Request for Proposals
For
Water Treatment Plant and
Hinkle to Baldwin Pipeline Valve Project
Issued Date: February 12, 2026
SAN JUAN WATER DISTRICT
9935 Auburn Folsom Road
Granite Bay, CA 95746
Ph: (916) 791-0115
www.sjwd.org
Table of Contents
I. INTRODUCTION ................................................................................................................................. 2
II. BACKGROUND ................................................................................................................................... 3
III. SCOPE OF WORK................................................................................................................................ 4
IV. AVAILABLE INFORMATION ................................................................................................................ 8
V. SCHEDULE .......................................................................................................................................... 8
VI. INFORMATION TO BE SUBMITTED IN PROPOSAL.............................................................................. 9
A. TECHNICAL PROPOSAL CONTENT................................................................................................... 9
B. COST PROPOSAL ........................................................................................................................... 11
C. NON-DISCLOSURE AND DISCLOSURE OF PROPOSALS.................................................................. 11
VII. SELECTION CRITERIA........................................................................................................................ 11
VIII. SUBMITTAL OF PROPOSALS............................................................................................................. 12
IX. PROPOSAL TERMS ........................................................................................................................... 12
Attachments:
EXHIBIT A – San Juan Water District’s Professional Services Agreement
EXHIBIT D – WTP Treated Water 1 Pipeline Inspection Summary Table and Map
San Juan Water District
1
Water Treatment Plant and Hinkle to
Baldwin Pipeline Valve Replacement Project
Request for Proposals
February 12, 2026
I.
INTRODUCTION
San Juan Water District (District) is seeking professional proposals from qualified engineering
consulting firms to provide engineering services for Water Treatment Plant and Hinkle to Baldwin
Pipeline Valve Project. The Project is located at the District’s main Corp yard in Granite Bay, CA in
Placer County.
This project consists of preparing ready for construction bid documents for the replacement a 48”
and 60” valve at the District’s water treatment plant, the construction/installation of a new 72”
valve on the Hinkle to Baldwin Pipeline (HTBPL), and internal repairs of a 60” treated water pipeline.
The location and sizes of the three valves are shown in Figure 1 below. Additionally, recognizing
that the large diameter valves have a long lead time, the consultant shall prepare a complete bid
package for the prepurchase of the three valves.
This Request for Proposals (RFP) describes the Project, the required scope of services, project
milestones, Consultant selection process, and the minimum amount of information that must be
included in the proposal. Failure to submit information in accordance with these requirements and
procedures may be cause for disqualification.
48” BYPASS
PIPELINE
60” TREATED WATER
PIPELINE (TW1)
SAN JUAN
WATER DISTRICT
60” & 48” BFVs –
REPLACE IN KIND
72” HINKLE TO
BALDWIN PIPELINE
Cooperative
Transmission
Bypass Pipeline
Figure 1: District’s Valve Replacement Locations
San Juan Water District
2
Water Treatment Plant and Hinkle to
Baldwin Pipeline Valve Replacement Project
72” BFV – NEW
INSTALLATION
Request for Proposals
February 12, 2026
II. BACKGROUND
The District is in the beginning phases of evaluating our wholesale transmission mains throughout
the District. The first phase of this project includes the restoration of the District’s Treated Water
Pipeline #1 (TW1) and evaluation of the District’s 72” HTBPL. To facilitate this work, two valves
need to be replaced or one valve installed to allow for proper isolation of the system.
The 60” diameter TW1 Pipeline and the 48” Bypass Pipeline connect at a tee located under the
drive at the Sidney N. Peterson Water Treatment Plant (WTP) (See Figure 1). Both pipelines are
cement-mortar lined and coated steel cylinder pipe conforming to the AWWA C200 specification.
Based on the Shop drawings, the pipe steel cylinder is ¼-in thick, and it is cement-mortar lined and
coated. Most of the pipeline is 45 plus years old and was constructed in 1980. Figure 2 below
shows the configuration of the 60”x48” tee connection.
Figure 2: 60" TW1 & 48" Bypass Pipeline Tee Connection
The TW1 Pipeline was evaluated in 2025. This evaluation concluded that the 48” and 60” butterfly
valves needed to be replaced. See valve observations below. The evaluation also concluded that
spot and joint repairs are needed to the mortar lining within the pipe. A table of the detailed
findings of the evaluation are provided in Exhibit B.
Table 1: 60" Treated Water Pipeline Valve Observations
Inside 60-in TW1 Pipeline at 60” The 60-in butterfly valve coating appears to be completely
butterfly valve.
gone (non-visible). Corrosion is occurring with the most
severe corrosion on the valve disc. The seating gasket is
deformed and damaged in several locations.
Inside 60-in TW1 Pipeline at 48” The 48-in butterfly valve coating appears to be completely
butterfly valve located at
gone (non-visible). Corrosion is occurring. The seating
60”x60”x48”.
gasket is damaged in several locations. Valve does not
close completely.
San Juan Water District
3
Water Treatment Plant and Hinkle to
Baldwin Pipeline Valve Replacement Project
Request for Proposals
February 12, 2026
The HTBPL is a 72” reinforced concrete pipe (AWWA 302 RCP) that extends from the District’s
Hinkle Reservoir to Baldwin Reservoir located approximately one half mile to the west. The pipeline
was installed in 1974. As part of a project completed in 2013, a cross was installed to connect the
two primary transmission mains leaving the WTP (See Figure 3). To properly isolate the HTBPL and
maintain service through Hinkle Reservoir, a new 72” valve needs to be installed west of this cross.
Figure 3: HTBPL Cross Detail
The goal of this project is for the selected Consultant to prepare and submit a ready for bid plans
and specification package for construction in summer/fall of 2026. The valve pre-purchase bid
package shall be prepared early in the design process, so that the valves can be ordered promptly.
III. SCOPE OF WORK
Interested consultants are encouraged to develop a scope of work that addresses the District’s
needs and provides value and innovation. Optional tasks recommended by the consulting firm to
enhance the work product should also be included in the proposal and shall be clearly identified as
optional items. Fully describe any exceptions to the anticipated scope as outlined in the RFP.
Identify information needs or work that the consultant expects to be completed by District staff. If
there are no expectations of District staff effort listed for a task, the District will expect the task to
be completed without any District staff time. The consulting firm selected for this Project will be
required to provide the necessary equipment, materials, and labor to complete the following
services.
Task 1 - Project Management
Throughout all tasks, the Consultant shall provide project management activities such as staffing,
subconsultant coordination, budget management, schedule management, and coordination with
San Juan Water District
4
Water Treatment Plant and Hinkle to
Baldwin Pipeline Valve Replacement Project
Request for Proposals
February 12, 2026