost incurred by the City in its completion of the
    Work and they shall also be liable to the City for liquidated damages for any delay in the completion of the
    Work as provided below. If the Contractor's right to proceed is terminated, the City may take possession
    of and utilize in completing the Work such materials, tools, equipment, and plant as may be on the site of
    the Work and necessary therefore.
    For Insufficient Funds: City shall have the right to terminate this contract immediately without other
    cause in the event that all or a portion of the funds that the City intends to use to fund its obligations
    under the contract have their source with the State or Federal government or any agency thereof and said
    source reduces or eliminates their obligation to provide some or all of the funds previously committed by
    it to fund City's payment obligations under the Contract. The City agrees that termination hereunder will
    not relieve the City of its obligation to pay Contractor for Work satisfactorily performed and reasonable
    costs incurred prior to the effective date.
    Without Cause: Notwithstanding anything herein to the contrary, the City may terminate this Contract
    at any time upon written notice given by the City (for any reason, including the convenience of the City) to
    the Contractor at least thirty (30) days prior to the effective date of the termination of this Contract. The
    City agrees that termination hereunder will not relieve the City of its obligation to pay Contractor for Work
    satisfactorily performed and reasonable costs incurred prior to the effective date of the termination
    provided that Contractor has not committed a breach of this Contract. Nothing contained in this section
    Revised 06.04.2026 1

    This is the opportunity summary page. It provides an overview of this opportunity and a preview of the attached documentation.
    Daily notification on new contract opportunities

    With GovernmentContracts, you can:

    • Find more opportunities and win more business
    • Receive daily alerts for all new bid opportunities
    • Get contract opportunities matched to your business
    ONE WEEK FREE TRIAL

    See also

    ...ENGINEERING SERVICES. The Vadnais Lake Area Water Management Organization (VLAWMO) seeks proposals... from ...

    League of Minnesota Cities

    Bid Due: 9/30/2026

    ...Informal Request for Proposal: Notice of Informal Request for Proposals for Engineering Services...

    Stearns County

    Bid Due: 9/24/2026

    * Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.