INFORMATION TECHNOLOGY CENTER - REMOVE AND REPLACE COMPRESSOR FOR THE MUNTER UNIT

Location: Hawaii
Posted: Feb 14, 2026
Due: Feb 27, 2026
Agency: General Contractors Association
Type of Government: State & Local
Category:
  • 43 - Pumps and Compressors
  • Z - Maintenance, Repair or Alteration of Real Property
Publication URL: To access bid details, please log in.
Bid Date: 2026-02-27

Project Description: Provide all labor necessary to replace a compressor for a Munter unit as indicated in
the plans and specifications. The proposed work shall generally include removal,
disposal and replacement of the compressor per manufacturer’s specifications; any
insulation that is removed must be replaced with new. Start-up the unit per
manufacturer’s recommendations and perform system checks to confirm proper
operations. Submit all data collected to the university of Hawaii facilities
management office, attention: Carl Oshiro prior to request for final inspection. All
work located in the mechanical room at Information Technology Center, UHM.

Provide all tools materials, equipment and insurance necessary to replace a
compressor for a Munter unit as indicated in the plans and specifications. The
proposed work shall generally include removal, disposal and replacement of the
compressor per manufacturer’s specifications; any insulation that is removed must be
replaced with new. Start-up the unit per manufacturer’s recommendations and perform
system checks to confirm proper operations. Submit all data collected to the
university of Hawaii facilities management office, attention: Carl Oshiro prior to
request for final inspection. All work located in the mechanical room at Information
Technology Center, UHM.

Special Instructions

ALL bidders are requested to attend a mandatory site walk-through. A site walk through is
scheduled for 8:00 a.m. on Tuesday February 17, 2026. Contractors shall meet at the
Physical Plant Mechanical Engineer Office located at 2002 East- West Road. Contract
documents will be distributed at the mandatory walk through. Contractors interested in
bidding this work must contact Carl Oshiro through email ( coshiro6@hawaii.edu), facsimile
(956-5979) or phone (956-0479) to confirm attendance by 4:00 p.m. Friday February 13,
2026. Contractors who DO NOT attend a mandatory site walk-through will not be allowed to
bid on this work. Contractor is required to provide a cost breakdown at time of bid. The
breakdown must equal to the total cost of the bid. If correct breakdown is not provided at
time of bid, the bid may be disqualified.

No attachments have been added to this solicitation.

PDFs are being updated, check later
Download
Daily notification on new contract opportunities

With GovernmentContracts, you can:

  • Find more opportunities and win more business
  • Receive daily alerts for all new bid opportunities
  • Get contract opportunities matched to your business
ONE WEEK FREE TRIAL

See also

...- REPLACE COMPRESSOR FOR THE PNUEMATIC SYSTEM [BID DATE CHANGED FROM 6/5/2026] details ...

General Contractors Association

Bid Due: 6/19/2026

* Disclaimer: Information regarding bids, requests for proposals (RFPs), or requests for qualifications (RFQs) is provided on this website only for convenience and does not constitute official public notice. Persons wishing to respond to or inquire about bids, RFPs, or RFQs should contact the appropriate government department.