General Statement of Work
The purpose of this project is to rehabilitate deteriorating sanitary pipes and manholes using trenchless methods. The manholes will be rehabilitated using approved lining methods and materials specified in accordance with the manhole rehabilitation specifications. The pipes will be rehabilitated using Cured-In-Place Pipe (CIPP). CIPP is a trenchless rehabilitation method used to extend the service life of deteriorated pipelines without full replacement. Rather than excavating and removing the old pipe, CIPP installs a resin-saturated liner inside the existing host pipe which cures in place to form a new, jointless, structurally sound pipe. Minor excavation may be required to install temporary bypass. Where above-ground piping is not feasible, small trenches (approximately 1 ft x 1 ft to 2 ft x 2 ft) may be excavated. For rehabilitation of pipes larger than 30 inches in diameter, the manhole cone may need to be removed for liner installation. No new infrastructure will be built with this project and therefore no fill or significant disturbance will impact existing infrastructure or its surroundings.
Statement of Quantities (PDF, 17KB)
Estimated Construction Cost: Between $5,100,000.00 and $5,700,000.00.
Virtual Pre-Bid Meeting on July 14, 2026 at 10:00 a.m.
To access the meeting, please call 720-388-6219 and enter conference ID: 145 462 384# or join via
Microsoft Teams
.
Questions Deadline: July 21, 2026 at 10:00 a.m. local time.
Bid Opening on August 11, 2026 at 11:00 a.m.
Bids will be received and accepted via the online electronic bid service, Rocky Mountain E-Purchasing (“
BidNet
”). Prospective bidders must be on the plan holders list on BidNet for bids to be accepted. To access the electronic bid form, download the required documents from BidNet and complete the Unit Item Pricing in the Documents & Items section of the solicitation. All properly uploaded bids will then be opened, witnessed and read aloud. To access the bid opening teleconference, please call 720-388-6219 and enter conference ID: 375 752 905# or join via
Microsoft Teams
.
Plans Available July 7, 2026 – Digital Download – Solicitation No. 202684947
DSBO Goal: No Program Requirements
Prequalification: Each bidder must be prequalified in category 1E(2) Sewer Rehabilitation at or above the $6,000,000.00 monetary level in accordance with the City’s Rules and Regulations Governing Prequalification of Contractors. Each bidder must have submitted a prequalification application a minimum of ten (10) calendar days prior to the response due date. Applications must be submitted via B2Gnow . To view the Rules and information on how to apply, please visit our website at www.denvergov.org/prequalification .
Contract Administrator: Cheryl Booker, DOTI.Procurement@denvergov.org
Prevailing Wage and Minimum Wage: Contracts for construction, reconstruction, and remodeling are subject to the City prevailing wage rate requirements established pursuant to Section 20-76, D.R.M.C. City contracts are subject to payment of City Minimum Wage established pursuant to Section 20-82 through 20-84 D.R.M.C.
As the City’s best interests may appear, the Executive Director of the Department of Transportation and Infrastructure reserves the right to waive informalities in, and to reject any or all, submittals.
Publication Date: July 7, 2026
Published In: Do Business with DOTI and BidNet
Pre-Bid Meeting: July 14, 2026, at 10:00 a.m.
Questions Deadline: July 21, 2026, at 10:00 a.m. local time.
Bid Opening on August 11, 2026, at 11:00 a.m.
Publication Date: July 7, 2026
Published In: Do Business with DOTI and BidNet
| Base Bid - Base Bid | |||
|---|---|---|---|
| Item No | Description | UOM | Quantity |
| 18 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 | Linear Foot/Feet | ||
| 21 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 | Linear Foot/Feet | ||
| 24 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 | Linear Foot/Feet | ||
| 26 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 | Linear Foot/Feet | ||
| 27 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 | Linear Foot/Feet | ||
| 18 - SEWER BY-PASS PUMPING - 34-17.3 | Linear Foot/Feet | ||
| 21 - SEWER BY-PASS PUMPING - 34-17.3 | Linear Foot/Feet | ||
| 24 - SEWER BY-PASS PUMPING - 34-17.3 | Linear Foot/Feet | ||
| 26 - SEWER BY-PASS PUMPING - 34-17.3 | Linear Foot/Feet | ||
| 27 - SEWER BY-PASS PUMPING - 34-17.3 | Linear Foot/Feet | ||
| 18 - CURED-IN-PLACE-PIPE - 34-17.4 | Linear Foot/Feet | ||
| 21 - CURED-IN-PLACE-PIPE - 34-17.4 | Linear Foot/Feet | ||
| 24 - CURED-IN-PLACE-PIPE - 34-17.4 | Linear Foot/Feet | ||
| 26 - CURED-IN-PLACE-PIPE - 34-17.4 | Linear Foot/Feet | ||
| 27 - CURED-IN-PLACE-PIPE - 34-17.4 | Linear Foot/Feet | ||
| GRINDING - 34-17.5 | Linear Foot/Feet | ||
| SEWER SERVICE REACTIVATION - 34-17.6a | Each | ||
| EXTENDED TAP CUTTING - 34-17.7 | Each | ||
| TRAFFIC CONTROL - 41-1 | Lump-Sum | ||
| CIPP LABORATORY TESTING - 45-1 | Each | ||
| MOBILIZATION - 50-1 | Lump-Sum | ||
| HYDROPHILIC END SEAL SLEEVE (8"-18") - see SOW A.5 | Each | ||
| HYDROPHILIC END SEAL SLEEVE (21"-48") - see SOW A.5 | Each | ||
| 4' MANHOLE REHABILITATION - see SOW A.4 | Vertical Feet | ||
| 5' MANHOLE REHABILITATION - see SOW A.4 | Vertical Feet | ||
| 6' MANHOLE REHABILITATION - see SOW A.4 | Vertical Feet | ||
| SP - SPECIAL MANHOLE REHABILITATION - see SOW A.4 | Vertical Feet |
| Allowance Accounts - Base Bid | |||
|---|---|---|---|
| Item No | Description | UOM | Quantity |
| ALLOWANCE ACCOUNT NOISE VARIANCE - A.6 | Lump-Sum | ||
| ALLOWANCE ACCOUNT HEAVY CLEANING - A.6 | Lump-Sum | ||
| ALLOWANCE ACCOUNT CRITICAL SANITARY REHABILITATION - A.6 | Lump-Sum | ||
| ALLOWANCE ACCOUNT CRITICAL STORM REHABILITATION - A.6 | Lump-Sum |
Statement of Quantities
Base Bid - Base Bid
Item No Description UOM Quantity
1 18 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 Linear Foot/Feet 744
2 21 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 Linear Foot/Feet 6193
3 24 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 Linear Foot/Feet 3995
4 26 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 Linear Foot/Feet 840
5 27 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 Linear Foot/Feet 2643
6 18 - SEWER BY-PASS PUMPING - 34-17.3 Linear Foot/Feet 744
7 21 - SEWER BY-PASS PUMPING - 34-17.3 Linear Foot/Feet 6193
8 24 - SEWER BY-PASS PUMPING - 34-17.3 Linear Foot/Feet 3995
9 26 - SEWER BY-PASS PUMPING - 34-17.3 Linear Foot/Feet 840
10 27 - SEWER BY-PASS PUMPING - 34-17.3 Linear Foot/Feet 2643
11 18 - CURED-IN-PLACE-PIPE - 34-17.4 Linear Foot/Feet 744
12 21 - CURED-IN-PLACE-PIPE - 34-17.4 Linear Foot/Feet 6193
13 24 - CURED-IN-PLACE-PIPE - 34-17.4 Linear Foot/Feet 3995
14 26 - CURED-IN-PLACE-PIPE - 34-17.4 Linear Foot/Feet 840
15 27 - CURED-IN-PLACE-PIPE - 34-17.4 Linear Foot/Feet 2643
16 GRINDING - 34-17.5 Linear Foot/Feet 145
17 SEWER SERVICE REACTIVATION - 34-17.6a Each 148
18 EXTENDED TAP CUTTING - 34-17.7 Each 15
19 TRAFFIC CONTROL - 41-1 Lump-Sum 1
20 CIPP LABORATORY TESTING - 45-1 Each 17
21 MOBILIZATION - 50-1 Lump-Sum 1
27 HYDROPHILIC END SEAL SLEEVE (8"-18") - see SOW A.5 Each 2
28 HYDROPHILIC END SEAL SLEEVE (21"-48") - see SOW A.5 Each 2
29 4' MANHOLE REHABILITATION - see SOW A.4 Vertical Feet 410
30 5' MANHOLE REHABILITATION - see SOW A.4 Vertical Feet 338
31 6' MANHOLE REHABILITATION - see SOW A.4 Vertical Feet 12
32 SP - SPECIAL MANHOLE REHABILITATION - see SOW A.4 Vertical Feet 45
Textura Textura Fee (reference table on BF-3) Lump-Sum 1
Allowance Accounts - Base Bid
Item No Description UOM Quantity
22 ALLOWANCE ACCOUNT NOISE VARIANCE - A.6 Lump-Sum 1
23 ALLOWANCE ACCOUNT HEAVY CLEANING - A.6 Lump-Sum 1
24 ALLOWANCE ACCOUNT CRITICAL SANITARY REHABILITATION - A.6 Lump-Sum 1
25 ALLOWANCE ACCOUNT CRITICAL STORM REHABILITATION - A.6 Lump-Sum 1
26 ALLOWANCE ACCOUNT RAILROAD PERMIT FEE - A.6 Lump-Sum 1
Contract No. 202684947 SQ-1 July 7, 2026
2026 Phase 2
| Add Alt #1 - ADD ALTERNATIVE | |||
|---|---|---|---|
| Item No | Description | UOM | Quantity |
| 21 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 | Linear Foot/Feet | ||
| 21 - SEWER BY-PASS PUMPING - 34-17.3 | Linear Foot/Feet | ||
| 21 - CURED-IN-PLACE-PIPE - 34-17.4 | Linear Foot/Feet | ||
| GRINDING - 34-17.5 | Linear Foot/Feet | ||
| SEWER SERVICE REACTIVATION - 34-17.6a | Each | ||
| EXTENDED TAP CUTTING - 34-17.7 | Each | ||
| TRAFFIC CONTROL - 41-1 | Lump-Sum | ||
| CIPP LABORATORY TESTING - 45-1 | Each | ||
| MOBILIZATION - 50-1 | Lump-Sum | ||
| 4' MANHOLE REHABILITATION - see SOW A.4 | Vertical Feet |
| Add Alt #2 - ADD ALTERNATIVE | |||
|---|---|---|---|
| Item No | Description | UOM | Quantity |
| 21 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 | Linear Foot/Feet | ||
| 27 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 | Linear Foot/Feet | ||
| 21 - SEWER BY-PASS PUMPING - 34-17.3 | Linear Foot/Feet | ||
| 27 - SEWER BY-PASS PUMPING - 34-17.3 | Linear Foot/Feet | ||
| 21 - CURED-IN-PLACE-PIPE - 34-17.4 | Linear Foot/Feet | ||
| 27 - CURED-IN-PLACE-PIPE - 34-17.4 | Linear Foot/Feet | ||
| GRINDING - 34-17.5 | Linear Foot/Feet | ||
| SEWER SERVICE REACTIVATION - 34-17.6a | Each | ||
| EXTENDED TAP CUTTING - 34-17.7 | Each | ||
| TRAFFIC CONTROL - 41-1 | Lump-Sum | ||
| CIPP LABORATORY TESTING - 45-1 | Each | ||
| MOBILIZATION - 50-1 | Lump-Sum |
Statement of Quantities
Add Alt #1 - ADD ALTERNATIVE
Item No Description UOM Quantity
33 21 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 Linear Foot/Feet 2334
34 21 - SEWER BY-PASS PUMPING - 34-17.3 Linear Foot/Feet 2334
35 21 - CURED-IN-PLACE-PIPE - 34-17.4 Linear Foot/Feet 2334
36 GRINDING - 34-17.5 Linear Foot/Feet 59
37 SEWER SERVICE REACTIVATION - 34-17.6a Each 103
38 EXTENDED TAP CUTTING - 34-17.7 Each 3
39 TRAFFIC CONTROL - 41-1 Lump-Sum 1
40 CIPP LABORATORY TESTING - 45-1 Each 4
41 MOBILIZATION - 50-1 Lump-Sum 1
42 4' MANHOLE REHABILITATION - see SOW A.4 Vertical Feet 12
43 5' MANHOLE REHABILITATION - see SOW A.4 Vertical Feet 73
Add Alt #2 - ADD ALTERNATIVE
Item No Description UOM Quantity
44 21 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 Linear Foot/Feet 1036
45 27 - SEWER PIPE PRE- VIDEO INSPECTION & CLEANING - 34-17.1 & .2 Linear Foot/Feet 955
46 21 - SEWER BY-PASS PUMPING - 34-17.3 Linear Foot/Feet 1036
47 27 - SEWER BY-PASS PUMPING - 34-17.3 Linear Foot/Feet 955
48 21 - CURED-IN-PLACE-PIPE - 34-17.4 Linear Foot/Feet 1036
49 27 - CURED-IN-PLACE-PIPE - 34-17.4 Linear Foot/Feet 955
50 GRINDING - 34-17.5 Linear Foot/Feet 50
51 SEWER SERVICE REACTIVATION - 34-17.6a Each 2
52 EXTENDED TAP CUTTING - 34-17.7 Each 1
53 TRAFFIC CONTROL - 41-1 Lump-Sum 1
54 CIPP LABORATORY TESTING - 45-1 Each 3
55 MOBILIZATION - 50-1 Lump-Sum 1
56 4' MANHOLE REHABILITATION - see SOW A.4 Vertical Feet 54